25.03.2020

Requirements for working documentation. Basic requirements for project and working documentation. Place of working documentation in the documentation of the construction project, SPDS


Consider all project stages in order:

Stage 1 - PP. Pre-projects (concept, sketch project)

At this stage, the concept of the future facility is being developed, the main technical and economic characteristics (TEP) are determined. A sketch is determined by planting an object on the ground, its volume and spatial solution (ODA), a constructive scheme. Also at this stage are calculated main engineering loads on water, heat and electricity, so-called at this stage. Calculation of loads.

Development Stage "PP" It is not mandatory, but helps save time and funds with further design.

Stage 2 - PD. Project documentation

In contrast to the sketch project Stage "Project" ("PD" or simply "P") is mandatory and subject to coordination in state bodies executive power. According to the results of the coordination of the "Project" stage, permission to build an object is issued. The composition and content of this stage is governed by the Decree of the Government of the Russian Federation No. 87 of February 16, 2008. Of course, the composition will be individual for each project, but we will try to draw up most full list All possible sections and subsections of the PD stage:

room Cipher section Section name
Section 1 Explanatory note
Volume 1. OPZ Explanatory note
Volume 2. Ird. Source and Permissive Documentation
Section 2. ROM Land Planning Organization Scheme
Section 3. AR Architectural solutions
Section 4. Constructive and volume planning solutions
Volume 1. KR1. Reinforced concrete structures
Volume 2. Kr2. Metal constructions
Volume 3. Kr3. Wooden designs
Volume 4. KR.R. Static calculation
Section 5. Information about engineering equipment, engineering and technical support networks, a list of engineering and technical measures, the content of technological solutions.
Subsection 1. Power supply system
Volume 1. IOS1.1 Outdoor power supply
Volume 2. IOS1.2. Power equipment
Volume 3. IOS1.3. Electric lighting
Subsection 2. Water supply system
Volume 1. IOS2.1 Outdoor water supply
Volume 2. IOS2.2. Internal water supply
Subsection 3. System of drainage
Volume 1. IOS3.1 Outdoor drainage
Volume 2. IOS3.2. Internal drainage
Subsection 4. Heating, ventilation and air conditioning, thermal networks
Volume 1. IOS4.1. Heating and ventilation
Volume 2. IOS4.2. Heat supply
Volume 3. IOS4.3. Individual thermal point
Subsection 5. Communication networks
Volume 1. IOS5.1
Volume 2. IOS5.2.
Volume 3. IOS5.3.
Volume 4. IOS5.4. CCTV
Volume 5. IOS5.5. Security alarm
Volume 6. IOS5.6
Volume 7. IOS5.7 Other low-current systems
Subsection 6. Gas supply system
Volume 1. IOS6.1. Outdoor gas supply
Volume 2. IOS6.2. Domestic gas supply
Subsection 7. Technological solutions
Volume 1. IOS7.1. Technological solutions
Volume 2. IOS7.2
Volume 3. IOS7.3. Air supply
Volume 4. IOS7.4. Fooling
Volume 5. IOS7.5. Farm supplies
Volume 6. IOS7.6. Dustovation
Volume 7. IOS7.7. Other technological systems
Section 6. Pos Project organization of construction
Section 7. UNDER Project of the organization of work on demolition or dismantling of capital construction facilities
Section 8.
Volume 1. OOS. List of environmental protection measures
Volume 2. Oos.Tr. Project Technological Regulations for Conversion to Construction Waste
Volume 3. IEI. Engineering and Environmental Exquisites
Section 9.
Volume 1. PB1 Fire Safety Activities
Volume 2. PB2.
Volume 3. PB3
Volume 4. PB4
Section 10. Odi Disabled access activities
Section 10 (1) ME Events to ensure compliance with the requirements of energy efficiency
and the requirements of the equipment of buildings, buildings and structures
Energy Resources Accounting Devices
Section 11.
Volume 1. SM1 Estimation for the construction of capital construction facilities
Volume 2. SM2. Monitoring Prices for Materials
Section 12. Other documentation in cases provided for by federal laws
Volume 1. Keo. Lighting Calculations Insolation and Natural Illumination (CEO)
Volume 2. ZH Events to protect against noise and vibrations.
Evaluation of noise impact on the period of operation of the object
Volume 3. ITM Goychs Engineering and technical measures of civil defense.
Emergency Prevention Activities
Volume 4. Ed. Building Instructions
Volume 5. PTA Activities for countering terrorist acts
Volume 6. DPB Declaration of industrial safety of hazardous production facilities

Stage 3 - RD. Working documentation

Stage "RD" First of all, the builders are needed, since design decisions are most fully and in detail, which in the "PD" stage were only designated. Unlike "P", "Raboche" includes drawings of nodes, axonometric schemes and profiles engineering networks, specifications, etc. On the other hand, at the working stage, the documentation is deprived of some sections, the completeness of which was exhausted at the project stage (for example, Housing, OOS, CEO, ITM Goicles, etc.). As in stage "P", the composition of "RD" will be individual for each project, but we will try to draw up the most complete list of all possible partitions of the "Working Documentation" stage:

Cipher section Section name
- GP General plan
- Tr. Construction facilities
- gt. General Plan and Transport (when combining GP and TR)
- hell Car roads
- PZ. Railways
- Ar. Architectural solutions
- AC. Architectural and construction solutions (when combining AR and CR)
- AI Interiors.
- kzh. Constructive decisions. Reinforced concrete structures
- KZh0. Constructive decisions. Reinforced concrete structures. Foundations
- KM. Constructive decisions. Metal constructions
- KMD Constructive decisions. Metal designs detail
- CD Constructive decisions. Wooden designs
- CRR Constructive decisions. Static calculation
- G. Hydraulic solutions
- ES. Power supply system. Outdoor power supply
- EM. Power supply system. Power equipment
- EO Power supply system. Electric lighting
- En Power supply system. Electricity outdoor
- EIS. Power supply engineering systems
- NV. Water supply system. External networks
- NK Watering system. External networks
- NK. Water supply and drainage system. External networks
- VC Water supply and drainage system. Internal networks
- Ovik Heating, ventilation and air conditioning
- TS Heat supply
- TM. Heat-mechanical solutions (boiler room, ITP, etc.)
- RT Telephony, Radio, Telepography
- SCS Structured cable networks
- AIS. Automation of engineering systems
- ATP Automation technological processes
- AK Comprehensive automation (when combining AIS and ATP)
- VN CCTV
- OS Security alarm
- SUD. Access Control and Accounting System
- GSN Outdoor gas supply
- HSV Domestic gas supply
- TX Technological solutions
- TC Technological communications
- Sun. Air supply
- xs. Fooling
- PS. Farm supplies
- Pu Dustovation
- AUPS
- Sowe.
Automatic installation of fire alarm,
The system of alert and management of the evacuation of people in the fire
- Apples Automation of fire protection
- PT. Specialdoorothery (Water, Powder, etc.)
- SD1 Estimation for the construction of capital construction facilities
- SD2. Monitoring Prices for Materials
- AZ. Anti-corrosion protection
- T. Thermal insulation of equipment and pipelines

GOST R 21.1101-2013 System project documentation:

4.2. Working documentation
4.2.1. The working documentation transmitted to the Customer includes:
- workers drawings intended for the production of construction and mounting work;
- The accompanying documents developed in addition to working drawings of the main kit.
4.2.2. The main sets of work drawings include general data on working drawings, drawings and schemes provided for by the relevant standards of the project documentation system for construction (hereinafter referred to as SPDS).
...
4.2.6. The attached documents include:
- working documentation for construction products;
- sketch drawings of common types of non-type products performed in accordance with GOST 21.114;
- the specification of equipment, products and materials performed in accordance with GOST 21.110;
- questionnaire sheets and overall drawings performed in accordance with the plant manufacturers of equipment;
- local estimate forms;
- other documents stipulated by the relevant SPDS standards.
The specific composition of the accompanying documents and the need for their implementation are set by the relevant SPDS standards and the design task.
...
4.2.8. In the working drawings it is allowed to apply typical building structures, products and nodes by references to documents containing work drawings of these structures and products. Reference documents include:
- drawings of typical designs, products and nodes;
- Standards that include drawings intended for the manufacture of products.
Reference documents are not included in the working documentation transmitted to the customer. The design organization, if necessary, conveys them to the customer under a separate contract.

Snip 11-01-95 Composition of working documentation:

5.1. The composition of the working documentation for the construction of enterprises, buildings and structures is determined by the relevant government standards of the SPDS and is clarified by the Customer and the designer in the contract (contract) for design.

5.2. Government, industry and republican standards, as well as drawings of typical designs, products and nodes to which there are references in working drawings, are not included in the working documentation and can be transmitted to the designer to the customer, if specified in the contract.

GOST 21.101-97

UDC 691: 002: 006.354

Interstate standard

System of design documents for construction

Basic requirements for project and working documentation

System of Design Documents for Construction.

Main Requirements for Design and Working Documents

OX 01.100.30

Date of introduction 1998-04-01

Preface

1 Developed by a state-owned enterprise - the center of the methodology, rationing and standardization in construction (GP Central SNS) Gosstroy Russia

Department of Development of Scientific and Technical Policy and Design and Exploration Works Gosstroy Russia

2 Adopted by the Interstate Scientific and Technical Commission for Standardization, Technical Registration and Certification in Construction December 10, 1997.

3 was put into effect from April 1, 1998 as the State Standard of the Russian Federation by the Resolution of the Gosstroy of Russia from 29.12.97 No. 18-75

4 Instead of GOST 21.101-93

1 area of \u200b\u200buse

Real Standard Sets the basic requirements for project and working documentation for the construction of enterprises, buildings and structures of various purposes.

General rules execution of graphic and text documentation established in Section 5 of this Standard also apply to the reporting technical documentation for engineering Exquisites for construction.

GOST 2.004-88 ECCD. General requirements for the implementation of design and technological documents on the printing and graphic devices of the Output

GOST 2.101-68 ECCD. Types of products

GOST 2.102-68 ECCD. Types and completeness of design documents

GOST 2.105-95 ECCD. General requirements for text documents

GOST 2.108-68 ECCD. Specification

GOST 2.109-73 ECCD. Basic requirements for drawings

GOST 2.113-75 ECCD. Group and Basic Design Documents

GOST 2.114-95 ECCD. Technical conditions

GOST 2.301-68 ECCD. Formats

GOST 2.302-68 ECCD. Scale

GOST 2.303-68 ECCD. Lines

GOST 2.304-81 ECCD. Drawing fonts

GOST 2.305-68 ECCD. Images - species, cuts, sections

GOST 2.306-68 ECCD. Designations Graphic materials and rules for their application in drawings

GOST 2.307-68 ECCD. Differences and limit deviations

GOST 2.308-79 ECCD. Note on drawings tolerances forms and location of surfaces

GOST 2.309-73 ECCD. Roughness designation surfaces

GOST 2.310-68 ECCD. Application in drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68 ECCD. Image of thread

GOST 2.312-72 ECCD. Conditional images and designations of welded joints

GOST 2.313-82 ECCD. Conditional images and notation of all-point connections

GOST 2.314-68 ECCD. Instructions in the drawings on the labeling and branding of products

GOST 2.316- 68 ECCD. Application rules on the drawings of the inscriptions, technical requirements and tables

GOST 2.317-69 ECCD. Axonometric projections

GOST 2.410-68 ECCD. Rules for performing drawings of metal structures

GOST 2.501-88 ECCD. Rules for accounting and storage

GOST 21.110-95 SPDS. Specification of equipment, products and materials

GOST 21.113-88 SPDS. Characteristics of accuracy

GOST 21.114-95 SPDS. Rules for performing draft drawings of common types of non-type products

GOST 21.203-78 SPDS. Rules for accounting and storage of original project documentation

GOST 21.501- 93 SPDS. Rules for the implementation of architectural and construction work drawings.

3 General documentation requirements

3.1 The composition and content of project documentation for the construction of enterprises, buildings and structures is established by the current construction norms and regulations.

3.2 The working documentation for the construction of a building or structure in the general case includes:

a) workers drawings intended for the production of construction and installation work;

b) working documentation for construction products according to GOST 21.501;

c) sketch drawings of common types of non-type products according to GOST 21.114 *;

d) specifications of equipment, products and materials according to GOST 21.110;

e) another accompanying documentation provided for by the relevant standards of the project documentation system for construction (SPDS);

e) estimated documentation on established forms.

4 General Requirements for the Acquitations of Documentation

4.1 Project documentation

4.1.1 Project documentation for approval (stage-project, approved by part of the working draft), is equipped in Tom, as a rule, according to individual sections provided for by the construction regulations and regulations. Each volume is numbered by Arabic numbers.

Example - Volume 1 - Total explanatory note

Volume 2 - general plan and transport

If necessary, volumes are divided into parts. In this case, the volume is numbered by type: volume 1.1, volume 1.2.

4.1.2 Text and graphic materials included in the complete, as a rule, in the following order:

Cover;

Title page;

Project composition;

Explanatory note;

The main drawings provided for by the construction standards and regulations.

The rules for designing the cover, the title list, the content and composition of the project are given in section 9.

4.1.3 Each text and graphical document included in the assignment that indicates title page And in the main inscriptions.

The designation includes a basic designation installed on the system currently operating in the organization, and through the hyphen - brand and / or code section of the project. The brands of the project sections are made by analogy with the brands of the main sets of work drawings given in Appendix A.

Examples

1. 2345-PZ Section "General Explanatory Note"

2. 2345-GT section "General Plan and Transport"

3. 2345-12-AC Section "Architectural and Construction Solutions",

PZ - project section cipher;

GT and AC - project sections brands.

________________

4.1.4 Text and graphic materials, as a rule, include on sheets folded according to A4 GOST 2.301.

Each volume includes no more than 250 sheets of A4 format, 150 sheets of A3 format, 75 sheets of format A2 and 50 sheets of A1 format.

4.1.5 General requirements for the execution of graphic documentation are given in section 5.

Text documents are performed according to GOST 2.105, taking into account the requirements of Section 5 of this Standard.

