17.07.2020

Projects of houses p 3m corner. Typical series of home P3M. Features of apartment planners


The houses of the P-3M series are a modified version of P-3 (C 1975 to 1998.) And often built as social housing with additional insulation of outdoor walls. Since 2010, on the basis of the series, two modifications were developed: P-3M-7/23 - modification with increased (from 19 to 23) by the number of floors, the third elevator and increased apartments and P-3MS - "Social" modification - with the same The width of the rooms and with more modern facades.

Flower range of outdoor walls. Diverse: white with beige, yellow, salad, blue, pink, orange, brown. Facing tiles have houses since 2010.

In the houses of the P-3M series, the number of floors varies from 8 to 17. The first floor is housing and not residential. The number of entrances from 1 or more. Each entrance has elevators: one passenger carrying capacity of 350 kg. And one cargo-passenger carrying capacity of 500 kg.


Number of apartments on the floor 4. All rooms in the apartments of the P-3M series houses isolated. IN one room apartments Living area 14-18m², kitchen 9-10 m²; In two-room residential 32-34 m², the kitchen is 9-10 m²; In three-room residential 43-50 m², a kitchen is 10 m²; In four-room residential 63-66 m², a kitchen is 10 m². In angular three- and four-room apartments, there are dark rooms / storerooms.

The bathroom is separate in all apartments, in four-bedroom two bathrooms, baths: standard, length 170 cm. Ventilation is a natural exhaust through the ventblocks (bathroom and kitchen). in two-, three- and four-bedroom apartments There are loggias or round balconies, since 2002 is glazed, two-chamber double-glazed windows with increased energy efficiency are installed on the windows. The garbage grid is located on each floor with a loading valve. Stairs without a common balcony.


Domestic inter-weltering walls: transverse - precast concrete panels with thickness 14cm., Longitudinal - precast concrete panels with thickness 18cm. Outdoor walls - three-layer panels with an effective insulation thickness of 30 cm. Gypsum concrete partitions 8 cm. Overlapping - 8-minute reinforced concrete plates with a thickness of 14 cm. Bearing walls three-bedroom apartmentsah, unlike the family of the P-44 series, the wall between the larger room and the corridor is also carrying). Longitudinal wall between rooms in three- and four-room apartments carrier.

Advantages: have increased thermal insulation, built-in wardrobes, as well as an automatic smoke removal system. Apartments in such houses have already surrendered with the finished finish. Disadvantages: almost all walls carriers.

Series of panel housesP-3M. The list of demolished does not include, the probability of demolition is even in the long run.

A series of houses P-3M is a new version of the popular Moscow series. Thanks to high economic indicators gained widespread in Moscow and the Moscow region. The outer walls were replaced by three-layer with increased thermal insulation, erkers were added to layouts, and rounded balconies. The series was designed in the mid-1990s. Years of construction: from 1996 to the present.

In Moscow, the P-3M series has been built in new microdistricts: Ramenki, Novo-Peredelkino, Zhulebino, Lublin, Marynsky Park, Northern and South Butovo, Mitino and Volzhsky (Textiles-Kuzminki). Also at home of the P-3M series are built on the site of the demolished five-story buildings and in advance reserved sites in the neighborhoods :: Cherryormushki, Zyuzino, Belyaevo, Konkovo, Yasenevo, Degunino, Sviblovo, Kuntsevo, North Tushino, Hovrino and Marfino.

In the Moscow region of the new building of the P-3M series built / are built in new city microdistricts: Khimki (Jubilee, Novokurkino), Krasnogorsk (Pavshinskaya floodplain), Podolsk (grasshoppers), Odintsovo (new three-chungy - Kutuzovsky), Mytishchi (Yaroslavsky), Lyubertsy (Red Gorka, Lyubertsy fields), Kotelnik.

All rooms in the apartments of the houses of the P-3M series isolated. In all apartments, spacious loggias, erkers are located, starting from the fifth floor .. Each entrance is installed one passenger and one g
ruzopassazhir elevator. Separate bathrooms in all apartments. Ladders are unclear, the fire fighting balcony is missing. The kitchen stove is electrical, the ventilation is natural exhaust, blocks in the kitchen and in the bathroom. Garbage on the stairs, with a loading valve on the site.

