11.03.2020

Warm house up to 300 thousand. How to build a house for a limited budget (60 photos). Choice of budget lining at home


Early spring 2006, I came to work in Moscow. As the other who needed, starting with removable housing. By 2008, the prices and condition of this housing, as well as the "services" of the realtors, I have already been pretty fed. I began to look for an alternative.

I will not tire the reader with a description of all the options and factors considered and calculated by me, but by the fall of 2008, the idea was formed in final form:
- buy the cheapest garage, close to work and comfortable for living place,
- design and build housing (the project will depend on the specific conditions of the construction site),
- costs should be minimal (as it is unreasonable to make major investments in the experimental project) and phased (as it is unreasonable to spend the whole budget once),
- The planned budget of the project is about 300 thousand rubles. Yes, this is exactly what is approximately the annual rental cost of housing in Moscow.

With the choice of construction site everything is simple. I looked through all the ads for the sale of garages, chose the cheapest options, inspected them (immediately with an eye on the possibility of restructuring in housing), was exploration and survey of aborigines (for other interesting options, the nature of the environment, the possibilities of connecting electricity, density of demolition and etc.)
As a result, on September 27, 2008, a metal garage was chosen and bought for only 45,000 rubles from the subway, in the prestigious district of the capital, 9 km away. From work and just 10 km. From the Kremlin.

The construction was carried out on the weekend, on its own (1 human). Excellent workout after a week office work at a computer! So the pros of the project can be attributed and savings on visiting the gym. In the active phase of construction, the phrase was relevant for me: "Oh-oh, finally Monday !!!"

We disassemble (and in some places it is just smoldering) the old garage. The released metal gently we store nearby - it is still useful for us.
1

Back view.
2

We calculate the construction site for the new structure ...
3

... and align the soil.
4

Bring kamaz sand ...
5

... and align the sandy pillow under the project mark.
6

Oh, I already describe the course of construction, but I forgot to familiarize the curious reader with the project. So what am I built here?
And I am building nor a few, a two-storey modular cottage, with completely autonomous life support systems. Two-storey - understandable. Modular - consisting of modules that can be quickly and easily removed. After all, I didn't know all the risks of the project at that time, so I chose to have a spare option in case, say, demolishing garages, problems with the environment, etc. There would be problems - immersed the modules with a crane in two trucks and move to another site.

Fully autonomous life support systems - means complete freedom from all centralized communications and "bindings" to a certain place that uses only its own and imported resources and, therefore, no one must.

My project was flawless, including legally: the site is highlighted as a member of the garage cooperative (which is documented), I will install on it, without a foundation, the soil, two modules, which are essentially steel cubes (this is the permitted site use). I have documents on cubes and their contents. No laws relating to real estate or housing can be distributed on these cubes (since they simply are neither the other).

Thus, the question of the legality of living in the garage I answer - no laws are violated, no one in the garage lives, and no one has the right, in no way limit the owner of the iron cube, in his right to be inside this cube or store different items and liquids in it . With the exception of directly prohibited by law - type of weapons, drugs, explosives, etc.

That is, the full autonomy of life support systems is also a factor of the legality of placing such a structure at a platform not equipped with water supply or sewage system. However, for 5 years, no one has presented to me any complaints, did not ask any questions, did not check the legality of my residence. But nevertheless I was ready for any surprises. Probably, the reader already guessed that with such a serious approach to the case and thoroughly thinking of all the details, the project was doomed to success? Yes, right. But a little later.

In the meantime, the future successful Muscovite poses after a difficult day of work on throwing sand shovel and aligning it in terms of level, against the background of the future of luxury and comfort. Take a picture asked by passing pedestrian. The face hid - why do I need more popularity?
7

On the lean sand, we put metal sheets from the roof of the dismantled garage. The result is an ideal horizontal platform with solid (steel!) Coated. You can install the first module.
8

In addition to the detailed photo report, I have a detailed financial report and timing. How else? Investment project - Do not fuck dog! Accurate assessment of his economic indicators.
Thus, the reader, very soon you will get an accurate and comprehensive answer to the question "How to build a house in Moscow for 300 thousand rubles?", Worried by "Muscovites, spoiled by the apartment issue", at least since the time of the creative heyday of the author's quoted phrase.

Here are the chronology and costs at the time of the site's readiness (I apologize for the destruction of formatting when transferring data from Excel):
09/27/2008 Purchase of a garage 45 000
Entry fee in GSK, payment for 2008 2 000
04.10.2008 Flashlight, batteries 97
04.10.2008 Ax 156.
05.10.2008 Shotkaya shovel 160
11.10.2008 scrap, shovel Sovk, boots, mittens, plumbing lace, bucket. 900.
10/23/2008 RSC profiles. 3 m. 3 pcs. 420.
Waterpas 1.5 m. 550
Scissors for metal 300
Top 200
25.10.2008 Castle hinged 78
Career sand 8 m3 6 000

Brought and mounted the first module.
9

But it is a standard 20-foot container, 6x2,5x2.5 meters, hermetic, with a hermetic door, able to withstand multiple weight from above and multiple storm.
10

Beauty. We do inside cleaning, fill on the floor cardboard ...
11

... now there is where to fold the tool, building materials, workwear! There is where to change clothes, hide from the rain or relax. My own premises in Moscow! Hooray! Hooray! Hooray!

10.26.2008 20-foot container. 38,000
Loading-unloading, transportation of container 9 600

11/01/2008 Water canister 10 liters. 3 pieces 270.
Water canister 20 liters 159
Mop 61.
Towel terry 2 pieces 34
Latex gloves 2 pairs 32
Rubber gloves 32.
Respirator U-2K 22
Garbage bags 60
Broom 49.
Folding chair 300.
02.11.2008 Transportation of marble 50
Payment of garbage removal 200
03.11.2008 Zincovka 2 m2 thick. 0.45 mm. 400.
Bolts 15 pcs. 100
Drawing on wood 200

Total costs for 1 module - 49 669 rub.
12

We are taking off the galvanized gap between the neighboring and my garage, lay out marble (found on the landfill, koi near the territory there is plenty) the platform before the gate. At the place of the future of the main entrance - while the steel panel from the old garage supported by Rusty Barrel.
13

Collect the back wall using the details of the old garage. By the way, I am ready to access the backyard - the gate at the gate from the old garage is quite functional. And the former gates themselves are now just part of the wall.
14

Top view on the outbreak territory. Now my construction site has a size of 7 x 3.5 meters.
15

We carry the second module.
16

Installed. With a console protrusion from the facade - and an increase in the square, and canopy over the gate.
17

Back view.
18

This is the top module from the inside.
19

20

So, the second module is a factory build BK-00 block container, external dimensions: 2,45m width, length 5.85m, height 2.45, carrying frame - welded metal, frame - wooden, roof - flat welded from sheet 0, 8mm, outdoor skin - professional flooring galvanized C10-40-1150, interior decoration - plastic panels, boardwalk, window with grille, door.
We install it on the pads, dried out of the board, the junction of the module modules.
21

Expenses:
11/15/2008 Boards 25 320
Nails 180.
Castle hinged 147.
11/23/2008 WATTE JACKET 277
11/29/2008 Block container residential 68,500
11/30/2008 Foam assembly Winter 2 cylinder 220
06.12.2008 Zininkovka 3,125 m2 thick. 0.5 mm. 650.
Self-tapping screws 800 gr. 120.
12/07/2008 Transportation, installation of a block container 9,500
Transportation of container on GSK 100

Total costs for 2 module - 80 014 rub.

General budget Construction to 12/07/2008 amounted to 186 thousand rubles. Normally, it seems in the planned budget to meet!

