17.07.2020

Planning a series of houses p 55. Houses of the P55 series, layouts with dimensions. Appearance and design features


The P-55 series was initially developed as a sound-proof house, with the possibility of erecting near the noisy transport highways. Hence the originality planning solution and the presence of multi-room apartments. The essence of noise protection is to go to the noisy highway non-residential premises And the maximum one living room of a multico apartment.

The main task was to make sure that the urban noise did not get into the rooms of the apartments and did not affect the microclimate there. Also, the P-55 series put the goal of preventing urban noise into internal courtyards. This is achieved due to the installation of sections of houses in the form of an unlocked circle.

The houses of this series are more likely to the late Brezhnev houses, although they were already eighty-nineties, and some of the houses were erected even into two thousandths.

Location in Moscow and the Moscow region

In Moscow, the houses were built in areas: Ochakovo, South Butovo, Hovrino, Pervert, Novokosino, Novogireevo, Veshnyaki, Kuntsevo, Strogino, Otradny, Zamoskvorechye, Ramenki, Kotlovka, Academic, Combat and Multi-Textiles, Textiles, Tsaritsyno, Zelenograd and others.

In the Moscow region were built in cities:, Odintsovo, Reutov, Korolev, Electrogue, Elektrostal, Railway, Erino village.

Square of apartments

Detailed features

Number of sections (entrances)2 or more
Number of floors9, 12, 14. The first floor is like residential and non-residential
Ceiling height2.64
Liftstwo passenger 400 kg
BalconiesIn addition to the first floor, glazed loggias and erkers in all apartments
Number of apartments on the floor4
Years of constructionfrom 1978 to 2002
Perspective demolitionDemolition is not subject to, overhaul do not require.
BathroomsBathrooms: separate, baths: standard, 170 cm long.
Stairsordinary, without a common fire balcony
Garbage chutewith a loading valve on each floor
Ventilationnatural exhaust in Santechkabina (bathroom) and in the kitchen
Walls and facingOutdoor walls: outer walls are ceramzite concrete with increased noise protection. Wall thickness 34 cm. Internal bearing walls - reinforced concrete panels, 14 and 18 cm thick. The partitions of rooms and bathrooms are plastering 8 cm thick. Overlapping - 25 cm thick reinforced concrete plates.

Bearing walls - internal intercoupe and interroom longitudinal and transverse

There are no facing. Colors: white, beige, orange, pink, brown, yellow, blue, sea wave.

Type of roofRoof type: flat; Coating - roller. Technical and attic to accommodate engineering communications
Dignitygood noise insulation, large sizes of bathroom and toilet
disadvantagesrelatively narrow flooring, limited option Redevelopment, difficult mechanical processing of ceramzite-concrete panels
ManufacturerMPSM (included in the Chief Corporation)
DesignersMNIITP (Moscow Research Institute of Tyology and Experimental Design)

Planning

The reasons for which you need to contact us when coordinating redevelopment in the house of the P-55 series:

    1. You have a desire to fulfill everything by law so that in the future not to fall into the difficult situation with inconsistent redevelopment;

    2. You need to sell the object of real estate, and documents do not correspond to the actual state of the object, and you lose cash during sale;

    3. You need to make a loan secured by your real estate, but the Bank refuses due to the presence of impassure redevelopment;

    4. You need to rent real estate, and actual layout does not comply with existing documents;

    5. You want to be sure that there is no vital threat to people and building structures during execution repair work on the planning you outlined;

    6. You received a fine and order of the need to coordinate redevelopment or that it is necessary to return the object to its original state;

    7. Complaints from the neighbors, and you want to replace the claim.

You want to be calm and not be afraid of fines and checks in your room.

Have questions? Call or write, help solve your problem.

2. Coordination of previously performed redevelopment. This type of coordination applies to apartments and on non-residential premises in a residential building (only when the facade of the house does not affect). Read more about coordination of previously executed redevelopment Read here:

3. Redevelopment / Reconstruction that can be coordinated by typical project. TO this kind The coordination includes typical series of houses (panel, block), developed by the author of the project JSC "MNEITP". In this case, the biggest problem of people planning to redevelopments is that it is necessary to strictly guide this project and with the slightest retreat from it will be required to coordinate the project project (paragraph 1 of this List).