A series of houses P-3M (modified) is essentially a modification of the popular Moscow series. The main improvements touched the outer walls (they became three-layer, with increased thermal insulation) and adding erkers and round balconies to layouts. Constructive differences from the basic version are insignificant. Apartments in new buildings of the P-3M series are often sold with finishing

On the basis of the P-3M series also developed a modification of P-3M-6 to resettle the residents of the demolished residential foundation. On each floor there is 6 apartments (1-2-1-1-2-1) reduced areas.

In 2010, two new modifications were developed on the basis of the P-3M series. - Modification with increased (from 19 to 23) by the number of floors, third elevator and increased apartments. P-3ms - "Social" modification - with the same width of rooms and with more modern architectural decision facades.

Detailed features of the series

Passagesfrom 1.
Floorsfrom 8 to 17, the most common options - 14, 17.
Ceiling height2.64 m.
LiftsOne passenger (350 kg) and one cargo-passenger (500 kg.).
BalconiesLoggia in all apartments, starting from the second floor, erkers starting from the fifth floor.
Apartments on the floor4 (in the modification of P-3M-6 - 6 apartments)
Years of constructionfrom 1996 to the present. time
Built houses160
Square of apartments1-room apartment Total: 35-38 m², living: 14-18 m², kitchen: 9.1-10 m²
1 bedroom apartment (P-3M-6) Total: 34 m², living: 14.3 m², kitchen: 7.4 m²
2-room apartment Total: 53-54 m², living: 32-34 m², kitchen: 9.1-10 m²
4-room apartment Total: 91-105 m², living: 63-66 m², kitchen: 10-10.2 m²
BathroomsSeparate in all apartments, baths enlarged.
StairsNon-challengable, the fire fighting balcony is absent.
Garbage chuteWith a loading valve on each floor.
VentilationNatural and forced exhaust, in the kitchen and bathroom.
Walls and overlapsThe outer walls are reinforced concrete three-layer panels with a thickness of 30 cm. Memcarted and interior reinforced concrete panels 18 cm thick and 14cm. Gitzobetonic partitions 8 cm thick. The overlap of reinforced concrete slabs with a thickness of 14 cm.
Bearing wallsLongitudinal intercorpoils (and most interior) and transverse (escarm, interroom and inter-worn)
Colors and claddingWhite with beige, yellow, salad, blue, pink, orange or brown.
There are no facing. Since 2010 - facing tiles.
Type of roofFlat with a warm attic, coating - a two-layer rolled. Technical floor: above the top residential floor.
DignityThe presence of erkers, built-in cabinets. In the corner sections, there are dark rooms. Automatic smoke removal system
disadvantagesLimited opportunities Redevelopment
ManufacturerHouse-building plant №3 - DSC-3 (included in the group of companies of the Peak),
Kursk Factory of the efficiency (large-passenger house-building)
DesignerMNIITEP (Moscow Research and Design Institute of Tyology and Experimental Design)

In many ways, this is the merit of design with bright facade paints (as opposed to P-44T, the P-3M houses are not tiled, but color), rounded balconies and erkers.

Structurally P-3M is panel multisective houses height from 8 to 17 floorswith 1-, 2-, 3- and 4-bed apartments.There are many varieties of typical P-3M sections, which allows you to build residential buildings of various configurations or variable floors.

All rooms in the apartments are made isolated, almost all intra-quarter walls bearing. In three-room apartments, the wall separating from the corridor adjacent to the kitchen room is self-supporting, it is impossible to affect it. Corner three- and four-bedroom apartments have dark rooms. Odnushki is deprived of balconies and loggias that are present in all other apartments.

Square apartments in P-3M from 35 sq.m (odnushka) to 105 sq. M (four-room), and the kitchen is 9-10 sq.m.

From the floor to the ceiling in apartments - 2.64 m. Engineering communications are bred in the technical floor and in the basement. The entrance is equipped with two elevators. Outdoor walls - 30 cm clay concrete panels, internal concrete - 14 cm. The thickness of the hypsobetonic partitions is 8 cm. Overlap - concrete panels with a capacity of 14 cm. In 3- and 4-room apartments, erkers were made in 4-room apartments Bathroom.

Currently, along with the base series, P-3Ms are built at home series, which are the further development of the P-3M project.