By the way, as a Council: Never buy ready-made block containers. The quality of their manufacture and especially - insulation - full zvizdets! I had to remove the trim and almost reinstate the heat and wind-insulation. To the crookedly laid, places, 5-cm. Foam, added 5-cm. ISOVER 11 layer. As a result, the overall thickness of the insulation has become 100 mm and all the slots were eliminated. It turned out the "Arctic" modification of the block container!
In general, it was necessary to buy only a frame with an outdoor skin, independently inspire, the floor should be to wave and make the walls of the walls and the ceiling of the drywall and go to the wallpaper. For the price, in the end, it would have happened almost the same, but in quality - incomparably better.

So, the core of the structure is ready, the fate of the project depends now only on the creation of reliable and autonomous livelihood systems.
The question with the heating system decided unexpectedly simply - there are European bourgeois for a long time, and on an industrial scale, they produce an ideal solution to the problem of autonomous heating of small buildings - gas convector. Who is interested in technical details - google yourself, but I will say honestly - they shook me!

This convector + propane cylinder \u003d reliable, stable, comfortable heat in any shed, for the singer of penny. Piezorozhig, thermostat, protection against burner routing. Air fence and emissions of combustion products - outside, on a coaxial tube, which is also a heat exchanger that heels the air of the air of the exhaust gases (+ 10% to the efficiency). The combustion chamber is completely isolated from the room, therefore, even in the worst (almost incredible) case, the gas will not penetrate the room, but will come out along the tube and dispel.
Applauding Bourgeois engineers and manufacturers, and buy this miracle engineering thought for 10,000 rubles.
Isn't it beautiful?
22

We establish, strictly following the instructions and showing your own ingenuity and smelting. By the way, as it turned out, sowing (even plastic!) The wall of the galvanized was unnecessary. This apparatus does not heat the wall at which it hangs. I put a leaf of galvanized under him, misappropried the word "convector" in his name.

Note: Wikipedia kindly informs us that "convector is a heating device in which heat from the coolant or heating element is transferred to the heated room with convection. Natural convection at which warm air, already heated with contact with the coolant or heating element, rises upstairs, and its place occupies the colder air of the room, is intensified by the convector design. " I get up and once again applauding Bourgeois engineers!
23

And finally long this moment! Rotate the pen, clicking the Piezorozal button - in the viewing window we observe how the blue light flashed over the burner.
24

Here began to heat the heat exchanger (black case with an observation window). Here it is already burning hot. I install a beautiful white housing in place - through its holes, the stream of warm air begins to flow. After about half an hour, it becomes hot in the fuchka and I'm stripping. Even after half an hour, the room temperature reaches a room.
25

Windproof grille at the end of the convector coaxial tube (coaxial means the exhaust pipe is located in the center of the air intake pipe).
26

On the street - minus 10. The heating system is fully ready and has passed the test. I don't have to change clothes on the frost to the wrong, frozen overalls.

December 27, 2008. Soon the New Year. I learn to the Christmas holidays to the homeland, I will continue my Moscow Construction after returning. All with the coming! Good luck in 2009!
27

January 2009. Linoleum laying. I establish (flood) furniture
29

30

Pumping furniture. Build a bed. Judging by the size of the bed, I am an optimist and confident that Muscovites will appreciate the comfort of my house and my own advantages and will be frequent guests (at least) or cohabitants (ideally). As they say: "On the merge of men can be judged by the number of condoms taken by him. Even if this date is the first. "
31

Heating works, bed is available. I carry out a test night. Lonely. In the steel box, in the middle of a strange, deserted territory forced by diverse garages. Fine. During the night, the house warmed well, in the morning - warm, cozy.
Breakfast cookies, drinking with a bottle with water. I want hot tea - it is necessary to urgently get a kitchen stove. But it's not a problem. On the agenda, the most critical issue of the project is autonomous water supply and sewage, workable shower and sink. If it is not possible to solve this issue - this is not a residential cottage, but only heated shed.

The question with the sink, I solve simply - I use proven time, the "rustic" system. It should be noted that I was born and grew up in the village, so I do not feel cultural shock, at the sight of a school. The advantages of the haymaker are its simplicity and superconductivity in water consumption. In the end, I used the first 17 years of your life only by the Hoodyman, millions of Russian villagers and summer residents still enjoy them, and no one complains.

With the shower question more complicated. I am an office worker - daily shower, shave and a clean shirt are required for me.
I know that a person with a short haircut is enough to wash 10 liters of warm water. In order to lean in a qualitatively so much water, it is necessary that her thin striking flows from above and could be promptly adjusted and overlap. A compact shower cabin with a warm water reservoir from above and a crane is evaporated.

Cumulative electric heater under the ceiling? Not an option - you can not count on uninterrupted power supply, low ceiling and high shower pallet leave no space for the water heater, moreover, it is necessary to ensure the possibility of a simple drain of water from the system. To be able to completely turn off the heating in winter, for the periods of my long absence.

I choose a simpler, ultrasound and non-volatile option: Water is heated to the desired temperature in a 15-liter enamel tank on the gas tile (15-20 minutes ready time), then fed to a compact expenditure tank over the shower cabinet, from where Self is spent as needed. Ended - an additional portion of the tank is rumored.

So, a week per person will need 60-70 liters of tap water and about 10 liters of drinking (I breakfast and I dine at work, evenings only tea. Well, on weekends, the soup). In a way, to ensure water supply, 1 time a week to me It is necessary to purchase 2 five-liter bottles of drinking water in Auchan (for 100 rubles) and 2 twentyliton canisters and 3 decider filled with tap water for free.

Garbage question - in the nearest mall I download the canisters in the trolley, fill it with water from any found water tap and kach the trolley to the car. I overload the canisters in the trunk, then I carry the canisters from the trunk to the house of 15 meters. A small physical activity is very useful to office plankton! And you can also refue to water at work, or from friends, but anywhere. One "But", the car becomes part of the water supply system (and gas supply - too), its loss for a long time is very critical - you will have to drive gas and water by taxi.

I buy a shower stall and starts to build it. Pallet and walls are collected.
32

Other components (sink, colorful, gas tile).
33

Lepim "From that" the expendable tank with a crane. Connect components with hoses.
34

The "heart" of the system is a country shower-toptun. His non-volatility and the highest technical and economic characteristics make it an undisputed leader among all other possible options pumps. To pump 10 liters of water - it is only 20 times (without distracting from washing) to massate the heels of elastic red "tits" (which for a man, you will agree, not at all difficult, but rather - nice :)
35

36

Racket, washing, gas tiles are ready. The hose hanging behind the wage is connected to the pump. It is necessary to lower its end in a tank with warm water, standing on the tile. And you can go to the shower.
37

38

You ask: "What about the washing?" I answer: "As long as there are laundries self-service, it is easier to go and stand up in rented herds than to build autonomous and driving water for it." 200 rubles worth 1 wash in a typewriter for 8 kg. Linen. I just bought 30 shirts and 30 pairs of socks and arranged washing only 1 time per month. 3 cars loaded at the same time. Total, the cost of washing was approximately 600 rubles per month.

A little watched TV, waiting for the ending of the washing. Wet wedged lingerie laid into packets and drove home. Having extended, fully opened the ventilation and added the temperature to the heater thermostat. A few hours later, the lingerie burned. Imagine the amount of evaporated moisture from such a lingerie and evaluate the reserve of the power of the heater and the domical ventiy system. In the photo - the approximately fifth of the usual washing volume sucks.
39

Sewage. Originally - in the canisters. From the haunted man: in winter - in a 10-liter, standing under the sink,
40

... in the summer - in the 30-liter shower canister, standing on the street. Why in winter it is not there? From the shower there is a one-time powerful reset of warm water and the pipe will not frozen - all water flows out of it earlier than the warm-up pipe will freeze.
The harassment room has a drain sludge - the pipes do not warm up and the water in them will be gradually wrapped up.