4.2 Workers drawings

4.2.1 Working drawings intended for the production of construction and installation work are combined into kits (hereinafter main sets) on stamps in accordance with Appendix A.

4.2.2 The main set of work drawings of any brand can be divided into several basic sets of the same brand (with the addition of the sequence number) in accordance with the process of organizing construction and installation work.

Example - AC1; AC2; Kzh1; Kzh2.

4.2.3 Each basic set of working drawings is assigned the designation, which includes the basic designation installed on the system currently in force, and through the hyphen - the brand of the main kit.

Example - 2345-12-AR,

where 2345 is the contract number (contract) or cipher of the construction object;

12 - Room of the building or facilities by the General Plan *;

2345-12 - basic designation;

Ar is the brand of the main set of work drawings.

________________

* For partitions of the project related to the construction object as a whole (general explanatory note, the master plan and transport, etc.), as well as for the working drawings of linear structures, the master plan, outdoor communications, this part of the basic designation is usually excluded.

4.2.4 The main sets of work drawings include general data on working drawings, as well as drawings and schemes provided for by SPDS standards.

General data on working drawings

4.2.5 In the first sheets of each main set of work drawings, provide general data on working drawings, including:

a) the statement of the working drawings of the main kit in form 1;

b) the statement of reference and accompanying documents in form 2;

c) statement of the main sets of work drawings in form 2;

d) the statement of specifications (if there is mainly a set of several location schemes), performed in form 1.

e) the symbols not established by state standards and the meaning of which are not indicated on other sheets of the main set of work drawings;

e) general guidelines;

g) other data provided for by the relevant SPDS standards.

Forms 1 and 2 with instructions on their completion are given in Appendix B.

4.2.6 The statement of the working drawings of the main kit contains a consistent list of sheets of the main kit.

4.2.7 The statement of reference and attached documents is partitions:

a) reference documents;

b) the accompanying documents.

The "Reference Documents" section indicate the documents to which links in the working drawings are given, including:

a) drawings of typical designs, products and nodes with the name and indication of the series and the release numbers;

b) Standards that include drawings intended for the manufacture of products, indicating their name and notation.

Reference documents The project organization issues the Customer only on a separate contract.

The "Acceived Documents" section indicates the documents developed in addition to working drawings of the main kit, including:

Working documentation for construction products;

Sketch drawings of common types of non-type products *;

Specification of equipment, products and materials;

Local estimate;

Another documentation provided for by the relevant SPDS standards.

The accompanying documents of the project organization issues the Customer simultaneously with the main set of work drawings.

4.2.8 The statement of the main sets of work drawings leads on sheets of general data of the main set of the leading brand **.

If there are several main sets of working drawings of one brand, they constitute the statement of sets of this brand in form 2 of the application b, which is given on a sheet of common data for each of these sets.

* Perform if necessary.

** The main set of work drawings as the leading brand appoints the general designer.

4.2.9 In general directions, lead:

a) the basis for the development of working documentation (task for design, approved project);

b) the mark, adopted in the working drawings of the building or the construction conditionally for zero (as a rule, lead to architectural and construction drawings);

c) Recording on the results of verification of patentability and patent purity for the first time applied or developed in the project of technological processes, equipment, instruments, structures, materials and products, as well as numbers of copyright certificates and applications for which decisions have been made on issuing copyright certificates used in the working documentation of the invention;

d) record that work drawings are designed in accordance with applicable rules, rules and standards;

e) a list of types of work for which the acts of examination of hidden works should be compiled;

(e) Information about who owns this intellectual property (if necessary);

g) other necessary instructions.

In general guidelines, it should not be repeated technical requirements placed on other sheets of the main set of work drawings, and give a description of the technical solutions adopted in the working drawings.

5. General rules for execution of documentation

5.1 When performing project, working and other technical documentation, intended for the construction of enterprises, buildings and structures, the requirements of the relevant SPDS standards should be guided by the requirements of the unified system of design documentation (ECCD).

The list of ECC standards subject to accountable when performing graphic and text documentation for construction, is given in Appendix V.

The documentation intended for microfilming must comply with the requirements of the Reprography Standards System.

5.2 Drawings are performed at an optimal scale, taking into account their complexity and saturation of information.

The scale in the drawings do not indicate, with the exception of product drawings and other cases provided for in the relevant SPDS standards.

5.3 The list of cuts of words allowed in the main inscriptions, specifications, tables, drawings and specifications compiled in addition to GOST 2.316 and is given in Appendix G.

Coordination axes

5.4 In the image of each building or structure, the coordination axes indicate and assign them an independent system of designations.

Coordination axes are applied to the images of the building, facilities with thin barccotted lines with long strokes, denote by the Arabic numbers and the capital letters of the Russian alphabet (with the exception of letters: E, 3, th, o, x, c, h, s, ъ, s, b) In the circles with a diameter of 6-12 mm.

Skipping in digital and letter (except indicated) designations of coordination axes are not allowed.

5.5 figures indicate the coordination axes on the side of the building and facilities with a large number of axes. If there is not enough alphabet letters to designate the coordination axes, the subsequent axes are denoted by two letters.

Example - Aa; BB; Explosive

5.6 The sequence of digital and letter designations of the coordination axes take according to the plan from left to right and bottom up (Figure 1 but) or as shown in Figures 1 b., in.

5.7 The designation of the coordination axes is usually applied on the left and lower parties of the plan of the building and construction.

If the coordination axes of the opposite sides are discharged, the indication of the specified axes in the locations of discrepancies are additionally applied on top and / or right parties.

5.8 For individual elements located between the coordination axes of the main supporting structures, additional axes are applied and referred to them in the form of a fraction:

above the line indicate the designation of the preceding coordination axis;

under the line - an additional sequence number within the section between adjacent coordination axes in accordance with Figure 1 g.

Picture 1

It is allowed by the coordination axes of the half-timbered columns to assign digital and alphabetic designations to the continuation of the designations of the axes of the main columns without an additional number.

5.9 In the image of a repeating element attached to several coordination axes, coordination axes are denoted in accordance with Figure 2:

« but"- with the number of coordination axes of no more than 3;

« b.»-» »» »Over 3;

« in"- with all alphabetic and digital coordination axes.

If necessary, the orientation of the coordination axis, to which the element is attached relative to the neighboring axis, indicate in accordance with Figure 2 g..

Figure 2.

5.10 In order to designate the coordination axes of the residential building blocks, the index "C" is used.

Example - 1C, 2C, AC, BS.

On the plans of residential buildings arranged from block sections, the extreme coordination axes of block sections indicate without an index in accordance with Figure 3.

Figure 3.

Drawing, slopes, marks, inscriptions

5.11Realted line on its intersection with remote lines, loop lines or axial lines are limited by serifs in the form of thick main lines of 2-4 mm long, carried out with a slope to the right at an angle of 45 ° to the dimensional line, while the dimensional lines must appear for extreme remote lines. 1-3 mm.

When applying the size of the diameter or radius inside the circle, as well as the angular size of the dimension line is limited by arrows. Arrows are also used when applying the sizes of radii and internal rounds.

5.12 Level marks (heights, depths) of structural elements, equipment, pipelines, air ducts, etc. From the reference level (conditional "zero" mark) designate a conditional sign in accordance with Figure 4 and indicate meters with three decimal signs separated from an integer number. comma.

Figure 4.

The "zero" mark received, as a rule, for the surface of a building of a building or structure, located near the planning surface of the Earth, indicate without a mark; marks above zero - with a "+" sign; Below zero - with a sign "-".

On the types (facades), cuts and sections of the marks indicate remote lines or contour lines in accordance with Figure 5, on the plans - in a rectangle in accordance with Figure 6, except in cases specified in the relevant SPDS standards.

5.13 On the plans, the direction of the linker of the planes indicate the arrow over which, if necessary, is affixed by the magnitude of the slope in percent in accordance with Figure 7 or as a ratio of height and length (for example, 1: 7).

It is allowed, if necessary, the magnitude of the slope is indicated in the PROMILL, in the form of a decimal fraction with an accuracy of the third mark. In the drawings and schemes before the dimensional number that determines the magnitude of the slope, the sign "Ð" is applied, the sharp angle of which should be directed towards the slope.

The designation of the slope is applied directly above the line of the contour or on the shelf of the lifting line.

Figure 5.

Figure 6.

Figure 7.

5.14 Remote inscriptions to multi-layer structures should be performed in accordance with Figure 8.

5.15 Rooms of positions (stamps of elements) are applied on shelves of lines of calls conducted from images component parts Items, next to the image without a lifting line or within the contours of the pictures of the object in accordance with Figure 9.

With a small-scale image, the lifting line finish without arrow and point.

5.16 The font size for referring to the coordination axes and positions (grades) must be on one or two rooms more than the font size adopted for the dimensional numbers on the same drawing.

Images (cuts, sections, species, fragments)

5.17 Cuts of buildings or structures are denoted by Arabic numbers sequentially within the main set of work drawings.

Independent numbering is allowed only for cuts of individual sections of the building, structures or installations, all the drawings of which are located on one sheet or sheet of sheets and if there are no references to cuts on these drawings located on other sheets of the main set of work drawings.

Sections are allowed to designate the capital letters of the Russian alphabet.

The direction of the view for a cut according to the plan of the building and the facilities is taken, as a rule from the bottom up and right to the left.

5.18 If separate parts of the form (facade), the plan, the cut require a more detailed image, then the remote elements are additionally performed - nodes and fragments.

5.19 When the node is image, the corresponding place is noted on the form (facade), plan, or a context with a closed solid thin line (usually a circle or oval) with a designation on the shelf of the lines of the sequence number of the Arabic node number in accordance with Figure 10.

If the node is placed on another sheet, then the number of the sheet is indicated under the shelf of the lifting line (Figure 10 but) or on the shelf of the lifting line next, in brackets, in accordance with Figure 10 b..

If necessary, reference to the node placed in another main set of work drawings, or on a typical node, indicate the designation and number of the sheet of the corresponding main set of work drawings in accordance with Figure 10 in Or a series of working drawings of typical nodes and a release number in accordance with Figure 10 g..

Figure 10.

On the image of the node indicate in the circle its serial number in accordance with Figure 12 but or 12. b..

Figure 11.

Figure 12.

An assembly, which is a complete mirror reflection of another (main) execution, is assigned the same sequence number as the main execution, with the addition of the "N" index.

5.20 Fragments of plans, cuts, facades, as a rule, are noted by a curly brace in accordance with Figure 13.

Figure 13.

Under the figure bracket, as well as the corresponding fragment, the name and sequence number of the fragment are applied. If the fragment is placed on another sheet, then give a link to this sheet.

5.21 images to the axis of symmetry of symmetric plans and facades of buildings and structures, arrangement of structural elements, plans for the location of technological, energy, sanitary and other equipment are not allowed.

5.22 If the image (for example, the plan) does not fit on the sheet of adopted format, then it is divided into several sections, placing them on separate sheets.

In this case, on each sheet, where the image section is shown, the scheme of a whole image with the necessary coordination axes and the symptoms (shading) of the image section shown on this sheet according to Figure 14 are shown on this sheet.

Note - If the drawings of the images of the image are placed in different basic sets of work drawings, then above the sheet number indicates the designation of the corresponding main kit (according to 4.2.2)

Figure 14.

5.23 if floors multi-storey building They have small differences from each other, then fully fulfill the plan of one of the floors, for other floors there are only those parts of the plan that are necessary to display the difference from the plan shown in full.

Under the name of the partially depicted plan, record:

"The rest, see the Plan (name of the fully depicted plan)."

5.24 In the names of the flood plans of the building and structures indicate the netting of the net or floor number, or the designation of the corresponding secular plane.

Examples

1. Plan for OTM. 0,000

2. Plan 2 - 9 floors

3. Plan 3 - 3

When performing a part of the plan in the title indicate axes that limit this part of the plan.

Example - Plan for OTM. 0,000 between axes 1 - 8 and a - d

It is allowed in the title of the floor plan to indicate the purpose of the premises located on the floor.

5.25 In the names of the cuts of the building (structures), indicate the designation of the corresponding secular plane.

Example - Cut 1 - 1

5.26 In the names of the facades of the building and structures indicate the extreme axes, between which the facade is located.

Example - Facade 1 - 12

Main inscriptions

5.27 Each sheet of graphic and text document must have the main inscription and additional graphs for it. The forms of the main inscriptions and instructions on their completion are given in Appendix D.

5.28 In the design and working documentation, the main inscription is issued:

a) on sheets of basic sets of work drawings and basic drawings of project documentation - in form 3;

b) on the first sheet of drawings of construction products - in form 4;

c) on the first sheets of text documents and sketch drawings of common types of non-type products - in form 5;

d) on subsequent sheets of drawings of construction products, text documents and sketch drawings of common species - in form 6.

It is allowed on the first sheet of the construction product drawing the main inscription in shape 5.

5.29 In the reporting technical documentation on the results of engineering surveys, the main inscription is issued:

a) on sheets of graphic documents used in the design as a cauldron - in form 3;

b) on the first sheets of other graphic and text documents - in form 5, on subsequent sheets - in form 6.

5.30 The location of the main inscription and additional graph to it, as well as the dimensional framework on the sheets, are given in Appendix E.

5.31 Main inscriptions, additional graphs for them and frames are performed by solid thick basic and solid thin lines according to GOST 2.303 in accordance with the D. Annex

5.32 Graphic and text documents, brocked in the form of volumes, album, release or in another publishing form, are designated with a title list.

The rules for performing the title list are given in section 9.

5.33 The title page is allowed not to perform and not block text working documents of a small volume. In this case, the first sheet of the document is drawn up by the main inscription in form 3, subsequent - in form 6.

6 Rules for performing specifications in the drawings

6.1 To the location of the elements of the prefabricular design, monolithic reinforced concrete design, to the drawings of the installations (blocks) of technological, sanitary and other equipment are the specification in form 7 of the application J.