4. Redevelopment that does not require coordination and amendments to PTA plans. Such works include: sticking wallpaper, replacement of flooring on a similar, replacement of windows, replacement of sanitary equipment (without permutation), rearrangement of a dishwasher or washing machine, replacing interroom doors.

What company experts will be engaged in your documents

  • Head of Coordination Department
  • Specialist in coordination having experience in this field for at least 3 years (fixed behind your object)
  • Engineer for inspection of buildings and structures (to fulfill technical conclusion)
  • Engineer Designer, developing a refreshing project
  • Chief Engineer
  • Accountant
  • Secretariat

Wall Material: Panel
Number of sections (entrances): from 2
Number of floors: 12-16, the most common option is 14. The first floor is most often non-residential
Ceiling height: 2.64 m.
Elevators: Framesazhires 630 kg. and passenger 400 kg. In sections above 14 floors, 2 passenger elevators in 16-storey sections
Balconies: Loggias in all apartments (since 2003 helagled by the developer)
Number of apartments on the floor: 4
Year of construction: 1997-2008

In Moscow, the House of the P-55m series was erected as in new areas: Maryinsky Park, South Butovo (including Moscow Part of Shcherbinka), Zhulebino, so on the site of the demolished 5-storey: Kuntsevo, Academic, Nizhny Novgorod st., Falcon, Perovo , Ochakovo, etc.
Number of houses in Moscow: about 30 (taking into account the modification of P-55-30m). In the suburbs and regions of the Russian Federation at home typical series P-55m did not build

  • Square of 1-room apartments: total: 50-52 square meters. m., living: 21-22 square meters. m., Cuisine: 12-13 square meters. m.
  • Square of 2-room apartments: total: 66-70 square meters. m., living: 38-39 square meters. m., Cuisine: 11-12 sq. M. m.
  • Square of 3-room apartments: total: 83-109 square meters. m., living: 49-58 square meters. m., Cuisine: 11-12 sq. M. m.
  • Square of 4-room apartments: total: 99-124 square meters. m., living: 64-72 sq. M. m., Cuisine: 11-12 sq. M. m.
  • All rooms in apartments panel houses Typical series P-55M isolated. In the hallway there are pantry (dark rooms). Bathrooms: separate, in 3- and 4-bedroom apartments of 2 bathrooms, baths: standard, 170 cm long.
  • Stairs: ordinary, without a common balcony. Garbage: with a loading valve on each floor
  • Type of kitchen plate: electric

Walls in new buildings of the standard P-55m series: outer 3-layer ceramzite concrete with a total 34 cm. Inner walls - reinforced concrete without insulation, 14 cm thick. And 18 cm. Non-relaxing partitions of rooms and bathrooms - reinforced concrete thickness 8 cm. Overlap - large-sized beasts reinforced concrete plates with a thickness of 14 cm.
Carrier Walls: Internal Emerquarters and Interior Longitudinal and Transverse
Section type (entrances): row (ordinary), rotary (angular)
The number of steps in the section (entrance): 8, 10. The width of the step (the distance between two adjacent transverse bearing walls, the width of the overlap span): 300 cm, 420 cm, the width of the case: 14.4 m.
Facing, plaster outdoor walls: cladding with tiles of only the earliest buildings (1990s). Color options for external walls: white, beige, brown, yellow, orange, pink, blue, sea wave. In the deaf ends sometimes there is a pattern
Roof Type: Flat

Distinctive features: Houses of the Model Series P-55m, created on the basis of the noise protection series P-55 (built from 1984 to 1997), compared to it have a wider building, and, accordingly, increased areas of rooms, kitchens, halls, common areas of apartments . Also in P-55m there were second bathrooms in 3- and 4-room apartments