As I wrote above, draining the sewage into the canisters, allows me to declare the autonomy of the building and the absence of its influence on the surrounding territory. In the event of attempts to complaints to me, I could demonstrate twisting the sewer jam, loading them in the car and export for disposal, in an unknown direction. However, since the claims were not presented, and soap water does not relate to high-tech waste, problems with its disposal on the risen territory of the garage cooperative did not arise.

About a couple of times a week (and only in winter) you need to empty the washbasin canister. Once every 2 days (in summer) - a shower canister. In winter, instead of the canister put a plastic bucket and a kick on his bottom, in the nearest snowdrift, a decorator is postponed in the form of this bucket. In the spring melts.

Chitoplyamov, who wanted to act on the topic "Sung Moscow" recommend stroll through the territories of garages and admire the mains of the machinery, dumps canister from under him, spent filters, bottles, packages, corpses of homeless dogs (and their future followers, also not clean territory), etc. This is really a problem. And considering that garbage containers are arranged everywhere, its reason in banal laziness and pofigism of the aborigines.

I repeat once again, the design of my building provides for the removal and disposal of waste. Of course, haha, I exported liquid waste and passed them to recycling into a specialized company. If necessary, I will even present confirmation documents. The legality and order are primarily!

So, the basic life support systems are ready (in addition to the described there is still a ventilation system and will later be air conditioning). I will not describe the toilet, since I do not see problems with his device. There are tens ready-made solutions - from the elementary plastic bottle and buckets, to the dry contents of different designs, forms and volumes.
After all, if you are, reader, you can not independently solve the problem of disposal of several hundred grams of your own excrement, the fact that, baby, are you doing on this site?)
41

Since the end of March 2009 I started permanent accommodation In his new accommodation, at the same time completing it. Everything is the same - exclusively on weekends. Internal situation in 2009
42

43

A thermometer with a remote sensor hung on the wall. At the top - the temperature inside, down - on the street.
44

In June 2009, he connected to electricity, the bobbed, passed ...
45

... and the construction was activated.
46

Rear facade increased from the remains of the old garage.
47

Bought an inverter welding machine and "Bulgarian". And work boiled.
48

It is attached to modules on screws - to save the ability to quickly disassemble and transport the building.
49

It was decided to train in the manufacture of steel doors with a spare outlet of the 2nd floor (on the roof of the neighbor). Given that I just learned the welding work on the Internet, for the first door, it is not bad. Only the kilogram of electrodes only, began to feel a little the essence of the arc electric welding - to understand the dependence of the current strength from the thickness of the welded metal, the position of the seam, etc. It seems that experience is important in welding - the longer and more boil, the better of the seam.
50

General view of the door of the spare exit.
51

Summer landscape from the back of the backyard - what is not a rustic idyll?
52

Training in welding is moving to the main facade.
53

Door of the main entrance from the inside ...
54

For the construction of a country house, most people choose budget projects of houses. It makes no sense to overpay for expensive building materials or order a project of a huge mansion if this housing will be used only sometimes. Good option For residents of Nizhny Novgorod, frame houses up to 300 thousand rubles turnkey can become. This is not a myth, but reality - one-storey houses Economy class won their popular due to cost and comfortable layout. Ready projects Housing for construction provide an extension in the form of a garage, attic or terrace.

Ready projects of houses up to 300 thousand rubles

It is the opinion that the construction of the house is an occupation requiring a huge amount money and time. But it is not so! The catalog contains several options for cheap country houses from sip-panels. Low price does not always mean the use of bad building materials or a small building area. Specialists of the company "Basco" try to make country accommodation is more affordable by optimizing the cost of production and logistics. You can independently build a house for 300 thousand rubles, taking advantage of the Ready Domocompute and project documentation. The home complex includes everything you need:

  • Sip-panel
  • Inter-storey overlap
  • Project with finished planning
  • Fittings, all the necessary fasteners

Options are possible with an attic, with a garage or a summer terrace. For three hundred thousand rubles you get full set Materials - You can collect a dual of your dreams in a matter of days! Need only land plot And the desire to conduct finishing works on their own.

Construction of houses up to 300 thousand rubles turnkey

Cheap country cottages can only cost 300 thousand rubles - they are well suited for summer living, and appearance Not at all inferior to modern mansions. How did it become possible? Thanks to the sip panels! This high-tech material is actively used in the construction of budget frame houses. It easily transfers a harsh Russian climate, resistant to external physical exposure and durable. Sales of frame houses up to 300 thousand rubles in Nizhny Novgorod and the Nizhny Novgorod region are engaged in the production company "Basco". There are more than a dozen different options in the catalog capable of satisfying the most attracted customers.

Construction is conducted as cash.

Plot. Burian, no fences. There is an iron garage and email. Pole on the border of the site. The plot itself cost 400 T.R. Bashkiria district, plot 2 km from the city.

Made a fence, bought flocks for 5 rubles. pcs, crossbars 30 rubles. Painted garage, paint (olifa + bomb aluminum) 300 rub.

Opened ribbon foundation, 120 height and 40 width. Kamaz PGS was purchased for 6.t. rubles. and about 10 bags of cement. From the moment of buying an account spent approximately 15 TRP.

They took a loan of 40 TRP. Bought 10 pallets of aerated concrete blocks, like 36 thousand, the remnants took glue and cement for mixing.

Masonry work began. While 55 T.Ru is spent.

Box ready. They laid out not completely (the back wall behind the scenes, it will be a frame, to possibly expand the house and bring it to the scheduled 9.5x9.5).

Bought a timber bar for 10trup.

Frame back wall.

He began to engage in electricity 10kW. Shield, 3-phase 2 tariff meter, grounding. I gathered completely myself, the electricians simply closed the siep to the post.

It cost 10t.рур. 75 T.Ru is spent yet.

Made waterproofing foundation. Families were adjusted by B.U. Door. Bought OSB tiles, 7 T.R.

Hired front loader for land. 2 Trap.

Flowed foundation.

Began to make a temporary roof. Brucks on 7.руб. and rubberoid 2 Trap. Mount to the crate for 5 TR. It is spent almost 100 rubles. about.

Nadybali wooden windows. To me around 22, Batte 53 years. Workers. I get 10, and the father is 14 Trap. I am an electrician, and he is a locksmith.

Winter began. Late in the fall did the well, bought 5 rings 1,200 rubles, the rest of the alkashi died half. Pipes for communications. Bought boards by 6,000 for the ceiling and concrete mixer for 8.

Cost 120 TRP.

Made a draft ceiling. Then plan plasterboard or stretching.

San. knot. Also in April, put water pipe and sewage. Bled concrete tie. Bought 2 pallets of bricks, 10 cement bags, forest sand. Began to make a bathroom.

It has been spent since the purchase of the site, 130 T.R.

The other day they spent well:

Shower cabin, for action 10.000
Toilet 3700.
Wash basin with pedestal 2000
Two lever mixers 800
Washing with legs of Ala "Village" for temporary kitchen 1500
EPS 7 sheets for 750 rubles
Polypropylene pipes 600 rubles
5 cement bags 850 p
Rolled soldering iron 200th is spent since the purchase of 158.000 rubles.

Civilization is slowly coming. Bought the accumulative water heater Pickelted Ariston for 9000. And the pumping station, it cost 3,800 rubles.

The most important thing.

General form.

Garden. In a vegetable garden, cabbage, potatoes, raspberries, currants, grapes, corn, beets, apple tree, torn, carrots, mint, onion, parsley, cherry and more. And now the expansion of the house. In the constructed part, it is quite comfortable.

Drew a sketch of future expansion.

The extension will be made using TIS technology.