When performing drawings by the group method, group specifications in the form of 8 applications are

6.2 Construction Specifications are according to GOST 21.501.

7 Rules Amendments to working documentation issued to the Customer

7.1 Changing the working document previously issued to the Customer is any correction, exception or adding any data to it without changing the designation of this document. The designation of the document is allowed to change only when different documents are erroneously assigned the same designations or an error is made in the designation.

7.2 Changes contribute to the original document. Making changes to calculations is not allowed.

7.3 Copies of sheets (modified, additional and released instead of replaced sheets) of working documentation guide to organizations that were previously sent copies of documents, simultaneously with copies of the general data of the corresponding basic set of work drawings specified in accordance with paragraph 7.5.

7.4

7.4.1 Changing the document is performed on the basis of permission to make changes (hereinafter - permission) compiled in form 9 of Annex I.

The permission approves the head of the document developer organization or on his instructions another official.

7.4.2 The basis for obtaining original documents for making changes to the changes is permission.

7.4.3 Changes to each document (for example, the main set of work drawings, the specification of equipment and materials equipment) is made in a separate resolution.

It is allowed to make one general permission to change, introduced simultaneously in several documents if the changes are interconnected or the same for all changeable documents.

7.5 Alteration

7.5.1 Changes to the original documents are made by overclocking or clearing (washing). At the same time take into account the physical state of the original.

7.5.2 After making changes, letters, numbers, signs should be clear, thickness of lines, the magnitude of the lumen, etc., must be implemented according to the rules provided for by the relevant ECCD standards and Reprography standards system.

7.5.3 Changeable sizes, words, signs, inscriptions, etc. Excrying with solid thin lines and there are new data.

7.5.4 When the image is changed (part of the image), it is reduced by a solid thin line forming a closed loop, and crucifically crossed with solid thin lines.

A new image of the changed area is performed on a free field of a sheet or on another sheet without turns.

7.5.5 A variable, canceled and additional sections of the image assign the designation consisting of the sequence number of the next document change and through the point of the sequence number of the variable (canceled, additional) section of the image within this sheet. In this case, the new image of the changed area is assigned the designation of the changed image.

If a new image of the changed area is placed on another sheet, the changes assigned to it is preserved and in the table of changes of this sheet do not take into account.

7.5.6 Near each change, including about a change corrected by the clearing (washed), outside the image is applied to the parallelogram the designation of the change in accordance with Figure 15.

Figure 15.

From the parallelogram spend a solid thin line to the changed area.

7.5.7 Closely located varied dimensions, words, signs, inscriptions, etc. They will be reduced with a solid thin line, forming a closed circuit, without crushing in accordance with Figure 16.

7.5.8 If a new image of the modified area is placed on another sheet, then the replaced image also indicates the number of the sheet on which the new image is located in accordance with Figure 17.

Figure 16.

Figure 17.

7.5.9 Over the new image of the changed area is placed in the parallelogram, the designation of the change in the replaced image is placed, and at a parallelogram indicate: "In return crushed."

If a new image of the modified area is placed on another sheet, then at a parallelogram indicate: "In addition to the listed on the sheet (the sheet number on which the image is replaced)" in accordance with Figure 18.

Figure 18.

7.5.10 If a new image of the modified area is placed near the replaced, they are connected by liners with the notation of the change in accordance with Figure 19.

Figure 19.

Over the optional image is placed in the parallelogram the designation of the change, and at the parallelogram indicate: "Supplement" in accordance with Figure 20.

Figure 20.

7.5.11 When canceling an image (part of the image), the change indicates: "canceled".

7.5.12 If there is not enough space for making changes or a violation of the definition of the image when corrected is possible, then a new script is manufactured taking into account the changes made and retain its former designation.

If one or more of the script sheets is replaced or add, then they retain them inventory numberassigned to the script.

When replacing all the script sheets, he is assigned a new inventory number.

7.5.13 When making changes to the sheets of the main set of work drawings in the statement of the working drawings of this kit on the sheets of common data in the "Note" column indicate:

a) when making the first change - "Change. 1".

When submitting subsequent changes - additionally, the next number numbers, separating them from the previous point with a comma.

Example - Change one; 2; 3.

b) on the replaced sheets under the change number - "(deputy.)."

Example - Change 1 (deputy)

c) on canceled sheets with the change number - "canceled".

Example - Change 1 (canceled)

d) on additional sheets with the change number - "(new)".

Example - Change 1 (new)

7.5.14 If the main set of work drawings include additional sheets, then they are assigned the next ordinal numbers and recorded in the continuation of the statement of the work drawings of the corresponding main kit.

With a lack of space in the statement of work drawings for recording additional sheets, the continuation of the statement is transferred to the first of the additional sheets. At the same time, at the end of the statement of work drawings placed in "General Data", record:

"For a continuation of the statement, see the sheet (sheet number)", and above the statement on the additional sheet, the title is placed: "The statement of the work drawings of the main kit (continued)."

The rooms and the names of the annulled sheets in the statement of the work drawings are burned.

When changing the names of sheets, appropriate changes in the Count "Name" are made.

7.5.15 With the change in the total number of sheets of the document on its first sheet in the main inscription, appropriate changes in the "Sheets" column are made.

7.5.16 When performing additional and cancellation of previously executed accompanying documents, corrections make corrections to the statement of reference and accompanying documents of the corresponding major set of work drawings.

7.5.17 When performing additional and cancellation of previously completed main sets of work drawings, corrections contribute to the statement of the main sets of work drawings.

7.5.18 Changes made to the script indicate a change table placed in the main inscription.

A table of change is allowed to put out the main inscription (above it or to the left of it) in the same form.

7.5.19 In the Change Table indicate:

a) in the column "Izm." - the sequence number of document change;

b) in the column "count. uch." - the number of variable sections of the image on this sheet within the next change;

c) in the column "Sheet" - on sheets released instead of replaced, "deputy.", on sheets added again, - "New".

When replacing all the sheets of the original (with the next number of document change) on the first sheet in the "Sheet" column indicate "All". At the same time, the table of changes on other sheets of this script is not filled.

In other cases, the column "Sheet" is puffed;

d) in the column "no doc." - permit designation;

e) in the column "sub." - the signature of the person responsible for the correctness of the changes (the signature of the person responsible for the normocontrol is put on the field to cover sheet);

e) in the "Date" column - the date of change.

7.5.20 The change table does not take into account the corrections made in the master data sheet in connection with the introduction of changes in the sheets of the main kit and the accompanying documents.

7.5.21 When you make changes to text documents, it is recommended to perform a table of registration of changes in form 10 of the position K. The registration table is placed on the title page of the text document.

7.5.22 Significant changes in text documents make one of the following ways:

a) replacing all or individual sheets of the document;

b) the release of new additional sheets.

When text documents are changed, it is allowed when adding a new sheet to assign the number of the previous sheet with the addition of another Arabic digit, separating it from the previous point.

Example - 3.1

In this case, on the first sheet, the total number of sheets change.

In text documents containing mainly solid text, it is allowed when adding a new item to assign it the number of the previous point with the addition of the next lower case letter of the Russian alphabet, and when the item is canceled - to save subsequent points numbers.

7.5.23 When canceling or replacing the document, all annulled and replaced sheets of the original are crosswise crossed with solid thin lines and stamped the stamp in form 11 of the application L.

8 Rules for binding working documentation

8.1. Working documentation - typical projects, typical design solutions (intended for binding) and working documentation of re-use are subject to reference to a specific construction site. On each sheet of the link documentation put a binding stamp in accordance with the application M:

a) on the first sheet - in form 12;

b) on subsequent sheets - in form 13.

8.2 covers and title sheets of basic sets of work drawings typical projects (typova design solutions), published in the form of albums and issues, do not bind and do not send the customer.

8.3 The binding stamp is applied on a free field sheet, preferably above the main inscription or to the left of it.

8.4 It is allowed not to apply a binding stamp on immutable working drawings of structures, products and nodes if they are reused by the organization that has implemented the development and approval of these drawings. Specified work drawings are recorded in the section of the attached documents without changing the designation.

8.5 Changes in binding are made in accordance with PP. 7.5.1 - 7.5.4, 7.5.14-7.5.17 and subject to the following additional requirements:

a) if the variable sections of the image are two or more, then they are assigned sequence numbers that are affixed by Roman numbers on the shelf of the lifting line in accordance with Figure 21;

b) above the modified site indicate the Roman number of the sequence number of the variable portion of the image and the inscription "instead of crossed" in accordance with Figure 22.

If a new image (part of the image) is placed on another sheet, then the replaced image also indicates the number of the leaf on which the new image is located.

Figure 21.

Figure 22.

8.6 Basic inscriptions on sheets of the binding documentation published in the form of albums and issues are left unchanged.

8.8 Announced sheets exclude from the bound documentation without changing the total numbering of sheets.

9 Rules for issuing discharged documentation

9.1 Each discharged document is drawn up with a cover in form 14 given in Appendix N. The cover does not number and do not include in the total number of pages.

9.2 The first sheet of textual (graphic) document or several shutdown documents is the title page. The title page is performed in form 15 of the application P. Example of filling the title leaf is given there.

9.3 All sheets of a discrepanied document, starting with the title, must have through page numbering. At the same time, the title page does not name.

Page number on sheets of text and graphics documents is indicated in the upper right corner of the sheet of the sheet.

In addition, in the main inscription of text and graphics documents included in the album or release and having an independent designation, indicate the sequid numbering of sheets within the document with one designation.

9.4 When recruiting several documents in the form of volume, album or release after the title leaf, lead "content", which is performed in form 2 of the application B.

The first sheet of "content" is drawn up the main inscription in form 5 of Annex D, subsequent - in form 6 of the application D. "Content" assign the designation consisting of the designation of the document and the cipher "C".

Example - 2345-GT.S, 2345-11-kzh.Is, 2345-11-TX.NS

9.5 Title sheets of project documents are written in signatures:

supervisor or chief engineer organization;

chief engineer (architect) project.

Title sheets of working documents are issued by the signature of the responsible person - the chief engineer (architect) of the project.

The title list of reporting survey documentation is issued with the additional requirements of the relevant construction norms and rules.

9.6 The composition of the project, according to 4.1.2, lead in the statement performed in form 16 of the application R.

The statement leads a consistent list of project documentation volumes.

The first sheet of statement is drawn up by the main inscription in form 5 of the application D, subsequent - in form 6 of the application D.

Vedomosti assign the designation consisting of the basic designation of the document and through the hyphen - the cipher "SP".

Example - 2345-SP.

Brands of the main sets of work drawings

Table A.1.

Name of the main set of work drawings

Note

Production technology

Technological communications

When combining workers' drawings of all technological communications

General Plan and Transport Construction

When combining work drawings of the master plan and transportation structures

General plan

Architectural solutions

Interiors.

Working drawings can be combined with the main set of the AR and AC brand

Constructs are reinforced concrete

Wooden designs

Architectural and construction solutions

When combining work drawings of architectural solutions and building structures

Metal designs detail

Water pipe and sewage

Heating, ventilation and air conditioning

Teplomechanical solutions of boiler rooms

Air supply

Dustovation

Fooling

Gas supply ( internal devices)

Power equipment

Electric lighting (internal)

Communication systems

Radio communication, broadcasting and television

Firefighting

Fire alarm

Security and Security and Fire Alarm

Hydraulic solutions

Automation ...

Many replace the name and brand of the corresponding main set of work drawings

Automation complex

When combining workers' drawings of various technological processes and engineering systems

Anticorrosive protection of structures, structures

Anticorrosive protection of technological apparatus, gas ducts and pipelines

Thermal insulation of equipment and pipelines

Car roads

Railways

Construction of motor vehicles

When combining workers' drawings of automotive, iron and other roads

Exterior Water Supply Networks

Outdoor sewage networks

Outdoor network of water supply and sewage

When combining workers' drawings of external water supply and sewage networks

Heat mechanical solutions of thermal networks

Outdoor gas pipelines

Outdoor electric light

Power supply

Note ¾ If necessary, additional brands of the main sets of work drawings can be appointed. At the same time, capital letters (not three) of the Russian alphabet, corresponding to the brands, apply for stamps, appropriate, as a rule, the initial letters of the names of the main set of work drawings.

Appendix B.

(mandatory)

Vedomosti shared data on working drawings

Form 1. - statement of working drawings of the main kit

Statement of specifications

Instructions for filling out the statement of working drawings of the main kit

In the statement of the working drawings, the main set indicate:

a) in the column "Sheet" - the sequence number of the sheet of the main set of work drawings;

b) in the "Name" column - the name of images placed on a sheet, in exact accordance with the names given in the main inscription of the sheet;

c) in the column "Note" - additional information, for example, changes made in the working drawings of the main kit.

Instructions for filling the statement of specifications

In the statement of specifications indicate:

a) in the column "sheet" - the number of the sheet of the main set of work drawings on which the specification is placed;

b) in the "Name" column - the name of the specification in exact accordance with its name indicated in the drawing;

c) in the "Note" column - additional information, including changes made in the specification.

Form 2. - statement of the main sets of work drawings

The statement of reference and accompanying documents

Instructions for filling out the statement of the main sets of work drawings

In the statement of the main sets of work drawings indicate:

a) in the graph "Designation" - the designation of the main set of work drawings and, if necessary, the name or distinctive index of the organization that has issued a document;

b) in the "Name" column - the name of the main set of work drawings;

c) in the column "Note" - additional information, including changes in the main sets of work drawings.

Instructions for filling the statement of reference and accompanying documents

The statement of reference and accompanying documents indicate:

a) in the graph "Designation" - the designation of the document and, if necessary, the name or distinctive index of the organization that issued the document;

b) in the "Name" column - the name of the document in full accordance with the name specified on the title page or in the main inscription;

c) in the "Note" column - additional information, including changes made to recorded documents included in the working documentation.

Appendix B.

Mandatory

List of ESCD standards subject to accountable when performing graphic and text documentation for construction

Table B.1.

Designation and name of the standard

Conditions for applying Standard

GOST 2.004-88

ESKD. General requirements for the implementation of design and technological documents on the printing and graphic devices of the Output

GOST 2.101-68.