Other advantages: P-55m also relates to a series with increased noise protection (but not due to the presence of noise-absorbing elements, but due to layouts): the windows of all bedrooms, according to the project, should go to the courtyard, and on the street - only kitchens, living rooms and staircases. Ladial elevator node is designed to take into account the unimpeded access of disabled people from the street to mark the floor of the 1st floor

disadvantages: Narrow rooms - "Pencils", limited possibility of redevelopment of apartments (the opening in the bearing wall is possible only on the upper floors and with a mandatory enhancement frame device)

Manufacturer: MPSM (included in the Chief Corporation)
Designer: MNIITEP (Moscow Research Institute of Tyology and Experimental Design)
At the beginning and mid-2000s. Also built at home modified version of P-55-30m with the end section, in the rest of the P-55-30m almost identical to P-55m


Floors: 12, 14, and 16 floors
Height residential premises : 2.64 M.
Building construction : Outer walls - three-layer panels with a thickness of 340 mm, with increased noise insulation. Internal - reinforced concrete thickness 140 and 180 mm. Partitions - 80 mm. Overlap - reinforced concrete thickness 140 mm
Lifts: Two passenger elevators with a lifting capacity of 400 kg
Ventilation: Natural exhaust through ventblocks in the bathroom and in the kitchen.
Garbage chute: With loading valves on each floor.

The first option to lay out the P-55M section.

The main entrance to the house.

One-room and four-bedroom apartments.

In the houses of the P-55m series

The second option to lay out the P-55M section.

The main entrance to the house.

Two-room and three-bedroom apartments.

In the houses of the P-55m series



Planning a one-room apartment in the house of the P-55m series.
total area Apartments 49.97 square meters. m.
Living area of \u200b\u200b21.40 square meters. m.
Kitchen 11.94 square meters. m.
Separate bathroom.

Planning a four-room apartment in the house of the P-55m series.
The total area of \u200b\u200bthe apartment is 99.33 square meters. m.
Living area 66.38 square meters. m.
Kitchen 11.20 square meters. m.
Separate bathroom.
The area of \u200b\u200bthe bathroom is 3.9 square meters. m.
Second bathroom.
In the houses of the P-55m series


Good houses with good noise insulation, large size of the bathroom and toilet, out of disadvantages can be noted relatively narrow fame rooms, limited to redevelopment of apartments.

Discussion of the houses of this series on the forum:

  • Manufacturer: MPSM (included in the Chief Corporation)
  • Designers: MNIITP (Moscow Research Institute of Tyology and Experimental Design)
  • Bathrooms: in standard hemoplating, baths: standard, 170 cm long.
  • Stairs: ordinary, without a common fire balcony
  • Garbage: with a loading valve on each floor
  • Ventilation: Natural exhaust in Santechkabina (bathroom) and in the kitchen
  • Outdoor walls: outer walls are ceramzite concrete with increased noise protection. The wall thickness is 34 cm. Internal bearing walls are reinforced concrete panels, 14 and 18 cm thick. Partitions of rooms and bathrooms - gypsum concrete 8 cm thick. Overlapping - 8-cm thick reinforced concrete plates.
  • Carrier walls: internal intercommour and interroom longitudinal and transverse.
  • Roof type: flat; Coating - roller. Technical and attic to accommodate engineering communications
  • Number of sections (entrances): 2 or more
  • Number of floors: 12-16. The first floor is like a residential and non-residential
  • Ceiling height: 2.64 meters
  • Elevators: Passenger 400 kg, two cargo-passenger 630 kg.
  • Balconies: Besides the first floor, glazed loggias and erkers in all apartments
  • Number of apartments on the floor: 4
  • Year of construction: from 1997 to 2000

Advantages and disadvantages of the series

  • Advantages: Good noise insulation, large size bathroom and toilet, cargo-passenger elevators, spacious loggias
  • Disadvantages: relatively narrow indoor cases, limited redevelopment possibility, difficult mechanical processing of ceramzite-concrete panels

2021.
Mamipizza.ru - Banks. Deposits and deposits. Money transfers. Loans and taxes. Money and state