Love cushions under the foundation. Made 2 meter formwork and flooded 4 kneading, the remains of cement. The beginning of the second part of the Nichebrod Inc construction site. Corp. Price We are waiting for ZP in July to cement. Also poured like septicism.

Tees and plot.

The window was set the other day, Pickelted. Filled 9 meters of foundation, there were still 9, but this year it will work. The windowsill 300 rubles, two foam cylinders for 200. Folgisolone roll 50 m square. 1300 rub. The other day KAMAZ clay will take for 2500. The Internet catches us normally, now the first season of Dexter downloaded.

I will write the list of purchases yet I have not forgotten:

PSB-15 PPCM PENPOLISTYROL - 51кв.m.
Epps 5cm - 21 tiles 10.500
Substrate for laminate 50 m. 800
5 cylinders of mounting foam 1300
Pistol for foam 500
Chinese metal door 3000
Electroconvector 2kW 2000
Saplot of apple and plum 1200 on the street +7, rain. Convector in the afternoon I put on 18 * at night 22 * \u200b\u200bbecause Two-tariff counter. I paid for the email it turned out 1100 rubles in two months.
On our street, a plot with a foundation for 900 TR is selling my economy already calmly pulls on 1.2 cartoon

As I wanted to: lay an EPPS, folgisolone, TP pipes, buy two batteries for 10 sections, electric boiler and later a wood boiler.

It turned out: the ceiling was insulated with folgicone and 10cm polystyrene foam, on the floor under the laminate) 1 convector, it will be necessary to take the second. I think so to overweight, here people in the SIP houses live with convectors. So it goes...

Bought: 12.000r Furnace wood heat carriage Top200
+250 Mounting foam
+200 mailbox costs approximate every month:
Gasoline 1000.
ELO, Internet, phones 1200
Credit (2 months left) 3000
Food and home goods: 5.000 approximately.
And 8-10 stays at a construction site every month. Norm.

The stove fries, on the street +1. Houses 20+ While burning pallets and a friend. waste.

This month I plan to take the hill and the electric chain saw Makita. I should also 10,000 on a credit card for EPPS and PPS.

The main start. You never know what you can do till you try. We have finished houses Bruce sell from 1 million (away from the city) with plots. In general, if the merchant sells such a house, it means it will Navar at least 500 k. Work is very expensive, so if you do everything yourself, it turns out very even available. I bought a washing machine for 10.000 and LCD TV BATT for 9.000 rubles. All like people. Total, since the beginning of construction, cash was spent in the amount of about 250,000 rubles. (Including machine and TV.) In February, I will probably connect IPTV and ADSL Internet. Meanwhile, there were gas on the street. If it turns out, in the fall, I will take a loan and head. Also in the spring promised water. Cadastral value The site is already 850 thousand rubles - a good investment, an increase of 200% average account for electricity 1100 rubles per month, at a price of 2.40 per kW during the day and 1.40 at night. In the whole winter, two Gazelles porn on firewood for 1500 rubles each were purchased. The temperature in the house holds 23 * C, despite the three-meter ceilings. Aerated concrete is perfectly holding heat. So it goes. Here.

You can evaluate future front work. Approximate plan until autumn:
Finish foundation
Build a second half using tees-2 technology
Make a new big roof
Register house
"Register"
Receive tax deduction
Connect gas, make gas heating.
Rather and find new job.
If suddenly get rich, make the foundation for the garage.
Stone fear.

Once again, it was abandoned from vacation, received compensation for unused vacation pays 12 thousand. Lol. Purchased:
KAMAZ PGS, 5000 rub
Submersible, vibration pump, + hose - 1600
12 cement bags, 3200 rubles
TOTAL: 10.000
At the moment, about 260 thousand is spent.
Today flooded the meter of the foundation.

Today we finished the main foundation, 2 bags of cement remained. Tomorrow will begin the f-she under the veranda.

In the layout of the extended house, you must fit 3 small bedrooms, entrance staircase and one bathroom.
"Height" should not be too big. 5 meters for example, it is clearly a lot. But at the same time, you need to find a balance that the useful area would be sufficient for rooms.
It will be a big plus, if you do not have to disassemble old rafters, giving them some way.

Chose the cheapest version of the TISE machine. The machine is 30 thousand stands, and the walls of tees will be in the same way.

6 rows were laid out, 14. Cement and PGS are slowly ended.

Fence and plot.

Approximately 260 thousand These are all invested money, as long as I do not know, in principle it does not matter, for myself it is done.

Who wants themselves to search for themselves to look for Avito and in local newspapers, you can of course through realtors, they sometimes take in bulk, then cut into pieces, but I do not want to feed the system important thing that the land is owned, the type of land IZh. And who has the opportunity, then come and look at the place, find out. Storge all year round and good electricity. This is enough.

I have the type of land IZH, the land in the property. (Authorization for construction does not need, project too) So, the report. A little horrified by credit card Bought another 25 cement bags, and 6 sand cubes for 5,000. The corners on the jumpers cost 1000 rubles. Now you can calculate how much approximately (there are 20 blocks left) the walls were: 2 Kama Kaza PGS was purchased, half the first batch went to the foundation, half of the second batch remained (leaves for the floors).

1 KAMAZ, (6cubes) clean 5000r
55 cement bags, delivery 13.500r
Masonry masonry 500r.
Ruberoid 300r
Total 20,000 rubles.

Excellent result!

Finished the walls. Repeated. Started plastering, and blot.
Mounting foam 500 rubles
Sawn on the roof, delivery 18.300 rubles:
Front-line boards 18x5x600 23pcs (rafters, uterus)
Brussia 10x5x600 7 pcs (uterus)
Edged boards, 2 grade 2x10x600 1CUB (Diselet)
And money remained only for food ...

Meanwhile, Sychevalny mutates.

On Saturday, they called relatives, disassembled part of the roof and put 3 rafters, the rest are planning to put on the next Saturday.
Costs: 500 rubles on the self-tapping screw and nails today was ordered professional flooring, 156kv.m, 10 meters of skates, 750 self-samples, 140 sq. Meters membrane on the Space for me, 42 thousand rubles. Paid by a credit card Sberbank. So it goes...

Bought a screwdriver Hammer A 1700 rubles.

Matching products: brackets, nails, screws 500 rubles.

According to the approximate counting currently, funds spent in the amount of 345.000 rubles. A lot of money.

Meanwhile, roofing began.

The other side did not have enough boards on the crates. Buying it is possible from an advance. We have 2 km or 20 minutes on foot. 10 minutes on the vele.
Bus runs.

We get to work as: get up at 6.20.

At 6.50 we are going on the car to the city (with our father the graphics coincide).

At 7.00, the working cattle truck is departed to the plant, at 7.45 the start of the shift.

Change ends at 16.20, at 16.50, cattle times will take into the city (15 minutes drive) sit down in the car and go home, at 17.30 already there. If you go by car immediately to work, then at 16.50 already at home, but it is expensive pleasure.

We have no project. Wiring in different ways. In the bathroom hidden, there are already all sockets on an ongoing basis. The remaining cables are still along the wall, in the future they will be packed in the corrugation and remain under the plasterboard. Ventilation will be sewn in a false plat.
Bought a seedling of Cherry "Besche" 500 rubles.

The roof was almost finished, it turned out that the skates lack. With tag tag so far.

Two advertising banners BU 3x6 on frontones 1000r Two foam cylinders and a new 1000r pistol 3 cement bag and paint 1000r Total: 3000 put old wooden windows and doors, manually displaced paint. Started the fill of the floors. Slowly Gasim's credit card debt, 24 thousand remained.

On the pouring of the floors, 7 bags of cement per 1800 rub.
+ paint and brush on the windows of the total 2000 rubles.