ESKD. Types of products

GOST 2.102-68

ESKD. Types and completeness of design documents

Taking into account the requirements of GOST 21.501, belonging to the performance of the drawings of construction products

GOST 2.105-95

ESKD. General requirements for text documents

Taking into account the requirements of Section.4, 5 and 9 of this standard

GOST 2.108-68

ESKD. Specification

Taking into account the requirements of Section 6 of this Standard and GOST 21.501

GOST 2.109-73

ESKD. Basic requirements for drawings

GOST 2.113-75

ESKD. Group and Basic Design Documents

Taking into account the requirements of GOST 21.501

GOST 2.114-95

ESKD. Technical conditions

Taking into account the requirements 5.27, 5.28, 5.30-5.32 of section 5 and Section 9 of this Standard. 3.7.1 and 3.8 GOST 2.114 do not take into account

GOST 2.301-68.

ESKD. Formats

Taking into account the requirements of the relevant SPDS standards

GOST 2.302-68.

ESKD. Scale

GOST 2.303-68

ESKD. Lines

GOST 2.304-81

ESKD. Drawing fonts

GOST 2.305-68.

ESKD. Images - species, cuts, sections

Taking into account the requirements 5.17-5.26 of this standard

GOST 2.306-68

ESKD. Designations Graphic materials and rules for their application in drawings

Taking into account the requirements of GOST 21.302, Tables 4 and 5

GOST 2.307-68.

ESKD. Differences and limit deviations

Taking into account the requirements 5.11-5.13 of this standard

GOST 2.308-79

ESKD. Note on drawings tolerances forms and location of surfaces

Taking into account the requirements of GOST 21.113

GOST 2.309-73

ESKD. Roughness designation surfaces

GOST 2.310-68.

ESKD. Application in drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68

ESKD. Image of thread

GOST 2.312-72

ESKD. Conditional images and designations of welded joints

GOST 2.313-82

ESKD. Conditional images and notation of all-point connections

GOST 2.314-68

ESKD. Indications in drawings on marking and branding products

GOST 2.315-68

ESKD. Images simplified and conditioner fasteners

GOST 2.316-68

ESKD. Rules for applying in drawings of inscriptions, technical requirements and tables

Taking into account the requirements 5.14-5.16 of this standard

GOST 2.317-69

ESKD. Axonometric projections

GOST 2.410-68

ESKD. Rules for performing drawings of metal structures

GOST 2.501-88 ECCD. Storage Accounting Rules

In the form of the inventory book, subscriber card and instructions for folding drawings

Note - The conditions for the application of ECC standards of the classification group 7 are defined by the relevant SPDS standards.

List of permissible cuts of words (Supplement to GOST 2.316)

Table G.1.

Full name

Abbreviation

Highway

Antisaismic seam

Architect

Asphalt concrete

Concrete, concrete

Ventilation camera

ventscamera

Chief Engineer

GL Ing. (*)

Chief Engineer (Architect) of the Project

GUI (HAP) (*)

Chief Specialist

GL specialist. (*)

Expansion joint

Director

Document

Permissible

unit of measurement

Units. change (t)

EMK. (C, T)

Railway

Reinforced concrete, reinforced concrete

Head

Insulation, isolation

Institute

Design

Coefficient

Efficiency

Staircase, stairs

Workshop (in project organizations)

Materials

mat-lies

Mounting

norm. Narr.

Equipment

Checked

calculate Narr.

Sanitary-technical

san. tehn

Toilet

san. knot

Well

Snow

Temperature seam

Technological

Rail head level

ur. G. R. (and)

Ground level

Pure floor level

ur. h. p. (and)

Foundation

Cement, cement

Cement concrete

Plaster

Crushed stone, rubble

Electric

eL-T (and. T)

Note - Abbreviations marked with a sign (*) apply only in the main inscription; (T) - in the tables; (C) - with numbers or ciphers; (and) - in graphic images

Appendix D.

(mandatory)

Basic inscriptions and additional graphs for it

Form 3 - For sheets:

major sets of work drawings;

major drawings of project documentation sections;

graphic Documents on Engineering Exquisites


Form 4 - DLi draw construction products (first sheet)


Form 5 - For All types of text documents (first sheets)


Note - The main inscription in form 5 is allowed to use for graphic documents on engineering surveys that are not used as a shipment

Form 6 - For drawings of building products and all types of text documents (subsequent sheets)

Note - The main inscription in form 6 is allowed to be used for graphic documents on engineering surveys not used as a share

Instructions for filling the main lettering and additional graph to it

In the graphs of the main inscription and additional graphs to it (the number of the graph is listed in brackets) lead:

a) in column 1 - the designation of the document, including the project section, the main kit of working drawings, product drawing, textual document, etc.;

b) in column 2 - the name of the enterprise, the housing and civil complex or another construction object, which includes a building (structure), or the name of the neighborhood;

c) in the column 3- the name of the building (structures) and, if necessary, the type of construction (reconstruction, expansion, technical re-equipment, overhaul);

d) in column 4 - the name of images placed on this sheet, in exact accordance with the name in the drawing.

Names of specifications and other tables, as well as text indications related to images, do not indicate in the column;

e) in column 5 - the name of the product and / or the name of the document;

e) in column 6 - symbol Design Stages:

1) P - for project documentation, including the approved part of the working draft;

2) P - for working documentation;

g) in column 7 - the sequence number of the sheet or the page of a text document during duplex printing. On documents consisting of one sheet, the graph is not filled;

and) in column 8 - the total number of sheets of the document. The graph is filled only on the first sheet.

On the first sheet of a text document, during duplex printing, the total number of pages indicate;

k) in column 9 - the name or distinctive index of the organization that has developed a document;

l) in column 10 - the nature of the work performed (developed, checked, normocontrol).

Depending on the design stage, the complexity and significance of the document, free lines are allowed to fill out at the discretion of the organization's management (specify the posts of persons responsible for developing a document (drawing);

m) in graphs 11-13 - surnames and signatures of the persons listed in column 10 and the date of signing.

Signs of others officials and matching signatures are placed on the field to cover sheet;

h) in columns 14-19 - Count Count Counts, which are filled in accordance with clause 7.5.19;

n) in column 20 - the original number of the original;

p) in column 21 - the signature of the person who accepted the script for storage, and the acceptance date (number, month, year);

c) in column 22 - the inventory number of the original document, in return to which the original was issued;

t) in column 23 - the designation of the material of the part (the graph is filled only in the drawings of the parts);

y) in column 24 - a mass of the product shown in the drawing, in kilograms without specifying a unit of measurement. The mass of the product in other units of measurement is given with an indication of the unit of measurement.

Example - 2,4 t;

f) in column 25 - scale (they are affixed in accordance with GOST 2.302);

w) In column 26 - the signature of the person who copied the drawing (if necessary).

Appendix E.

(mandatory)

Location of the main inscription, additional graph to it

and dimensional frames on sheets

Note - Dimensions in brackets are listed for the framework of typical project documentation.

Appendix J.

(Mandatory)

Shape 7 - FROMpsychification

Form 8 - G.ruPP Specification

Instructions for completing the specification and group specification

In specifications indicate:

a) in the column "pos." - positions (brands) of structural elements, installations;

b) in the graph "Designation" - the designation of the main documents to the elements of structures, equipment and products or standards (technical conditions) on them recorded in the specification (technical conditions) on them;

c) in the column "name" - the name of the elements of structures, equipment and products and their brand. It is allowed to group the same elements indicate the name once and emphasized;

d) in the column "count." Form 7 - the number of items. In the column "Count ..." forms 8 Instead of dots, write "according to the scheme", "on the floor", etc., and below - the ordinal numbers of the location or floors;

e) in the column "Mass, units" - a mass in kilograms. It is allowed to give a mass in tons, but indicating a unit of measurement;

e) in the "Note" graph, for example, for example, a mass measurement unit.

Appendix I.

(mandatory)

Form 9 - Permission to make changes

Instructions to fill the permission to make changes

In the resolution graphs indicate:

a) In column 1 - the designation of the permission consisting of the order number of permission on the registration book of permissions according to GOST 21.203 and through the Last Digital Defisc.

Example - 15-97;

b) in column 2 - the designation of the document in which the change makes;

c) in column 3 - the name of the enterprise under construction, buildings (structures);

d) in column 4 - another serial number assigned to changes that contribute to a document in one permission. It is indicated for the whole document, regardless of how many sheets it is completed. The ordinal numbers of the changes are denoted by Arabic figures;

e) in column 5 - numbers of sheets of a document that make changes;

e) in column 6 - the content of the change in the form of a text description and / or graphic image;

g) in column 7 - the cause code of change in accordance with the table

and) in column 8 - additional information;

k) in graphs of 9-11 - the names of persons signing permission, their signatures and the date of signing;

l) in column 12 - the name of the project organization and division (department), which resolved;

m) in columns 13-16 - the name of the relevant units or organizations, positions and the names of persons with whom in the prescribed manner agree on permission, their signatures and the date of signing, as well as the signature of the normocontroller;

h) In column 17 - the sequence number of the resolution sheet. If the resolution consists of one sheet, the graph is not filled;

p) In column 18 - the total number of resolution sheets.

Form 10 - Table registration table

Guidelines for completing the Change Registration Table

In the graphs of the Change registration table indicate:

a) in graphs "change", "number dock", "sub." and "date" - similar to the fill in the corresponding graph of the change table;

b) In the graphs "of sheet numbers (pages) of modified, replaced, new, canceled" - numbers of sheets (pages), respectively, modified, replaced, added and canceled for this permission.

When replacing the entire document in the column "sheet numbers (pages), replaced" indicate "all";

c) in the column "all sheets (pages) to the dock." - The number of sheets (pages) in the document. The graph is filled in case of filling the graph "of sheet numbers (pages), new" and / or "numbers of sheets (pages), canceled".

Appendix L.

(mandatory)

Shape 11 - Cancellation stamp (replacement) of the script document

Instructions for filling the cancer (replacement) of the script sheet of the document

In the stamp indicate:

a) In line 1 - the sequence number of the next document change, according to which the sheet is canceled or replaced (for example, "out. 3"). When canceling a sheet, the word "replaced" in the stampe is burned;

b) in graphs 2-5 - the position, surname, signature of the person responsible for making changes and the date of signing.

Appendix M.

(mandatory)

Shape 12 - Binding stamp (first sheet)


Shape 13 - Binding stamp (subsequent sheets)

Instructions for filling binding stamps

When filling the binding stamps indicate:

a) in column 1 - a new designation of a given document;

b) in column 2 - the name of the organization that has been binding;

c) in column 3 - the name of the enterprise under construction, buildings or structures for which a binding is made;

d) in graphs 4-7 - posts and surnames of persons responsible for binding, as well as persons that made the normocontrol, their signatures and dates of signing;

e) in column 8 - an inventory number assigned to a tied document;

e) in column 9 - the number of sheets of a tied document;

g) in columns 10, 11 - signature of the person who has tied a storage document and the date of signing.

Appendix N.

(mandatory)

Form 14 - Cover

Note - The name of the management body indicates for state organizations.

Appendix P.

(mandatory)

Form 15 - Title page

Notes

1 The name of the management body indicates state organizations.

2 The field for signing the document is filled in accordance with the instructions in Section 9.

An example of a title page

Appendix R.

(mandatory)

Form 16 - The composition of the project

Instructions for filling the statement

In the statement indicate:

In the column "Tom number" - the number of the volume or its part;

In the graph "Designation" - the designation of the document indicated on the title page, and, if necessary, the name or distinctive index of the organization that issued a document;

In the column "Name" - the name of the document in exact accordance with the name specified on the title page;

In the column "Note" - additional information.

Keywords: working documentation, working drawings, general data on working drawings, composition, main kits, specifications, changes, binding, project documentation, graphic and text documents, title sheet, basic inscriptions, signatures.

1 area of \u200b\u200buse

3 General documentation requirements

4 General Requirements for the Acquitations of Documentation

4.1 Project documentation

4.2 Workers drawings

General data on working drawings

5 General Rules for the implementation of documentation

Coordination axes

Drawing, slopes, marks, inscriptions

Images (cuts, sections, types , Fragments)

Main inscriptions

6 Rules for performing specifications in the drawings

7 Rules for making changes to working documentation issued to the Customer

7.4 Permission to make changes

7.5 Amendments

8 Rules for binding working documentation

9 Rules for issuing discharged documentation

Application A brand of main sets of work drawings

Appendix B forms 1 and 2- Validity of general data on working drawings

Appendix in the list of ESCD standards subject to accountable when performing graphic and text documentation for construction

Appendix G The list of permissible cuts of words (Supplement to GOST 2.316)

Appendix D shape 3-6 - Main inscriptions and additional graphs for it

Appendix E Location of the main inscription, additional graph to it and dimensional frames on sheets

Appendix F forms 7 and 8- Specifications

Annex and form 9 - permission to make changes

Appendix to Form 10 - Change Change Table

Appendix L shape 11 - cancellation stamp (replacement) of the script of the document

Appendix M forms 12 and 13- binding stamps (first and subsequent sheets)

Appendix N Form 14 - Cover

Appendix P form 15 - Title leaf. An example of a title page

Appendix R Form 16 - Project Composition

GOST 21.101-97

Interstate standard

SYSTEM OF DESIGN DOCUMENTS FOR CONSTRUCTION

Basic Requirements for Design
And working documentation Interstate Scientific and Technical Commission
according to standardization and technical rationing
and certification in construction (MNTKS) Moscow

Preface

1 developed by the state-owned enterprise - the center of the methodology, rationing and standardization in the construction (GP century), the Russian state system was made by the Department of Development of Scientific and Technical Policy and Design and Exploration Works, the State Standardization of Russia 2 was adopted by the Interstate Scientific and Technical Commission for Standardization, Technical Registration and Certification in Construction ( MNTKS) On December 10, 1997, for the adoption of the standard voted:

Name of state

Organ Name government controlled Construction

Republic of Armenia Ministry of Urban Planning of the Republic of Armenia The Republic of Kazakhstan Construction Agency and Architectural and City Planning Control of the Ministry of Economy and Trade of the Republic of Kazakhstan Republic of Kyrgyzstan Minarhstroy Kyrgyz Republic the Russian Federation Gosstroy Russia The Republic of Tajikistan Gosstroy Republic Tajikistan
3 was put into effect from April 1, 1998 as the State Standard of the Russian Federation by the Resolution of the Gosstroita of Russia from 29.12.97 No. 18-75 4 instead of GOST 21.101-93
1 area of \u200b\u200buse. 2 2 Regulatory references. 2 3. General requirements for documentation. 2 4 General documentation recruitment requirements. 3 4.1 Project documentation. 3 4.2 Workers drawings. 3 General data on working drawings .. 4 5. General rules for performing documentation. 5 coordination axes. 5 Drawing, slopes, marks, inscriptions. 6 images (cuts, sections, species, fragments) 7 Main inscriptions. 9 6 Rules for performing specifications in the drawings. 9 7. Rules for making changes to working documentation issued to the Customer. 9 7.4. Permission to make changes. 10 7.5. Alteration. 10 8. Rules of binding of working documentation. 13 9 Rules for registration of discharged documentation. 14 Appendix A. The brands of the main sets of work drawings. 14 Appendix B. Forms 1-2 - Vedomosti of general data on working drawings .. 15 Appendix B. List of ECC standards subject to accountable when performing graphic and text documentation for construction. 16 Appendix G. List of permissible cuts of words (addition to GOST 2.316) 17 Appendix D. Form 3-6 - Basic inscriptions and additional graphs for it. 18 Appendix E. The location of the main inscription, additional graph to it and the dimensional framework on the sheets. 20 Appendix J. Form 7-8 - Specifications. 21 Appendix I. Form 9 - permission to make changes. 21 Appendix K. Form 10 - Change Change Table. 22 Appendix L. form 11 - cancellation stamp (replacement) of the script sheet of the document. 22 Appendix M. Forms 12-13 - binding stamps (first and subsequent sheets) 23 Appendix N. Form 14 - Cover. 23 Appendix P. Form 15 - Title list. An example of the design of the title leaf. 24 Appendix R. Form 16 - the composition of the project. 25.

Interstate standard

Date of introduction 1998-04-01

1 area of \u200b\u200buse

This standard establishes the basic requirements for project and working documentation for the construction of enterprises, buildings and structures of various purposes. The general rules for implementing graphic and text documentation established in Section 5 of this Standard are also applied to the reporting technical documentation on engineering surveys for construction.

2 Regulatory references

This standard uses references to the following standards: GOST 2.004-88 ECCD. General requirements for the implementation of design and technological documents on the printing and graphic devices for the output of EUM GOST 2.101-68 ECCD. Types of products GOST 2.102-68 ECCD. Types and completeness of design documents GOST 2.105-85 ECCD. General requirements for text documents GOST 2.108-68 ECCD. Specification GOST 2.109-73 ECCD. Basic requirements for Drawings GOST 2.113-75 ECCD. Group and Basic Design Documents GOST 2.114-95 ECCD. Technical conditions GOST 2.301-68 ECCD. Formats GOST 2.302-68 ECCD. The scale of GOST 2.303-68 ECCD. Lines GOST 2.304-81 ECCD. Fonts Drawing GOST 2.305-68 ECCD. Images are views, cuts, section GOST 2.306-68 ECCD. Designations Graphic materials and rules for their application in the drawings of GOST 2.307-68 ECCD. Drawing and limit deviations of GOST 2.308-79 ECCD. Note on the drawings of tolerances forms and location of Surfaces GOST 2.309-73 ECCD. Designation of rough surfaces GOST 2.310-68 ECCD. Application in drawings designations of coatings, thermal and other types of processing GOST 2.311-68 ECCD. Image of the thread of GOST 2.312-72 ECCD. Conditional images and designations of welded joints GOST 2.313-82 ECCD. Conditional images and notation of all-point compounds of GOST 2.314-68 ECCD. Indications in the drawings on the labeling and branding of products GOST 2.316-68 ECCD. Rules for applying in drawings of inscriptions, technical requirements and tables of GOST 2.317-69 ECCD. Axonometric projections of GOST 2.410-68 ECCD. Rules for performing drawings of metal structures GOST 2.501-88 ECCD. Accounting and storage rules GOST 21.110-95 SPDS. Specification of equipment, products of Materials GOST 21.113-88 SPDS. Designations of the accuracy characteristics of GOST 21.114-95 SPDS. Rules for performing sketch drawings of general species of non-type products GOST 21.203-78 SPDS. Rules for accounting and storage of original project documentation of GOST 21.501-93 SPDS. Rules for the implementation of architectural and construction work drawings.

3. General requirements for documentation

3.1 The composition and content of project documentation for the construction of enterprises, buildings and structures is established by the current construction norms and regulations. 3.2 The working documentation for the construction of a building and structure in the general case includes: a) workers drawings intended for the production of construction and installation work; b) working documentation for construction products according to GOST 21.501; c) sketch drawings of common types of non-type products according to GOST 21.114 *; * Perform if necessary. d) specifications of equipment, products and materials according to GOST 21.110; e) another accompanying documentation provided for by the relevant standards of the project documentation system for construction (SPDS); e) estimated documentation on established forms.

4 General Requirements for the Acquitations of Documentation

4.1 Project documentation

4.1.1 Project documentation for approval (stage-project, approved by part of the working draft), is equipped in Tom, as a rule, according to individual sections provided for by the construction regulations and regulations. Each volume is numbered by Arabic numbers. Example - Volume 1 - General Explanatory Note Volume 2 - general plan and transport If necessary, Tom is divided into parts. In this case, the volume is numbered by type: volume 1.1, volume 1.2. 4.1.2 Text and graphic materials included in the compelling, as a rule, in the following order: - Cover; - title page; - content; - Support project: - Explanatory note; - The main drawings provided for by construction standards and rules. The rules for designing the cover, the title list, the content and composition of the project are given in section 9. 4.1.3. Each text and graphical document included in the designation is assigned to indicate the title page and in the main inscriptions. The designation includes a basic designation installed on the system currently operating in the organization, and through the hyphen - brand and / or code section of the project. The brands of the project sections are made by analogy with the brands of the main sets of work drawings given in Appendix A. Examples 1 2345-PZ Section "General Explanatory Note" 2 2345-GT section "General Plan and Transport" 3 2345-12-AC Section "Architectural and Construction Solutions", where 2345 is the contract number (contract) or cipher of the construction object; 12 - Room of the building or facilities by the General Plan *; 2345-12 - basic designation; PZ - project section cipher; GT and AC - project sections stamps. 4.1.4 Text and graphic materials, as a rule, include on sheets folded according to A4 GOST 2.301. Each volume includes no more than 250 sheets of A4 format, 150 sheets of A3 format, 75 sheets of format A2 and 50 sheets of A1 format. 4.1.5 General requirements for the execution of graphic documentation are given in Section 5. Text documents are performed according to GOST 2.105, taking into account the requirements of section 5 of this standard.

4.2 Workers drawings

4.2.1. Working drawings intended for the production of construction and installation work are combined into kits (hereinafter - the main sets) by brands in accordance with Appendix A. 4.2.2. The main set of work drawings of any brand can be divided into several basic sets of the same brand (with the addition of the sequence number) in accordance with the process of organizing construction and installation work. Example - AC1; AC2; Kzh1; Kzh2. . 4.2.3. Each basic set of working drawings is assigned the designation, which includes the basic designation installed on the system being operating in the organization, and through a hyphen - the brand of the main kit. Example - 2345-12-AR, where 2345 is the contract number (contract) or cipher of the construction object; 12 - Room of the building or facilities by the General Plan *; 2345-12 - basic designation; Ar is the brand of the main set of work drawings. * For partitions of the project related to the construction object as a whole (general explanatory note, the master plan and transport, etc.), as well as for the working drawings of linear structures, the master plan, outdoor communications, this part of the basic designation is usually excluded. 4.2.4. The main sets of work drawings include general data on working drawings, as well as drawings and schemes provided for by the relevant SPDS standards.

General data on working drawings

4.2.5. In the first sheets of each main set of work drawings, there are general data on working drawings, including: a) the statement of the working drawings of the main kit in form 1; b) the statement of reference and accompanying documents in form 2; c) statement of the main sets of work drawings in form 2; d) the statement of specifications (if there is mainly a set of several location schemes), performed in form 1; e) the symbols not established by state standards and the meaning of which are not indicated on other sheets of the main set of work drawings; e) general guidelines; g) other data provided for by the relevant SPDS standards. Forms 1 and 2 with instructions on their completion are given in Appendix B. 4.2.6 The statement of the working drawings of the main kit contains a sequential list of sheets of the main kit. 4.2.7 The statement of reference and accompanying documents is partitions: a) reference documents; b) the accompanying documents. The "Reference Documents" section indicates the documents to which links are given in the working drawings, including: a) drawings of typical designs, products and nodes with the name and designation of the series and release numbers; b) Standards that include drawings intended for the manufacture of products, indicating their name and notation. Reference documents The project organization provides the customer only on a separate agreement. The "Acceived Documents" section includes documents developed in addition to working drawings of the main kit, including: - Working documentation for construction products; - sketch drawings of common types of non-type products *; - specification of equipment, products and materials; - local estimate; - other documentation provided for by the relevant SPDS standards. * Perform if necessary. The accompanying documents of the project organization issues the Customer simultaneously with the main set of work drawings. 4.2.8 The statement of the main sets of work drawings leads on sheets of general data of the main set of the leading brand **. ** The main set of work drawings as the leading brand appoints the general designer. In the presence of several main sets of working drawings of one brand, they constitute a statement of sets of this brand in form 2 of the application b, which is given on a sheet of common data from each of these sets. 4.2.9 In general guidelines, lead: a) the basis for the development of working documentation (task for design, approved project); b) the mark, adopted in the working drawings of the building or the construction conditionally for zero (as a rule, lead to architectural and construction drawings); c) recording on the results of the readability of patentability and patent purity for the first time applied or developed in the project technological processes, equipment, instruments, structures, products and materials, as well as numbers of copyright certificates and applications for which decisions are made to issue copyright certificates used in the working documentation of the invention; d) record that work drawings are designed in accordance with applicable rules, rules and standards; e) a list of types of work for which the acts of examination of hidden works should be compiled; (e) Information about who owns this intellectual property (if necessary); g) other necessary instructions. In general guidelines, it should not be repeated technical requirements placed on other sheets of the main set of work drawings, and give a description of the technical solutions adopted in the working drawings.

5. General Rules for the implementation of documentation

5.1. When performing project, working and other technical documentation, intended for the construction of enterprises, buildings and structures should be guided by the requirements of SPDS standards, as well as standards unified system Design documentation (ECCD). The list of ECC standards subject to accountable when executing graphical and text documentation for construction is given in Appendix B. Documentation intended for microfilming must comply with the requirements of the Reprography Standards System. 5.2. The drawings are performed at an optimal scale, taking into account their complexity and saturation of information. The scale in the drawings do not indicate, with the exception of product drawings and other cases provided for in the relevant SPDS standards. 5. 3 List of cuts of words allowed in major inscriptions, specifications, tables, drawings and specifications, compiled in addition to GOST 2.316 and is given in Appendix G.

Coordination axes

5.4 In the image of each building or structure, the coordination axes indicate and assign them an independent system of designations. Coordination axes are applied to the images of the building, facilities with thin barccotted lines with long strokes, denote by the Arabic figures and the capital letters of the Russian alphabet (with the exception of letters: E, s, th, o, x, c, h, щ, ъ, s, b) In the circles with a diameter of 6 - 12 mm. Skipping in digital and letter (except indicated) designations of coordination axes are not allowed. 5. 5 figures indicate the coordination axes on the side of the building and facilities with a large number of axes. If there is not enough alphabet letters to designate the coordination axes, the subsequent axes are denoted by two letters. Example - Aa; BB; BB. 5.6 The sequence of digital and letter designations of the coordination axes take the plan to right and bottom up (Figure 1 but) or as shown in Figures 1 b., in. 5.7 The designation of the coordination axes is usually applied on the left and lower parties of the plan of the building and construction. If the coordination axes of the opposite sides are discharged, the indication of the specified axes in the locations of discrepancies are additionally applied on top and / or right parties. 5.8 For individual elements located between the coordination axes of the main supporting structures, additional axes are applied and indicated in the form of a fraction: above the feature indicate the designation of the previous coordination axis; Under the line - an additional sequence number within the section between adjacent coordination axes in accordance with Figure 1 g.. It is allowed by the coordination axes of the half-timbered columns to assign digital and alphabetic designations to the continuation of the designations of the axes of the main columns without an additional number. Picture 1 5.9 The image of a repeated element affected by several coordination axes, coordination axes are denoted in accordance with Figure 2: "A" - with the number of coordination axes of no more than 3; "B" - "" "" More than 3; "B" - with all alphabetic and digital coordination axes. If necessary, the orientation of the coordination axis, to which the element is attached relative to the neighboring axis, indicate in accordance with Figure 2 g..

Picture 2 5.10 To designate the coordination axes of the residential building blocks, the index "C" is used. Example - 1C, 2C, AU, BS. On the plans of residential buildings arranged from block sections, the designations of the extreme coordination axes of block sections indicate without an index in accordance with Figure 3.

Picture 3

Drawing, slopes, marks, inscriptions

5.11 Dimensional line at its intersection with remote lines, loop lines or axial lines are limited by serifs in the form of thick main lines with a length of 2-4 mm, carried out with a slope to the right at an angle of 45 ° to the dimensional line by 1 - 3 mm. When applying the size of the diameter or radius inside the circle, as well as the angular size of the dimension line is limited by arrows. Arrows are also used when applying the sizes of radii and internal rounds. 5.12 Level marks (heights, depths) of structural elements, equipment, pipelines, air ducts, etc. From the reference level (conditional "zero" mark) designate a conditional sign in accordance with Figure 4 and indicate meters with three decimal signs separated from an integer number. comma. "Zero" mark taken, as a rule, for the surface of a building of a building or structure, located near the planning surface of the Earth, indicate without a sign; marks above zero - with the sign "+"; Below is zero - with the sign "-". On the types (facades), cuts and sections of the marks indicate remote lines or contour lines in accordance with Figure 5, on the plans - in a rectangle in accordance with Figure 6, except in cases specified in the relevant SPDS standards.

Picture 4 Figure 5 Figure 6 5. 13 On the plans, the direction of the decomposition of the planes indicates the arrow over which, if necessary, is affixed by the magnitude of the slope in percents in accordance with Figure 7 or as a ratio of height and length (for example, 1: 7). It is allowed, if necessary, the magnitude of the slope is indicated in the PROMILL, in the form of a decimal fraction with an accuracy of the third mark. In the drawings and schemes before the dimensional number that determines the magnitude of the slope, the sign "ð" is applied, the sharp angle of which should be directed towards the slope. The designation of the slope is applied directly above the line of the contour or on the shelf of the lifting line. 5.14 Remote inscriptions to multi-layer structures should be performed in accordance with Figure 8.

Figure 7 Figure 8 5.15 Position numbers (element marks) are applied on the shelves of lines-carrying lines conducted from images of component parts of the object, next to the image without a lifting line or within the contours of the samples of the object in accordance with Figure 9. With a small-scale line of the line Flunders finish without arrow and point.

Picture 9 5.16 The font size for referring to the coordination axes and positions (grades) should be one - two numbers more than the font size adopted for the dimensional numbers on the same drawing.

Images (cuts, sections, species, fragments)

5.17 Cuts of buildings or structures are denoted by Arabic numbers sequentially within the main set of work drawings. Independent numbering is allowed only for cuts of individual sections of the building, structures or installations, all the drawings of which are located on one sheet or sheet of sheets and if there are no references to cuts on these drawings located on other sheets of the main set of work drawings. Sections are allowed to designate the capital letters of the Russian alphabet. The direction of the view for a cut according to the plan of the building and facilities takes, as a rule, from the bottom up and right to left. 5.18 If separate parts of the form (facade), the plan, the cut require a more detailed image, then the remote elements are additionally performed - nodes and fragments. 5.19 When the node is image, the corresponding place is noted on the form (facade), plan, or a context with a closed solid thin line (usually a circle or oval) with a designation on the shelf of the lines of the sequence number of the Arabic node number in accordance with Figure 10.

Picture 10

Picture 11 If the node is placed on another sheet, then the number of the sheet is indicated under the shelf of the lifting line (Figure 10 but) or on the shelf of the lifting line next, in brackets, in accordance with Figure 10 b.. If necessary, reference to the node placed in another main set of work drawings, or on a typical node, indicate the designation and number of the sheet of the corresponding main set of work drawings in accordance with Figure 10 in Or a series of working drawings of typical nodes and a release number in accordance with Figure 10 g.. If necessary, a reference to the node in the section is performed in accordance with Figure 11. Above the image of the node indicate the circle of its sequence number in accordance with Figure 12 but or 12. b.. The node, which is a complete mirror reflection of another (main) execution, is assigned the same sequence number as the main execution, with the addition of the "H" index. 5.20 Fragments of plans, cuts, facades, as a rule, are marked with a figure bracket in accordance with Figure 13. Under the figure bracket, as well as the corresponding fragment, the name and sequence number of the fragment are applied. If the fragment is placed on another sheet, then give a link to this sheet. It is allowed to link to the fragment to place on the shelf of the lifting line.

Figure 12 Figure 13 5.21 images to the axis of symmetry of symmetric plans and facades of buildings and structures, arrangement of structural elements, plans for the location of technological, energy, sanitary and other equipment are not allowed. 5.22 If the image (for example, the plan) does not fit on the sheet of adopted format, then it is divided into several sections, placing them on separate sheets. In this case, on each sheet, where the image section is shown, the scheme of a whole image with the necessary coordination axes and the symptoms (shading) of the image section shown on this sheet according to Figure 14 are shown on this sheet.

Note - If the drawings of the images of the image are placed in different basic sets of work drawings, then above the sheet number indicates the designation of the corresponding main kit (according to 4.2.2). Picture 14 5.23 If the plans of the floors of a multi-storey building have small differences from each other, then the plan is fully implemented by one of the floors, for other floors, only those parts of the plan are performed to show the difference from the plan shown in full. Under the name of the partially depicted plan, record: "The rest, see the Plan (name of the fully depicted plan)." 5.24 In the names of the flood plans of the building and structures indicate the netting of the net or floor number, or the designation of the corresponding secular plane. Examples 1 Plan for OTM. 0,000 2 Plan 2 - 9 floors 3 Plan 3-3. When performing a part of the plan in the title indicate axes that limit this part of the plan. Example - Plan for OTM. 0,000 between axes 1 - 8 and a - d It is allowed in the title of the floor plan to indicate the purpose of the premises located on the floor. 5.25 In the names of the cuts of the building (structures), indicate the designation of the corresponding secular plane. Example - incision 1-1 5.26 In the names of the facades of the building and structures indicate the extreme axes, between which the facade is located. Example - Facade 1-12.

Main inscriptions

5.27 Each sheet of graphic and text document must have the main inscription and additional graphs for it. The forms of the main inscriptions and instructions for filling them are shown in Appendix D. 5.28 in the design and working documentation, the main inscription is issued: 1) on sheets of the main sets of work drawings and the main drawings of the project documentation - in form 3; b) on the first sheet of drawings of construction products - in form 4; c) on the first sheets of text documents and sketch drawings of common types of non-type products - in form 5; d) on the subsequent sheets of drawings of construction products and text documents and sketch drawings of common species - in form 6. It is allowed on the first sheet of the drawing of the construction product the main inscription in form 5. 5.29 in the reporting technical documentation on the results of engineering surveys the main inscription is issued: a) on sheets of graphic documents used in the design as a share - in form 3; b) on the first sheets of graphic and text documents - in form 5, on subsequent sheets - in form 6. 5.30 The location of the main inscription and additional graph to it, as well as the dimensional framework on the sheets, are given in Appendix E. 5.31 Main inscriptions, additional graphs Its and frames are performed by solid thick basic and solid thin lines according to GOST 2.303 in accordance with the application D. 5.32, graphic and text documents that are styled in the form of volume, album, release or in another publishing form are designated with a title list. The rules for performing the title list are given in section 9. 5.33 The title page is allowed not to perform and not block text working documents of a small volume. In this case, the first sheet of the document is drawn up by the main inscription in form 3, subsequent - in form 6.

6 Rules for performing specifications in the drawings

6.1. The layout of the elements of the collection structure, monolithic reinforced concrete structure, to the drawings of the installations (blocks) of technological, sanitary and other equipment are the specification in the form 7 of Appendix J. When performing the drawings by the group method, group specifications in form 8 of the application J. 6.2 are compiled. The specifications of the construction products are according to GOST 21.501.

7. Rules for making changes to working documentation issued to the Customer

7.1. By changing the working document previously issued to the Customer, there is any correction, an exception or addition of any data to it without changing the designation of this document. The designation of the document is allowed to change only when different documents are erroneously assigned the same designations or an error is made in the designation. 7.2. Changes contribute to the original document. Making changes to calculations is not allowed. 7.3. Copies of sheets (modified, additional and released instead of replaced sheets) of working documentation guide to organizations that were previously sent copies of documents, simultaneously with copies of the general data of the relevant basic set of work drawings specified in accordance with 7.5.

7.4. Permission to make changes

7.4.1. The change in the document is performed on the basis of the permission to make changes (hereinafter - permission) compiled in form 9 of the Annex I. Resolution approves the head of the document developer organization or on his instructions another official. 7.4.2. The basis for obtaining original documents for making changes is permit. 7.4.3. Changes to each document (for example, the main set of work drawings, the specification of equipment, products and materials) is made in a separate resolution. It is allowed to make one general permission to change, introduced simultaneously in several documents if the changes are interconnected or the same for all changeable documents.

7.5. Alteration

7.5.1. Changes to the original documents are crossed by overclocking or clearing (washing). At the same time take into account the physical state of the original. 7.5.2. After making changes, the letters, numbers, signs must be clear, thickness of the lines, the magnitude of the lumen, etc. Must be implemented according to the rules provided for by the relevant ECCD standards and Reprography standards system. 7.5.3. Changeable sizes, words, signs, inscriptions, etc. Excrying with solid thin lines and there are new data. 7.5.4. When the image is changed (parts of the image), it is reduced by a solid thin line forming a closed circuit, and crucifically crossed with solid thin lines. A new image of the changed area is performed on a free field of a sheet or on another sheet without turns. 7.5.5. The variable, annulled and additional sections of the image assign the designation consisting of the ordinal number of the next document change and through the point of the sequence number of the variable (canceled, additional) section of the image within this sheet. In this case, the new image of the changed area is assigned the designation of the changed image. If a new image of the changed area is placed on another sheet, the changes assigned to it is preserved and in the table of changes of this sheet do not take into account. 7.5.6. Near each change, including about a change corrected by the clearing (washing), outside the image are applied to the parallelogram the designation of the change in accordance with Figure 15.

Picture 15 From the parallelogram spend a solid thin line to the changed area. 7.5.7. Closely located from each other modified sizes, words, signs, inscriptions, etc. They will be reduced by a solid thin line forming a closed loop, without crossbringing in accordance with Figure 16. 7.5.8. If a new image of the modified area is placed on another sheet, then the replaced image also indicates the number of the sheet on which the new image is located in accordance with Figure 17. 7.5.9. Above the new image of the modified section is placed in the parallelogram, the designation of the change in the replaced image is placed, and at a parallelogram indicate: "In return crushed". If a new image of the modified area is placed on another sheet, then at a parallelogram indicate: "Instead of the listed on the sheet (the sheet number on which the image is located)" in accordance with Figure 18. 7.5.10. If a new image of the changed area is placed near the replaced, they are connected to the tuning lines with the designation of the change in accordance with Figure 19.

Figure 16 Figure 17

Picture 18

Picture 19 Above the optional image is placed in the parallelogram the designation of the change, and at the parallelogram indicate: "Supplement" in accordance with Figure 20.

Picture 20 7.5.11. When canceling the image (part of the image), the change indicates: "canceled". 7.5.12. If there is not enough space to make changes or a violation of the definition of the image when corrected is possible, then a new script is manufactured taking into account the changes made and retain its former designation. If one or several sheets of the script is replaced or add or add, then they retain the inventory number assigned to the script. When replacing all the script sheets, he is assigned a new inventory number. 7.5.13. When making changes to the sheets of the main set of work drawings in the statement of the working drawings of this kit on sheets of common data in the "Note" column, indicate: a) when making the first change - "change one". When submitting subsequent changes - additionally, the next number numbers, separating them from the previous point with a comma. Example - change. one; 2; 3. b) on the replaced sheets with the change number - "(deputy)". Example - change. 1 (deputy) c) on canceled sheets with the change number - "canceled". Example - change. 1 (canceled) d) on additional sheets with the change number - "(new)". Example - change. 1 (new) 7.5.14. If additional sheets include additional sheets in the main set of work drawings, then they are assigned the next ordinal numbers and recorded in the continuation of the statement of the working drawings of the corresponding main kit. With a lack of space in the statement of work drawings for recording additional sheets, the continuation of the statement is transferred to the first of the additional sheets. At the same time, at the end of the statement of the working drawings placed in "General Data", they make an entry: "For the continuation of the statement, see the sheet (sheet number)", and the title: "The statement of the work drawings of the main kit (continued) is placed on the additional sheet . The rooms and the names of the annulled sheets in the statement of the work drawings are burned. When changing the names of the sheets, appropriate changes in the Count "Name" are made. 7.5.15. With the change in the total number of documents on its first sheet, the main inscriptions make appropriate changes in the "Sheets" graph. 7.5.16. When performing additional and cancellation of previously executed accompanying documents, corrections contribute to the statement of reference and accompanying documents of the corresponding main set of work drawings. 7.5.17. When performing additional and cancellation of previously completed main sets of work drawings make corrections to the statement of the main sets of work drawings. 7.5.18. The changes made to the script indicate the table of changes placed in the main inscription. A table of change is allowed to put out the main inscription (above it or to the left of it) in the same form. 7.5.19. The change table indicates: a) in the column "change" - the sequence number of document change; b) in the column "count uch. " - the number of variable sections of the image on this sheet within the next change; c) in the column "Sheet" - on sheets released instead of replaced, "deputy.", on sheets added again, - "New". When replacing all the sheets of the script (with the next order number of the document change) on the first sheet in the "Sheet" column indicate "all". At the same time, the table of changes on other sheets of this script is not filled. In other cases, the column "Sheet" put a fiber; d) in the column "no doc." - permit designation; e) in the column "Sub." - the signature of the person responsible for the correctness of the changes (the signature of the person responsible for the normocontrol is put on the field to cover sheet); e) in the "Date" column - the date of change. 7.5. 20. The Change table does not take into account the corrections made in the statement of the general data sheet in connection with the introduction of changes in the sheets of the main kit and the accompanying documents. 5.5.21. When making changes to text documents, it is recommended to perform a table registration table in form 10 of Annex K. The change table of registration is placed on the title page of a text document. 7.5.22. Significant changes in text documents make one of the following ways: a) replacing all or individual sheets of the document; b) the release of new additional sheets. If you change the original text documents, it is allowed when adding a new sheet to assign the number of the previous sheet with the addition of another Arabic digit, separating it from the previous point. Example - 3.1 In this case, on the first sheet, the total number of sheets change. In text documents containing mainly solid text, it is allowed when adding a new item to assign it the number of the previous point with the addition of the next lower case letter of the Russian alphabet, and when the item is canceled - to save subsequent points numbers. 7.5.23. When canceling or replacing the document, all annulled and replaced sheets of the original are crosswise crossed with solid thin lines and stamped the stamp in the form 11 of the application L.