Today they bought 6 meters of pipe D114 to chimney. 2350 rub. Cheap galvanizing burned.

Tomorrow I will cook and stucked starting inside.

From birth, 22 years old lived in the apartment, now I will not drive back and stick there. Although if I sell the house, I will enjoy 3-à-new in a new building. Here is freedom, silence. More space for recreation, for example, you can buy a motorcycle or motorboat. Garden by hand. In the meantime, the roof was finished - they purchased the skates for 2000 rubles, cement at 600. Plastering the back wall. Also done, a lot of other small worm. Sheltered apple and plums in cases of strong frosts and so on.

Strike. The last word adequate to people: thanks to who supported, 2 years flew unnoticed.

All in your hands. The idea was to help people who want to deprive a housing issue with their own hands but were not solved. Strike. Do not feed the mortgage system.

Short sheet of construction solutions from 200k-sent:

Try to do everything with your own hands. It is not difficult, the benefit of the Internet. Margin for work in finished houses up to 300%. Choose the earth correctly - in the property, the type of land is preferably IZh. Road and electricity is the main thing. The rest will apply. Cheap foundation: tees, mzfl If you do not know from what material to build, choose concretes - classic. Baby gardens, hospitals, houses - mostly all concrete.

Solar is always outside (dew point) Read: Thermal Facade insulation technology.

Don't be keen modern solutions"From" advisers ". The foundations of 500 thousand rubles, and other beggars with the theoretical count make the price of the construction of space. Pay attention to the old houses.

Download:

Early in the spring of 2006 I came to work in Moscow. As the other who needed, starting with removable housing. By 2008, the prices and state of this housing, as well as the "services" of the realtors, I have already been pretty fed up. I began to look for an alternative.

I will not tire the reader with a description of all the options and factors considered and calculated by me, but by the fall of 2008 the idea was formed in final form:
- Buy the cheapest garage in the closest and comfortable place to stay,
- design and build accommodation (the project will depend on the specific conditions of the construction site),
- costs should be minimal (as it is unreasonable to make major investments in the experimental project) and phased (as it is unreasonable to spend the whole budget once),
- The planned budget of the project is about 300 thousand rubles. Yes, this is exactly what is approximately the annual rental cost of housing in Moscow.

(Just 55 photos)

The sponsor of the post: https://www.vorotasuper.ru: our masters first-class will install new barrier equipment and will help with the dismantling of the old one.
Source: kak-eto-sdelano.ru.

With the choice of construction site everything is simple. I looked through all the ads for the sale of garages, chose the cheapest options, examined them (immediately with an eye on the possibility of restructuring in housing), was exploration and survey of aborigines (for the availability of other interesting options, the nature of the environment, the possibilities of connecting to electricity, the prospects of demolition and etc.) As a result, on September 27, 2008, a metal garage was chosen and bought in just 45,000 rubles 10 minutes on foot from the subway, in the prestigious district of the capital, 9 km from work and just 10 km from the Kremlin.

The construction was carried out on the weekend, on its own (1 human). Excellent workout after a week office work at a computer! So the pros of the project can be attributed and savings on visiting the gym. In the active phase of construction, the phrase was relevant for me: "Oh-oh, finally Monday !!!"

1. We disassemble (and in some places it is just smoldering) the old garage. The released metal gentively we store nearby - it is still useful for us.

2. Rear view.

3. We remove the construction site for the new structure ...

4. ... and align the soil.

5. Tore Kamaz Sand ...

6. ... and align the sandy pillow under the project mark.

Oh, I already describe the course of construction, but I forgot to familiarize the curious reader with the project. So what am I built here?

And I am building, no more, a two-storey modular cottage with completely autonomous life support systems. Two-storey - understandable. Modular - consisting of modules that can be quickly and easily removed. After all, I didn't know all the risks of the project at that time, so I chose to have a spare option in case, say, demolishing garages, problems with the environment, etc. There would be problems - immersed the modules with a crane in two trucks and move to another site.

Fully autonomous life support systems - means complete freedom from all centralized communications and "bindings" to a certain place that uses only its own and imported resources and, therefore, no one must.

My project was flawless, including legally: the site is highlighted as a member of the garage cooperative (which is documented), I will install on it, without a foundation, the soil, two modules, which are essentially steel cubes (this is the permitted site use). I have documents on cubes and their contents. No laws relating to real estate or housing can be distributed on these cubes (since they simply are neither the other).

Thus, the question of the legality of living in the garage I answer - no laws are violated, no one in the garage lives, and no one has the right, in no way limit the owner of the iron cube in his right to be inside this cube or store different items and liquids into it. With the exception of directly prohibited by law - type of weapons, drugs, explosives, etc.

That is, the complete autonomy of life support systems is also a factor of the legality of placing such a facility on a platform, not equipped with water supply or sewage. However, for 5 years no one has presented me with any claims, did not ask any questions, did not check the legality of my residence. But nevertheless I was ready for any surprises. Probably, the reader already guessed that with such a serious approach to the case and thoroughly thinking of all parts the project was doomed to success? Yes, right. But a little later.

7. In the meantime, the future successful Muscovite poses after a difficult day of work on throwing sand with a shovel and aligning it in terms of the background of the future of luxury and comfort. Take a picture asked by passing pedestrian. The face hid - why do I need more popularity?

8. On lean sand, we put the sheets of metal from the roof of the dismantled garage. The result is an ideal horizontal platform with solid (steel!) Coated. You can install the first module.

In addition to the detailed photo report, I have a detailed financial report and timing. How else? Investment project - not horseradish dog! An accurate assessment of its economic indicators is necessary.

Thus, the reader, very soon you will get an accurate and comprehensive answer to the question "How to build a house in Moscow for 300 thousand rubles.", Concerned with "Muscovites, spoiled by the apartment issue", at least since the time of the creative heyday of the author of the quoted phrase.

Here are the chronology and costs at the time of the site's readiness (I apologize for the destruction of formatting when transferring data from Excel):
09/27/2008 Purchase of a garage 45 000
Entry fee in GSK, payment for 2008 2 000
04.10.2008 Flashlight, batteries 97
04.10.2008 Ax 156.
05.10.2008 Shotkaya shovel 160
11.10.2008 scrap, shovel Sovk., Boots, mittens, lace-plumb, bucket. 900.
10/23/2008 RSC profiles. 3 m 3 pcs. 420.
Waterpas 1.5 m 550
Scissors for metal 300
Top 200
25.10.2008 Castle hinged 78
Career sand 8 m3 6 000

9. Brought and mounted the first module.

10. And here it is a standard 20-foot container, 6x2,5x2.5 meters, hermetic, with a hermetic door, able to withstand multiple loads from above and multiparty storm.

11. Beauty. We do inside cleaning, fill on the floor cardboard ...

12. ... now there is where to fold the tool, building materials, workwear! There is where to change clothes, hide from the rain or relax. My own premises in Moscow! Hooray! Hooray! Hooray!

10.26.2008 20-foot container. 38,000
Loading-unloading, transportation of container 9 600
11/01/2008 Water canister 10 liters. 3 pieces 270.
Water canister 20 liters 159
Mop 61.
Towel terry 2 pieces 34
Latex gloves 2 pairs 32
Rubber gloves 32.
Respirator U-2K 22
Garbage bags 60
Broom 49.
Folding chair 300.
02.11.2008 Transportation of marble 50
Payment of garbage removal 200
03.11.2008 Zincovka 2 m2 thick. 0.45 mm. 400.
Bolts 15 pcs. 100
Drawing on wood 200

Total costs for 1 module - 49 669 rub.

13. We are taking off the galvanized gap between the neighboring and my garage, lay out marble (found in the landfill, which is located near the territory there is plenty) the platform before the gate. At the place of the future of the main entrance - while the steel panel from the old garage supported by Rusty Barrel.