8. Rules for binding working documentation

8.1. Working documentation - typical projects, typical design solutions (intended for binding) and working documentation of re-use are subject to reference to a specific construction site. On each sheet of the binding documentation, the binding stamp is set in accordance with the application M: a) on the first sheet - in form 12; b) on subsequent sheets - in form 13. 8.2. Covers and title sheets of basic sets of work drawings of typical projects (typical design solutions) published in the form of albums and issues are not attached and the customer is not sent. 8.3. The binding stamp is applied on a free leaf field, preferably above the main inscription or to the left of it. 8.4. It is allowed not to apply a binding stamp to immutable working drawings of structures, products and nodes if they are repeatedly applied by the organization that has implemented the development and approval of these drawings. Specified work drawings are recorded in the section of the attached documents without changing the designation. 8.5. Changes in binding are made in accordance with 7.5.1 - 7.5.4, 7.5.14 - 7.5.17 and taking into account the following additional requirements: a) if the variable sections of the image are two or more, then they are assigned ordinal numbers that are affixed by Roman numbers on Shelf lines-carrying in accordance with Figure 21; b) above the modified area indicate the Roman number of the sequence number of the variable image site and the inscription "instead of crossed" in accordance with Figure 22.

Picture 21 Picture 22 If a new image (part of the image) is placed on another sheet, then the replaced image also indicates the number of the leaf on which the new image is located. 8.6. The main inscriptions on sheets of the binding documentation published in the form of albums and issues are left unchanged. 8.7. Changes in binding It is recommended to enter into one instance of the document, which is in the further script, from which copies are manufactured. 8.8. Canceled sheets exclude from the bound documentation without changing the overall numbering of sheets.

9 Rules for issuing discharged documentation

9.1 Each discharged document is drawn up with a cover in form 14 given in Appendix N. The cover does not number and do not include in the total number of pages. 9.2 The first sheet of textual (graphic) document or several shutdown documents is the title page. The title page is performed in form 15 of the application P. Example of filling the title leaf is given there. 9.3 All sheets of a discrepanied document, starting with the title, must have through page numbering. At the same time, the title page does not name. Page number on sheets of text and graphics documents is indicated in the upper right corner of the sheet of the sheet. In addition, in the main inscription of text and graphics documents included in the album or release and having an independent designation, indicate the sequid numbering of sheets within the document with one designation. 9.4 When recruiting several documents in the form of volume, album or release after the title leaf, "content", which is performed in form 2 of Appendix B. The first sheet "content" is drawn up the main inscription in the form 5 of the annex D, subsequent - in form 6 of the application D. "Content" assign the designation consisting of the designation of the document and the cipher "C". Example - 2345-gt.s, 2345-11-kzh.Is, 2345-11TX.NS 9.5 Title sheets of design documents are made by signatures: Head or Chief Engineer Organization; chief engineer (architect) project. Title sheets of working documents are issued by the signature of the responsible person - the chief engineer (architect) of the project. The title list of reporting survey documentation is issued with the additional requirements of the relevant construction standards and rules. 9.6 The composition of the project, according to 4.1.2, lead in the statement performed in the form 16 of the application R. in the statement leads a consistent list of the volume of project documentation. The first sheet of statement is drawn up by the main inscription in form 5 of the annex D, subsequent - in form 6 of the application D. Vedomosti assign the designation consisting of the basic designation of the document and through the defisis - cipher "SP". Example - 2345-joint

Appendix A.

Brands of the main sets of work drawings

Table A.1.

Name of the main set of work drawings

Note

Production technology
Technological communications When combining all technological communications
General Plan and Transport Construction When combining work drawings of the master plan and transportation structures
General plan
Architectural solutions
Interiors. Workers drawings can be combined with the main set of the Arm or AC
Constructs are reinforced concrete
Wooden designs
Architectural and construction solutions When combining workers' drawings of architectural solutions and building structures
Metal designs detail
Water pipe and sewage
Heating, ventilation and air conditioning
Teplomechanical solutions of boiler rooms
Air supply
Dustovation
Fooling
Gas supply (internal devices)
Power equipment
Electric lighting (internal)
Communication systems
Radio communication, broadcasting and television
Firefighting
Fire alarm
Security and Security and Fire Alarm
Hydraulic solutions
Automation ... Multiple replace the name and brand of the corresponding main set of work drawings
Automation complex When combining workers' drawings of various technological processes and engineering systems
Anticorrosive protection of buildings, structures
Thermal insulation of equipment and pipelines
Railways
Car roads
Construction facilities When combining workers' drawings of automotive, iron and other roads
Outdoor network of water supply and sewage When combining workers' drawings of external water supply and sewage networks
Heat mechanical solutions of thermal networks
Outdoor gas pipelines
Outdoor electric light
Power supply
Note - If necessary, additional stamps of the main sets of work drawings can be appointed. At the same time, capital letters (no more than three) of the Russian alphabet, corresponding to the marks, as a rule, apply for stamps, appropriate, as a rule, the initial letters of the names of the main set of work drawings.

Appendix B.

(mandatory)

Vedomosti shared data on working drawings

Form 1 - Certificate of work drawings of the main kit

Statement of specifications

Note by filling vedomosti workers drawings basic set

In the statement of working drawings, the main set indicates: a) in the column "Sheet" - the sequence number of the sheet of the main set of work drawings; b) in the "Name" column - the name of images placed on a sheet, in exact accordance with the names given in the main inscription of the sheet; c) in the "Note" column - additional information, for example, changes made in the working drawings of the main kit.

Note by filling vedomosti specifications

In the statement of specifications indicate: a) in the "Sheet" column - the number of the main set of the work drawings on which the specification is placed; b) in the "Name" column - the name of the specification in full compliance with its name specified in the drawing; c) in the "Note" column - additional information, incl. About changes made in specification. Form 2 - statement of the main sets of work drawings.

The statement of reference and accompanying documents

Note by filling vedomosti basic sets workers drawings

In the statement of the main sets of work drawings indicate: a) in the "Designation" column - the designation of the main set of working drawings and, if necessary, the name or distincting index of the organization that issued the document; b) in the column "Name" - the name of the main set of work drawings; c) in the "Note" column - additional information, incl. About changes in the main sets of work drawings.

Note by filling vedomosti references and exceived documents

In the statement of reference and accompanying documents, it is indicated: a) in the "Designation" column - the designation of the document and, if necessary, the name or distinctive index of the organization that issued a document; b) in the "Name" column - the name of the document in exact accordance with the name specified on the title page or in the main inscription; c) in the "Note" column - additional information, incl. On changes made to recorded documents included in the working documentation.

Appendix B.

(mandatory)

List of ESCD standards subject to accountable when performing graphic and text documentation for construction

Table B.1.

Designation and name of the standard

Conditions for applying Standard

GOST 2.004-88 ECCD. General requirements for the implementation of design and technological documents on the printing and graphic devices of the Output
GOST 2.101-68 ECCD. Types of products
GOST 2.102-68 ECCD. Types and completeness of design documents Taking into account the requirements of GOST 21.501, belonging to the performance of the drawings of construction products
GOST 2.105-95 ECCD. General requirements for text documents Taking into account the requirements of sections 4, 5 and 9 of this standard
GOST 2.108-68 ECCD. Specification Taking into account the requirements of Section 6 of this Standard and GOST 21.501
GOST 2.109-73 ECCD. Basic requirements for drawings Taking into account the requirements of GOST 21.501. References to GOST 2.108, as well as 1.1.11, 1.1.12, 1.3 GOST 2.108 do not take into account
GOST 2.113-75 ECCD. Group and Basic Design Documents Taking into account the requirements of GOST 21.501
GOST 2.114-95 ECCD. Technical conditions Taking into account the requirements 5.27, 5.28, 5.30 - 5.32 of Section 5 and Section 9 of this Standard. 3.7.1 and 3.8 GOST 2.114 do not take into account
GOST 2.301-68 ECCD. Formats Taking into account the requirements of the relevant SPDS standards
GOST 2.302-68 ECCD. Scale
GOST 2.303-68 ECCD. Lines »
GOST 2.304-81 ECCD. Drawing fonts
GOST 2.305-68 ECCD. Images - species, cuts, sections Taking into account the requirements 5.17 - 5.26 of this standard
GOST 2.306-68 ECCD. Designations Graphic materials and rules for their application in drawings Taking into account the requirements of GOST 31.302, Tables 4 and 5
GOST 2.307-68 ECCD. Differences and limit deviations Taking into account the requirements 5.11 - 5.13 of this Standard
GOST 2.308-79 ECCD. Note on drawings tolerances forms and location of surfaces Taking into account the requirements of GOST 21.113
GOST 2.309-73 ECCD. Roughness designation surfaces
GOST 2.310-68 ECCD. Application in drawings of designations of coatings, thermal and other types of processing
GOST 2.311-68 ECCD. Image of thread
GOST 2.312-72 ECCD. Conditional images and designations of welded joints
GOST 2.313-82 ECCD. Conditional images and notation of all-point connections
GOST 2.314-68 ECCD. Indications in drawings on marking and branding products
GOST 2.315-68 ESKD. Images simplified and conditioner fasteners
GOST 2.316-68 ECCD. Rules for applying in drawings of inscriptions, technical requirements and tables Taking into account the requirements 5.14 - 5.16 of this standard
GOST 2.317-69 ECCD. Axonometric projections
GOST 2.410-68 ECCD. Rules for performing drawings of metal structures
GOST 2.501-88 ECCD. Rules for accounting and storage In the form of the inventory book, subscriber card and instructions for folding copies of drawings
Note - The conditions for the application of ECC standards of the classification group 7 are defined by the relevant SPDS standards

Appendix G.

(mandatory)

List of permissible cuts of words (Supplement to GOST 2.316)

Full name

Abbreviation

Highway hell.
Album Alb. (C)
Antisaismic seam A.S.S. (and)
Architect Arch. (*)
Asphalt concrete asf. Beth.
Concrete, concrete Beth.
Leading Vedas (*)
Ventilation camera Ventscamera
Release Vol. (C)
Chief Engineer GL Ing. (*)
Chief Engineer (Architect) of the Project GUI (HAP) (*)
Chief Specialist GL specialist. (*)
Group c. (T, *)
Expansion joint D.SH. (and)
Diameter Diam.
Director Dir. (*)
Document dock. (T. *)
Permissible tolerance
unit of measurement Units. change (t)
Capacity EMK. (C, T)
Railway J.D.
Reinforced concrete, reinforced concrete J.B.
Head Head (*)
Insulation, isolation Isol.
Institute IN-T (*)
Design Const.
Coefficient Coeff.
Efficiency kpd.
Staircase, stairs Forest.
Workshop (in design institutes) Mast. (*)
Scale M (c)
Materials Mat-lies
Mounting Mont.
Norm. Narr.
Equipment Equipment
Common Society.
Mark Options (C)
Checked Prov. (*)
Section section. (C)
The size sole. (C)
Calculate Narr.
Sanitary-technical San. tehn
Toilet San. knot
Made Sat
Sector sec. (C)
Well SC. (C)
Snow snow.
Temperature seam TOS (and)
Technological tehnol.
Technician Tehn (*)
Typical a type.
Trumpet Tr.
Rail head level ur. G. R. (and)
Ground level ur. s. (and)
Pure floor level ur. h. p. (and)
Plot Uch. (and, c)
Foundation Found.
Cement, cement Cem.
Cement concrete Cem. Beth.
Part C. (C)
Step sh. (C, T)
Thing PC. (t)
Plaster Stucat.
Crushed stone, rubble shout
Electric El.
Element EL-T (and. T)
Floor fl. (C)
Note - Abbreviations marked with a sign (*) apply only in the main inscription; (T) - in the tables; (C) - with numbers or ciphers; (and) - in graphic images

Appendix D.

(mandatory)

Basic inscriptions and additional graphs for it

Form 3 - for sheets:

major sets of work drawings; major drawings of project documentation sections; Graphic Documents on Engineering Exquisites

Form 4 - For drawings of construction products (first sheet)

Form 5 - For all types of text documents

Note - The main inscription in form 5 is allowed to use for graphic documents on engineering surveys not used as a share form 6 - For drawings of building products and all types of text documents (subsequent sheets)

Note by filling main inscription and additional graph to her

In the edges of the main inscription and additional graphs to it (the number of the graph is listed in brackets) lead: a) in column 1 - the designation of the document, including the project section, the main set of work drawings, drawing of the product, text document, etc.; b) in column 2 - the name of the enterprise, the housing and civil complex or another construction object, which includes a building (structure), or the name of the neighborhood; c) in column 3 - the name of the building (structures) and, if necessary, the type of construction (reconstruction, expansion, technical re-equipment, overhaul); d) in column 4 - the name of images placed on this sheet, in exact accordance with their name in the drawing. Names of specifications and other tables, as well as text indications related to images, do not indicate in the column; e) in column 5 - the name of the product and / or the name of the document; e) in column 6 - the conditional designation of the design stage: 1) P - for project documentation, including the approved part of the working draft; 2) P - for working documentation; g) in column 7 - the sequence number of the sheet or the page of a text document during duplex printing. On documents consisting of one sheet, the graph is not filled; and) in column 8 - the total number of sheets of the document. The graph is filled only on the first sheet. On the first sheet of a text document, during duplex printing, the total number of pages indicate; k) in column 9 - the name or distinctive index of the organization that has developed a document; l) in column 10 - the nature of the work (developed, checked, normocontrol). Depending on the design stage, the complexity and significance of the document, free lines are allowed to fill out at the discretion of the management of the organization (indicate the posts of persons responsible for developing a document (drawing); M) in graphs 11 - 13 - surnames and signatures of the persons listed in column 10 and Signing date. Signatures of other officials and matching signatures are placed on the field to cover sheet; H) in graphs 14 - 19 - Count graphs of changes that are filled in accordance with 7.5.19; n) in column 20 - the original number of the original; p) in column 21 - the signature of the person who accepted the script for storage, and the acceptance date (number, month, year); c) in column 22 - the inventory number of the original document, in return for which a new script was released; T) in column 23 - the designation of the material of the part (the graph is filled only in the drawings of the parts); y) in column 24 - a mass of the product shown in the drawing, in kilograms without specifying a unit of measurement. The mass of the product in other units of measurement is given with an indication of the unit of measurement. Example - 2.4 tons; f) in column 25 - scale (they are affixed in accordance with GOST 2.302); W) In column 26 - the signature of the person who copied the drawing (if necessary).