14. We collect the rear wall using the details of the old garage. By the way, I am ready to access the backyard - the gate at the gate from the old garage is quite functional. And the former gates themselves are now just part of the wall.

15. Top view on the outbreak territory. Now my construction site has a size of 7 x 3.5 meters.

16. We carry the second module.

17. Installed. With a console protrusion from the facade - and an increase in the square, and canopy over the gate.

18. Rear view.

19. This is the top module from the inside.

20. So, the second module is a factory build BK-00 block container, external dimensions: width 2.45 m, length 5.85 m, height 2.45, carrier frame - welded metal, frame - wooden, roof - flat welded From the sheet of 0.8 mm, the outer covering is galvanized C10-40-1150, interior decoration - plastic panels, boardwalk, window with grille, door.

21. We set it on the gaskets, dried out of the board, the junction of the module modules.

Expenses:
11/15/2008 Boards 25 320
Nails 180.
Castle hinged 147.
11/23/2008 WATTE JACKE 277
11/29/2008 Block container residential 68,500
11/30/2008 Foam assembly Winter 2 cylinder 220
06.12.2008 Zininkovka 3,125 m2 thick. 0.5 mm. 650.
Self-tapping screws 800 gr. 120.
12/07/2008 Transportation, installation of a block container 9,500
Transportation of container on GSK 100

Total costs for 2 module - 80 014 rub.

The total budget of construction to December 7, 2008 amounted to 186 thousand rubles. Normally, it seems, in the planned budget to meet!

By the way, as a Council: Never buy ready-made block containers. The quality of their manufacture and especially - insulation - full zvizdets! I had to remove the trim and almost re-lay heat and wind insulation. To the crookedly laid, places, 5-cm foam added 5-cm layer Isover 11. As a result, the overall thickness of the insulation was 100 mm and all the slots were eliminated. It turned out the "Arctic" modification of the block container!

In general, it was necessary to buy only a frame with an outdoor skin, independently inspire, to tempt the floor and make the walls of the walls and the ceiling of the drywall and wake up the wallpaper. At the price, as a result, it would have happened almost the same, and in quality - incomparably better.

So, the core of the structure is ready, the fate of the project depends now only on the creation of reliable and autonomous livelihood systems. The issue with the heating system decided unexpectedly simply - it turns out that European bourgeois has long been and on an industrial scale produce an ideal solution to the problem of autonomous heating of small buildings - gas convector. Who is interested in technical details - google yourself, but I will say honestly - they shook me!

22. This convector + propane cylinder \u003d reliable, stable, comfortable warmth in any Sarader for the sowing penny. Piezorozhig, thermostat, protection against burner routing. Air fence and emissions of combustion products - outside, along a coaxial tube, which is also a heat exchanger that heels in the air of the heat of exhaust gases (+ 10% to the efficiency). The combustion chamber is completely isolated from the room, therefore, even in the worst (almost incredible) case, the gas will not penetrate the room, and it will be released outside and dispel.

Applauding Bourgeois engineers and manufacturers and buy this miracle engineering thought for 10,000 rubles. Isn't it beautiful?

23. We establish, strictly following the instructions and showing your own ingenuity and smelting. By the way, as it turned out, sowing (even plastic!) The wall of the galvanized was unnecessary. This apparatus does not heat the wall at which it hangs. I put a leaf of galvanized under him, misappropried the word "convector" in his name.

Note: Wikipedia kindly informs us that "convector is a heating device in which heat from the coolant or heating element is transmitted to the heated room with convection. Natural convection at which warm air, already heated with contact with the coolant or heating element, rises upstairs, and its place occupies the colder air of the room, is intensified by the convector design. " I get up and once again applauding Bourgeois engineers!

24. And finally, the long-awaited moment! Rotate the pen, clicking the Piezorozal button - in the viewing window we observe how the blue light flashed over the burner.

25. Here began to heat the heat exchanger (black case with an observation window). Here it is already burning hot. I install a beautiful white housing in place - through its holes, the stream of warm air begins to flow. After about half an hour, it becomes hot in the fufayka, and I undress. Even after half an hour, the room temperature reaches a room.

26. Windproof grille at the end of the convector coaxial tube (coaxial means the exhaust pipe is located in the center of the air intake pipe).

On the street - minus 10. The heating system is fully ready and has passed the test. I don't have to change clothes on the frost to the wrong, frozen overalls.

27. December 27, 2008. Soon New Year. I learn to the Christmas holidays to the homeland, I will continue my Moscow Construction after returning. All with the coming! Good luck in 2009!

31. Pumping furniture. Build a bed. Judging by the size of the bed, I am an optimist and confident that Muscovites will appreciate the comfort of my house and my own advantages and will be frequent guests (at least) or cohabitants (ideally). As it says: "On the self-talking of a man can be judged by the number of condoms taken by him. Even if this date is the first. "

Heating works, bed is available. I carry out a test night. Lonely. In the steel box in the middle of a strange, deserted territory forced by diverse garages. Fine. During the night, the house was well warmed, in the morning warm, cozy.

Breakfast cookies, drinking with a bottle with water. I want hot tea - it is necessary to urgently get a kitchen stove. But it's not a problem. On the agenda, the most critical issue of the project is autonomous water supply and sewage, workable shower and sink. If it is not possible to solve this issue - this is not a residential cottage, but only heated shed.

The question with the sink, I solve simply - I use proven time, the "rustic" system. It should be noted that I was born and grew up in the village, so I do not feel a cultural shock at the sight of a school. The advantages of the haymaker are its simplicity and superconductivity in water consumption. In the end, I used the first 17 years of our life only by the Hattle, Millions of Russian villagers and Dachnikov still enjoy them, and no one complains.

With the shower question more complicated. I am an office worker - daily shower, shave and a clean shirt for me are required. I know that a man with a short haircut for washing is enough 10 liters of warm water. In order to lean in a qualitatively so much water, it is necessary that its fine trickle flows from above and could be promptly adjusted and overlap. A compact shower cabin with a warm water reservoir from above and a crane is evaporated.

Cumulative electric heater under the ceiling? Not an option - you can not count on uninterrupted power supply, low ceiling and high shower pallet leave no space for the water heater, moreover, it is necessary to ensure the possibility of a simple drain of water from the system. To be able to completely turn off the heating in winter during the periods of my long absence.

I choose a simpler, ultrasound and non-volatile option: Water is heated to the desired temperature in a 15-liter enamel tank on the gas tile (15-20 minutes ready time), then fed to a compact expenditure tank over the shower cabinet, from where Self is spent as needed. Ended - an additional portion of the tank is rumored.

So, a week per person will take 60-70 liters of tap water and about 10 liters of drinking (breakfast and I dine at work, evenings only tea. Well, on weekends, the soup). Thus, to ensure the water supply 1 time a week, I will have to purchase 2 five-liter bottles of drinking water (for 100 rubles) and filled 2 twental political canisters for free and 3 decayl tilters for free.

Bullshit Question - In the nearest shopping center, I download the canisters in the trolley, fill it with water from any found water tap and kach the cart to the car. I overload the canisters in the trunk, then I carry the canisters from the trunk to the house of 15 meters. A small physical activity is very useful to office plankton! And you can also refue to water at work or friends, but anywhere. One "But" - the car becomes part of the water supply system (and gas supply - too), its loss for a long time is very critical - you have to drive gas and water by taxi.