Appendix E.

(mandatory)

Location of the main inscription, additional graph to it and the size frames on sheets

Note - Dimensions in brackets are listed for the framework of typical project documentation.

Appendix J.

(mandatory)

Form 7 - Specification

Form 8 - Group Specification

Note by filling specifications and group specifications

Specifications indicate: a) in the column "Pos." - positions (brands) of structural elements, installations; b) in the graph "Designation" - the designation of the main documents on the elements of structures, equipment and products or standards (technical conditions) on them recorded in the specification (technical conditions) on them; c) in the column "Name" - the name of the elements of structures, equipment and products and their brand. It is allowed to group the same elements indicate the name once and emphasized; d) in the column "count" Form 7 - the number of items. In the column "Cole ..." forms 8 - instead of dots, write "according to the scheme", "on the floor", etc., and below are the ordinal numbers of the location or floors; e) in the column "Mass, units, kg" - a lot of kilograms. It is allowed to give a mass in tons, but indicating a unit of measurement; e) In the "Note" graph, for example, for example, a mass measurement unit.

Appendix I.

(mandatory)

Form 9 - p arising for making changes

Note by filling permissions on the making amendments

The resolution graphs indicate: a) in column 1 - the designation of the permission consisting of the sequence number of permission on the book of registration of permissions according to GOST 21.203 and through the Defisc of the last two digits of the year. Example - 15-97; b) in column 2 - the designation of the document in which the change makes; c) in column 3 - the name of the enterprise under construction, buildings (structures); d) in column 4 - another serial number assigned to changes that contribute to a document in one permission. It is indicated for the whole document, regardless of how many sheets it is completed. The ordinal numbers of the changes are denoted by Arabic figures; e) in column 5 - numbers of sheets of a document that make changes; e) in column 6 - the content of the change in the form of a text description and / or graphic image; g) in column 7 - the cause code of change in accordance with the table; and) in column 8 - additional information; k) in graphs 9 - 11 - the names of persons signing permission, their signatures and dates of signing; l) in column 12 - the name of the project organization and division (department), which resolved; m) in columns 13 - 16 - the name of the relevant units or organizations, positions and the names of persons with whom in the prescribed manner coordinate permission, their signatures and the date of signing, as well as the signature of the normocontroller; H) In column 17 - the sequence number of the resolution sheet. If the resolution consists of one sheet, the graph is not filled; P) In column 18 - the total number of resolution sheets.

Appendix K.

Form 10 - Change Change Table

Note by filling tables registration amendments

In the graph of the registration table of change indicate: a) in the graphs "Izm.", "Dock number", "Sub." and "date" - similar to the fill in the corresponding graph of the change table; b) In the graphs "of sheet numbers (pages) of modified, replaced, new, canceled" numbers of sheets (pages), respectively, modified, replaced, added and canceled for this permission. When replacing the entire document in the column "sheet numbers (pages), replaced" indicate "All"; c) in the column "Total sheets (pages) to the dock." - The number of sheets (pages) in the document. The graph is filled in the case of filling the Count "sheet numbers (pages), new" and / or "sheet numbers (pages), annulled".

Appendix L.

(mandatory)

Shape 11 - cancellation stamp (replacement) of the script sheet

Note by filling stamp cancellation (replace) original document In the stamp indicate: a) in line 1 - the sequence number of the next document change, according to which the sheet is canceled or replaced (for example, "CF. 3"). When canceling a sheet, the word "replaced" in the stampe is burned; b) in graphs 2 - 5 - position, surname, signature of the person responsible for making changes and the date of signing.

Appendix M.

(mandatory)

Form 12 - binding stamp (first sheet)

Shape 13 - binding stamp (subsequent sheets)

Note by filling stamps binding

When filling in the binding stamps indicate: a) in column 1 - a new designation of a given document; b) in column 2 - the name of the organization that has been binding; c) in column 3 - the name of the enterprise under construction, buildings or structures for which a binding is made; d) in graphs 4 - 7 - posts and surnames of persons responsible for binding, as well as persons that made the normocontrol, their signatures and dates of signing; e) in column 8 - an inventory number assigned to a tied document; e) in column 9 - the number of sheets of a tied document; g) in columns 10, 11 - signature of the person who has tied a storage document and the date of signing.

Appendix N.

(mandatory)

Form 14 - Cover

Note - The name of the management authority indicates state organizations.

Appendix P.

(mandatory)

Form 15 - Title List

Notes 1 The name of the management body indicates state organizations. 2 The field for signing the document is filled in accordance with the instructions in Section 9.

An example of a title page

Appendix R.

(mandatory)

Form 16 - project composition

Note by filling vedomosti

In the statement indicate: - in the column "Tom number" - the number of the volume or its part; - in the graph "Designation" - the designation of the document indicated on the title page, and, if necessary, the name or distinctive index of the organization that issued a document; - in the column "Name" - the name of the document in exact accordance with the name specified on the title page; - In the column "Note" - additional information. Keywords: working documentation, work drawings, general data on working drawings, composition, main kits, specifications, making changes, binding, project documentation, graphic and text documents, title sheet, basic inscriptions, signatures

Each project must have its own self-denotation. I have to work with many project organizations. Sometimes, it seems that some do not understand how to designate project documentation.

The designation of the project documentation consists of two parts: the basic designation and the brand of the drawing kit is indicated through the hyphen.

Xxxx-yy-zz

XXXX - designation of the project organization;

Yy- the number of the building or structure for the general plan;

ZZ - brand of the main set of drawings.

For example, 2014-1-EM1, 2014-1-EM2, 2014-2-EP.

The designations of the sketch drawings are added via the title letter "H".

Example: xxxx-yy-zz.n

Text documents included in the statement of the accompanying documents must have the designation with the addition of the corresponding capital letters through the point:

CO - for equipment specification;

Lo - for a questionnaire;

LS - for local estimates;

VM - for the statement of the need for materials;

BP - for the statement of assembly and construction work.

Example: 2014-1-Em.11

I want to notice, we have (where I worked and work) is accepted by the specifications to assign the letter "C", and the questionnaire sheets is "ol".

As you can see, the number of the general designer agreement is added here (as well as contractual, if any) and year.

1 Electrical work documentation. General requirements and recommendations on the composition and design. (Instead of the WGN 381-85). Moscow 1993.

2 Instructions for design documentation.

3 GOST R 21.1101-2009. System of design documents for construction. Basic requirements for project and working documentation.

And what rules of the designation of the PSD are you?

Commercial Accounting Electrical Energy Commercial accounting of electrical energy (power) is the process of measuring the amount of electrical energy for the purposes of mutual settlements for the electrical energy and power, as well as for the services related to the specified supply services;

GOST 21.101-97 Basic requirements for project and working documentation

Date of introduction 1998-04-01

7 Rules for making changes to working documentation issued to the Customer

7.1 Changing the working document previously issued to the Customer is any correction, exception or adding any data to it without changing the designation of this document. The designation of the document is allowed to change only when different documents are erroneously assigned the same designations or an error is made in the designation.

7.2 Changes contribute to the original document. Making changes to calculations is not allowed.

7.3 Copies of sheets (modified, additional and released instead of replaced sheets) of working documentation guide to organizations that were previously sent copies of documents, simultaneously with copies of the general data of the relevant basic set of work drawings refined in accordance with 7.5.

7.4 Permission to make changes

The permission approves the head of the organization - a document developer or on his instructions another official.

7.4.2 The basis for obtaining original documents for making changes to the changes is permission.

7.4.3 Changes to each document (for example, the main set of workers drawings, the specification of equipment, products and materials) is made in a separate resolution.

It is allowed to make one general permission to change, introduced simultaneously in several documents if the changes are interconnected or the same for all changeable documents.

7.5 Amendments

7.5.1 Changes to the original documents are made by overclocking or clearing (washing). At the same time take into account the physical state of the original.

7.5.2 After making changes, letters, numbers, signs must be clear, thickness of lines, the magnitude of the lumen, etc. Must be implemented according to the rules provided for by the relevant ECCD standards and Reprography standards system.

7.5.3 Changeable sizes, words, signs, inscriptions, etc. Excrying with solid thin lines and there are new data.

7.5.4 When the image is changed (part of the image), it is reduced by a solid thin line forming a closed loop, and crucifically crossed with solid thin lines.

A new image of the changed area is performed on a free field of a sheet or on another sheet without turns.

7.5.5 A variable, canceled and additional sections of the image assign the designation consisting of the sequence number of the next document change and through the point of the sequence number of the variable (canceled, additional) section of the image within this sheet. In this case, the new image of the changed area is assigned the designation of the changed image.

If a new image of the changed area is placed on another sheet, the changes assigned to it is preserved and in the table of changes of this sheet do not take into account.

7.5.6 Near each change, including about a change corrected by the clearing (washed), outside the image is applied to the parallelogram the designation of the change in accordance with Figure 15.

Figure 15.

From the parallelogram spend a solid thin line to the changed area.

7.5.7 Closely located from each other. Modified sizes, words, signs, inscriptions, etc. They will be reduced with a solid thin line forming a closed loop, without crossbinding in accordance with Figure 16.

Figure 16.

7.5.8 If a new image of the modified area is placed on another sheet, then the replaced image also indicates the number of the sheet on which the new image is located in accordance with Figure 17.

Figure 17.

7.5.9 Over the new image of the changed area is placed in the parallelogram, the designation of the change in the replaced image is placed, and at a parallelogram indicate: "In return crushed."

If a new image of the modified area is placed on another sheet, then at a parallelogram indicate: "In addition to the listed on the sheet (the sheet number on which the image is replaced)" in accordance with Figure 18.

Figure 18.

7.5.10 If a new image of the modified area is placed near the replaced, they are connected by liners with the notation of the change in accordance with Figure 19.

Figure 19.

Over the optional image is placed in the parallelogram the designation of the change, and at the parallelogram indicate: "Supplement" in accordance with Figure 20.

Figure 20.

7.5.11 When canceling an image (part of the image), the change indicates: "canceled".

7.5.12 If there is not enough space for making changes or a violation of the definition of the image when corrected is possible, then a new script is manufactured taking into account the changes made and retain its former designation.

If one or several sheets of the script is replaced or add or add, then they retain the inventory number assigned to the script.

When replacing all the script sheets, he is assigned a new inventory number.

7.5.13 When making changes to the sheets of the main set of work drawings in the statement of the working drawings of this kit on the sheets of common data in the "Note" column indicate:

a) when making the first change - "Change. 1".

When submitting subsequent changes - additionally, the next number numbers, separating them from the previous point with a comma.

An example is changed. one; 2; 3.

b) on the replaced sheets under the change number - "(deputy.)."

An example is changed. 1 (deputy)

c) on canceled sheets with the change number - "canceled".

An example is changed. 1 (canceled)

d) on additional sheets in the change number - "(new)"

An example is changed. 1 (new)

7.5.14 If the main set of work drawings include additional sheets, then they are assigned the next ordinal numbers and recorded in the continuation of the statement of the work drawings of the corresponding main kit.

With a lack of space in the statement of work drawings for recording additional sheets, the continuation of the statement is transferred to the first of the additional sheets. At the same time, at the end of the statement of work drawings placed in "General Data", record:

"For a continuation of the statement, see the sheet (sheet number)", and above the statement on the additional sheet, the title is placed: "The statement of the work drawings of the main kit (continued)."

The rooms and the names of the annulled sheets in the statement of the work drawings are burned.

When changing the names of sheets, appropriate changes in the Count "Name" are made.

7.5.15 With the change in the total number of sheets of the document on its first sheet in the main inscription, appropriate changes in the "Sheets" column are made.

7.5.16 When performing additional and cancellation of previously executed accompanying documents, corrections make corrections to the statement of reference and accompanying documents of the corresponding major set of work drawings.

7.5.17 When performing additional and cancellation of previously completed main sets of work drawings, corrections contribute to the statement of the main sets of work drawings.

7.5.18 Changes made to the script indicate a change table placed in the main inscription.

A table of change is allowed to put out the main inscription (above it or to the left of it) in the same form.

7.5.19 In the Change Table indicate:

a) in the column "Izm." - the sequence number of document change;

b) in the column "count. uch." - the number of variable sections of the image on this sheet within the next change;

c) in the column "Sheet" - on sheets released instead of replaced, - "deputy.", on sheets added again, - "New".

When replacing all the sheets of the script (with the next order number of the document change) on the first sheet in the column "sheet" indicate "all". At the same time, the table of changes on other sheets of this script is not filled.

In other cases, the column "Sheet" is puffed;

d) in the column "no doc." - permit designation;

e) in the column "sub." - the signature of the person responsible for the correctness of the changes (the signature of the person responsible for the normocontrol is put on the field to cover sheet);

e) in the "Date" column - the date of change.

7.5.20 The change table does not take into account the corrections made in the master data sheet in connection with the introduction of changes in the sheets of the main kit and the accompanying documents.

7.5.21 When you make changes to text documents, it is recommended to perform a table of registration of changes in software. The registration table is placed on the title page of a text document.

7.5.22 Significant changes in text documents make one of the following ways:

a) replacing all or individual sheets of the document;

b) the release of new additional sheets.

When text documents are changed, it is allowed when adding a new sheet to assign the number of the previous sheet with the addition of another Arabic digit, separating it from the previous point.

Example - 3.1.

In this case, on the first sheet, the total number of sheets change.

In text documents containing mainly solid text, it is allowed when adding a new item to assign it the number of the previous point with the addition of the next lower case letter of the Russian alphabet, and when the item is canceled - to save subsequent points numbers.

7.5.23 When canceling or replacing the document, all canceled and replaced sheets of the original are cross-shaped with solid thin lines and stamped stamp.


2021.