32. I buy a shower room and starts it to assemble. Pallet and walls are collected.

33. Other components (sink, colorful, gas tile).

34. We sculpt "From what was" the expendable tank with a crane. Connect components with hoses.

35. "Heart" of the system is a country shower-toptun. Its non-volatility and the highest technical and economic characteristics make it an undisputed leader among all other possible pumps. To pump 10 liters of water - this is only 20 times (without distracting from washing) to massate the heels of elastic red "boobs" (for a man, you will agree, not at all difficult, but rather - nice

37. Watercraft, washing, gas tiles are ready. The hose hanging behind the Russian manual is connected to the pump. It is necessary to lower its end in a tank with warm water, standing on the tile. And you can go to the shower.

38. You ask: "What about the washing?" I answer: "As long as there are laundries self-service, it is easier to go and get into rented herds than to build autonomous and driving water." 200 rubles worth 1 wash in a typewriter for 8 kg of linen. I just bought 30 shirts and 30 pairs of socks and arranged washing only 1 time per month. 3 cars loaded at the same time. Total, the cost of washing was approximately 600 rubles. per month.

39. I watched a TV a little, waiting for the end of the washing. Wet wedged underwear laid into the packages and went home. Having extended, fully opened the ventilation and added the temperature to the heater thermostat. After a few hours, the underwear dried up. Imagine the amount of evaporated moisture from such a lingerie and evaluate the reserve of the power of the heater and the domical ventiy system. In the photo - the approximately fifth of the usual washing volume sucks.

40. Sewage. Originally - in the canisters. From the haunted man: in winter - in a 10-liter, standing under the sink,

... in the summer - in the 30-liter shower canister, standing on the street. Why in winter it is not there? From the soul there is a one-time powerful discharge of warm water, and the pipe will not frozen - all water flows from it earlier than the warmed pipe will freeze. The walk-in-lawyer drains sluggish - the pipes do not warm up, and the water in them will be gradually wrapped up.

As I wrote above, draining the sewage into the canisters allows me to declare the autonomy of the building and the absence of its influence on the surrounding territory. If attempts have attempted complaints about me, I could demonstrate the twisting of the sewer jams, the loading of them in the car and the export for disposal in an unknown direction. However, since the claims were not presented, and soap water does not relate to high-toxic waste, problems with its disposal in the risen territory of the garage cooperative did not arise.

About a couple of times a week (and only in winter) you need to empty the washbasin canister. Once every 2 days (in summer) - a shower canister. In winter, instead of the canister put a plastic bucket and a kick on his bottom, in the nearest snowdrift, a decorator is postponed in the form of this bucket. In the spring melts.

Chitoplyamov, who wanted to act on the topic "Sung Moscow" recommend stroll through the territories of garages and admire the mains of the machinery, dumps canister from under him, spent filters, bottles, packages, corpses of homeless dogs (and their future followers, also not clean territory), etc. This is really a problem. And considering that garbage containers are arranged everywhere, its reason in banal laziness and pofigism of the aborigines.

I repeat once again, the design of my building provides for the export and disposal of waste. Of course, haha, I exported liquid waste and passed them to recycling into a specialized company. If necessary, I will even present confirmation documents. The legality and order are primarily!

41. So, the basic life support systems are ready (in addition to those described, there is still a ventilation system and will later be air conditioning). I will not describe the toilet, since I do not see problems with its device. There are dozens of finished solutions - from the elementary plastic bottle and buckets to the dry latles of different designs, forms and volumes. After all, if you are, reader, you can not independently solve the problem of disposal of several hundred grams of your own excrement, the fact that, baby, are you doing on this site? 🙂

42. Since the end of March 2009, I started a permanent accommodation in my new accommodation, while completing it. Everything is the same - exclusively on weekends. Interior decor in 2009.

46. \u200b\u200b... and the construction has intensified.

50. Restress in the manufacture of steel doors decided from a spare outlet of the 2nd floor (on the roof of the neighbor). Given that I just learned the welding work on the Internet, for the first door, it is not bad. Only the kilogram of electrodes only, began to feel a little the essence of the arc electric welding - to understand the dependence of the current strength from the thickness of the welded metal, the position of the seam, etc. It seems that experience is important in welding - the longer and more boil, the better of the seam.

51. General view of the door of the spare exit.

52. Summer landscape from the backyard - what is not a rustic idyll?

53. Training in welding, go to the main facade.

54. Door of the main entrance from the inside ...

Next you will find the history of the construction of one house from ordinary family. Modest and very limited budget I did not stop them on the way to the dream to acquire your private house. What happened from this, with what difficulties our heroes were encountered and they used what decisions to reduce the cost of construction, this post will tell about all this.

Construction is conducted as cash.

Plot. Burian, no fences. There is an iron garage and email. Pole on the border of the site.

The plot itself cost 400 tr. Bashkiria district, plot 2 km from the city.

Made a fence, bought stages for 5 rubles pcs, crossbars 30.r. Painted garage, paint (olifa + bomb aluminum) 300 rub

It turned out a ribbon foundation, 120 height and 40 width. Kamaz PGS was purchased for 6.t.r. and about 10 bags of cement.

From the moment of buying an account spent about 15 tr.

Credit 40 tr. Bought 10 pallets of aerated concrete blocks, like 36 thousand, the remnants took glue and cement for mixing

Masonry work began.

While spent 55 tr.

Box ready. They laid out not completely (the back wall behind the scenes, it will be a frame, to possibly expand the house and bring it to the scheduled 9.5x9.5).

Bought Mary Bar for 10T.R

Frame back wall.

He began to engage in electricity 10kW. Shield, 3 phase 2 tariff meter, grounding. I gathered completely myself, the electricians simply closed the siep to the post.

Cost 10t.r.

While spent 75 tr.

Made waterproofing foundation. Families were adjusted by B.U. Door. Bought OSB tiles, on 7 tr.

Hired front loader for land. 2t.r.

Flowed foundation.

Began to make a temporary roof. Brucks scaled at 7.r. and ruberoid 2t.r. On the crate for 5 tr.

It is spent almost 100 p. about.

Nadybali wooden windows.

I am 22, Father is 53 years old. Workers. I get 10, and father is 14 tr. I am an electrician and he is a locksmith.

Winter began.

Late in the fall did the well, bought 5 rings 1,200 rubles, the rest of the alkashi died half. Pipes for communications. Bought boards by 6,000 for the ceiling and concrete mixer for 8.

Spent 120 tr.

Made a draft ceiling. Then plan plasterboard or stretching.

San. knot.

Also in April, put water pipe and sewage. Bled concrete tie. Bought 2 pallets of bricks, 10 cement bags, forest sand. Began to make a bathroom.

It has been spent since the purchase of the site, 130 tr.

The other day they spent well:

Shower cabin, for action 10.000

Toilet 3700.

Wash basin with pedestal 2000

Two lever mixers 800

Washing with legs of Ala "Village" for temporary kitchen 1500

EPS 7 sheets for 750 rubles

Polypropylene pipes 600 rubles

5 cement bags 850 p

Rolled soldering iron 200.

Total spent from the moment of purchase 158.000 rubles

Civilization is slowly coming.

Bought a cumulative water heater for 9000. And the pumping station, the stock cost 3,800 rubles.

My work place.

General form.

Garden. In a vegetable garden, cabbage, potatoes, raspberries, currants, grapes, corn, beets, apple tree, torn, carrots, mint, onion, parsley, cherry and more.

And now the expansion of the house. In the constructed part, it is quite comfortable.

Drew a sketch of future expansion.

Extension will be made using tees technology

On video technology tees

5 cylinders of mounting foam 1300

Pistol for foam 500

Chinese metal door 3000

Electroconvector 2kW 2000

Apple tree and plum seedlings 1200

On the street +7, rain. Convector in the afternoon I put on 18 * at night 22 * \u200b\u200bbecause Two-tariff counter. I paid for the email it turned out 1100 rubles in two months.

On our street, a plot with a foundation for 900 TR is selling my economy already calmly pulls on 1.2 cartoon

As I wanted to: lay an EPPS, folgisolone, TP pipes, buy two batteries for 10 sections, electric boiler and later a wood boiler.

It turned out: the ceiling was insulated with folgicone and 10cm polystyrene foam, on the floor under the laminate) 1 convector, it will be necessary to take the second. I think so to overweight, here people in the SIP houses live with convectors. So it goes…

Bought: 12.000r Furnace wood

250 Mounting foam

200 Mailbox

Expect costs every month:

Gasoline 1000.

ELO, Internet, phones 1200

Credit (2 months left) 3000

Food and home goods: 5.000 approximately.

And 8-10 stays at a construction site every month. Norm.

The stove fries, on the street +1. Houses 20+ While burning pallets and other waste.

This month I plan to take the hill and the electric chain saw Makita. I should also 10,000 on a credit card for EPPS and PPS.

We have ready-made brusade houses sell from 1 million (away from the city) with plots. In general, if the merchant sells such a house, it means it will Navar at least 500 k. Work is very expensive, so if you do everything yourself, it turns out very even available.

I bought a washing machine for 10.000 and LCD TV BATT for 9.000 rubles. All like people.

Total, since the beginning of construction, cash was spent in the amount of about 250,000 rubles. (Including machine and TV.)

In February, I will probably connect IPTV and ADSL Internet.

Meanwhile, there were gas on the street. If it turns out, in the fall, I will take a loan and head.

Also in the spring promised water. The cadastral value of the plot is already 850 thousand rubles - good investment, growth of 200%

The average account for electricity is 1100 rubles per month, at the price of 2.40 per kW during the day and 1.40 at night.

In the whole winter, two Gazelles porn on firewood for 1500 rubles each were purchased.

The temperature in the house holds 23 * C, despite the three-meter ceilings. Aerated concrete is perfectly holding heat.

You can estimate the future front of work.

Approximate plan until autumn:

Finish foundation

Build a second half using tees-2 technology

Make a new big roof

Register house

"Register"

Get tax deduction

Connect gas, make gas heating.

Rather and find a new job.

If suddenly get rich, make the foundation for the garage.

Stone fence.

Once again, it was abandoned from vacation, received compensation for unused vacation pays 12 thousand. Lol.

KAMAZ PGS, 5000 rub

Submersible, vibration pump, + hose - 1600

12 cement bags, 3200 rubles

tOTAL: 10.000

At the moment, about 260 thousand is spent.

Today flooded the meter of the foundation.

Today we finished the main foundation, 2 bags of cement remained. Tomorrow will begin the f-she under the veranda.

In the layout of the extended house, you must fit 3 small bedrooms, entrance staircase and one bathroom.

"Height" should not be too big. 5 meters for example, it is clearly a lot. But at the same time, you need to find a balance that the useful area would be sufficient for rooms.

It will be a big plus, if you do not have to disassemble old rafters, giving them some way.

Chose the cheapest version of the TISE machine. The machine is 30 thousand stands, and the walls of tees will be in the same way.

6 rows were laid out, 14. Cement and PGS are slowly ended.

Fence and plot.

Approximately 260 thousand These are all invested money, as long as I do not know, in principle it does not matter, for myself it is done.

Who wants themselves to search for themselves to look for Avito and in local newspapers, you can of course through realtors, they sometimes take in bulk, then cut into pieces, but I do not want to feed the system important thing that the land is owned, the type of land IZh. And who has the opportunity, then come and look at the place, find out. Storge all year round and good electricity. This is enough.

I have the type of land IZH, the land in the property. (Building permission is not necessary, project too)

So, the report. There were a little bit, the credit card bought another 25 bags of cement, and 6 sand cubes for 5,000. The corners on the jumpers cost 1000 rubles.

2 KAMAZ PGS was bought, half of the first batch went to the foundation, half of the second game remained (leaves for the floors)

1 KAMAZ, (6cubes) clean 5000r

55 cement bags, delivery 13.500r

Masonry masonry 500r.

Ruberoid 300r

Total 20,000 rubles. Excellent result!

Finished the walls. Repeated. Started plastering, and blot.

Mounting foam 500 rubles

Sawn on the roof, delivery 18.300 rubles:

Front-line boards 18x5x600 23pcs (rafters, uterus)

Brussia 10x5x600 7 pcs (uterus)

Edged boards, 2 grade 2x10x600 1CUB (Diselet)

And money remained only for food ...

Meanwhile, Sychevalny mutates.

On Saturday, they called relatives, disassembled part of the roof and put 3 rafters, the rest are planning to put on the next Saturday.

Costs: 500 rubles for self-tapping screws and nails

Also today was ordered professional flooring, 156kv.m, 10 meters of skates, 750 self-samples, 140 sq. Meters membrane on the Space for me, 42 thousand rubles.

Paid by a credit card Sberbank.

Bought a screwdriver for 1700r

Methybal products: brackets, nails, screws 500rub

According to the approximate counting currently, funds spent in the amount of 345.000 rubles. A lot of money.

Meanwhile, roofing began.

The other side did not have enough boards on the crates. Buying it is possible from an advance.

We have 2 km or 20 minutes on foot. 10 minutes on the vele.

Bus runs.

We get to work as: get up at 6.20.

at 6.50 we are going on the car to the city (with our father the graphics coincide).

at 7.00, the working cattle truck is departed to the plant, at 7.45 the start of the shift.

Change ends at 16.20, at 16.50, cattle times will take into the city (15 minutes drive) sit down in the car and go home, at 17.30 already there.

If you go by car immediately to work, then at 16.50 already at home, but it is expensive pleasure.

We have no project. Wiring in different ways. In the bathroom hidden, there are already all sockets on an ongoing basis. The remaining cables are still along the wall, in the future they will be packed in the corrugation and remain under the plasterboard.

Ventilation will be sewn in a false plat.

Bought a seedlove of cherry "Besche" 500 rubles

The roof was almost finished, it turned out that the skates lack. With tag tag so far.

Two foam cylinders and a new pistol 1000r

3 cement bags and paint 1000r

TOTAL: 3000.

Put old wooden windows and doors, manually displaced paint.

Started the fill of the floors.

Slowly Gasim's credit card debt, 24 thousand remained.

On the pouring of the floors, 7 cement bags took 1800 rubles

Paint and brush on the windows of the total 2000r.

Today they bought 6 meters of pipe D114 to chimney. 2350 rub. Cheap galvanizing burned.

Tomorrow I will cook and stucked starting inside.

From birth, 22 years old lived in the apartment, now I will not drive back and stick there. Although if I sell the house, I will enjoy 3-à-new in a new building.

Here is freedom, silence. More space for recreation, for example, you can buy a motorcycle or motorboat. Garden by hand.

In the meantime, the roof was finished - they purchased the skates for 2000 rubles, cement at 600. Plastering the back wall.

Also done, a lot of other small worm. Sheltered apple and plums in cases of strong frosts and so on.

Short sheet of construction solutions from 200k:

Try to do everything with your own hands. It is not difficult, the benefit of the Internet. Margin for work in finished houses up to 300%.

Choose the earth correctly - in the property, the type of land is preferably IZh. Road and electricity is the main thing. The rest will apply.

Cheap foundation: tees, msfl

If you do not know at all what material to build concrete is a classic. Baby gardens, hospitals, houses - mostly all concrete.

Solar is always outside (dew point) Read: Thermal Facade insulation technology.

Do not get fond of "modern solutions" from "advisers." The foundations of 500 thousand rubles, and other beggars with the theoretical calculation make the price of building space. Pay attention to old houses.


2021.
Mamipizza.ru - Banks. Deposits and deposits. Money transfers. Loans and taxes. Money and state