Photo of houses of the P-3M series

P-3M layouts with dimensions

Planning with the sizes of three-bedroom apartments of the P-3M series (BTI)

Planning with the sizes of two four-room and one P-3M ds (on BTI)

Redevelopment of apartments of the P-3M series: options before and after

One bedroom apartment

One bedroom apartment - plans before and after redevelopment

The reasons for which you need to contact us when coordinating redevelopment in the house of the P-3M series

1. You have a desire to fulfill everything by law so that in the future not to fall into the difficult situation with inconsistent redevelopment;

2. You need to sell the object of real estate, and documents do not correspond to the actual state of the object, and you lose cash during sale;

3. You need to make a loan secured by your real estate, but the Bank refuses due to the presence of impassure redevelopment;

4. You need to rent real estate, and actual layout does not comply with existing documents;

5. You want to be sure that there is no vital threat to people and building structures during execution repair work on the planning you outlined;

6. You received a fine and order of the need to coordinate redevelopment or that it is necessary to return the object to its original state;

7. Complaints from the neighbors, and you want to replace the claim.

8. You want to be calm and not be afraid of fines and checks in your room.

Have questions? Call or write, help solve your problem.

Description of the house

Planning solution Panel residential buildings from medium, end and angular four-quarters of sections from 1, 2, 3, 4-room apartments. In three and four-room apartments Erkers
Floors 8 -16 Floors
Height residential premises 2.66 M.
Technical buildings Technical and attic for placement engineering communications
Lifts Passenger lifting capacity of 400 kg and cargo-passenger - 630 kg
Constructive solution Wall system. The outer walls are three-layer self-supporting panels with an effective insulation, wall thickness - 300 mm. Internal bearing walls are reinforced concrete, 140, 180 mm thick. Gypsum concrete partitions, 80 mm thick. Cleansing - reinforced concrete panels with a thickness of 140 mm.
Heating Central water
Ventilation Natural exhaust, through vents in Santechkabin and corridor
Water supply Cold and hot water from the city network
Other Garbage with loading valves on each floor

Accommodation apartments in the section

Prices for coordination of redevelopment in the house of the P-3M series

Redevelopment in the house of the P-3M series

Price for approval

Individual Calculation Request

Project and technical conclusion

Getting permission

Obtaining an act, BTI and extracts from the USRP

Redevelopment of the apartment without affecting the supporting structures from 20,000 rubles. from 30 000 rubles. from 60,000 rubles.
Redevelopment non-residential premises without affecting supporting structures from 40,000 rubles. from 100,000 rubles. from 100,000 rubles.
Redevelopment of an apartment with an opening device in the bearing wall from 100,000 rubles. from 60,000 rubles. from 60,000 rubles.
Redeveloping non-residential premises with an opening device in the bearing wall from 120,000 rubles. from 100,000 rubles. from 100,000 rubles.

The P-3M series was developed on the basis of a popular and fair distributed in the capital of the P-3 project, which was built and panel houses In the Olympic village. Construction differences in these series are a bit, although P-3M is more modern and comfortable housing. The P-3M buildings are erected both at the site of the demolished domestic housing (point) in already built-up areas, so with the mass development of new microdistrict. In the house of P-3M often moved the tenants of the demolished housing foundation.






Design features series

The series of the series can have from 8 to 17 floors, but 14- and 17-storey options are most often found. The first floor of P-3M can be both residential and allotted infrastructure.

A series of houses P-3M includes several modifications of ordinary and angular sections with various variations of their combination. On each floor of the section there are 4 apartments, there is an P-3M-6 version, in which there are 6 apartments on the floor.

In the design of the outer walls of P-3M, panels made on advanced technology are used - three-layer with a special locking plates. Such a technology, an additional insulation layer between reinforced concrete panels And the high-quality treatment of interpanel seams provide increased thermal insulation of the premises. Each section has a passenger and cargo-passenger elevator. For engineering communications, non-residential places of technology and basement are highlighted.

Features of apartment planners

Planning in apartments P-3M thoughtful, modern and sufficiently comfortable for living. In all the apartments of the series (except "odds"), balconies of either loggia are provided, which since 2002 the developing windows are installed by the developer. In the apartments above the 5th floor there are erkers. All residential rooms in P-3M apartments are isolated, but dark rooms may have dark rooms in the corner 3- and 4-room apartments - this deficiency has not been eliminated when working on the basic version of the project P-3.

Carrying walls are all intercomparic panels and most of the interroom, which significantly limits the possibilities for redeveloping housing. The plus of apartments in this project is considered to have built-in wardrobes, antlesole, two bathrooms in a four-room apartment, equipping houses with an automatic smoke removal system. Kitchens are equipped with electric stoves; Separate bathrooms with enlarged length - 180 cm.





Specifications

Parameter

Value

Alternative name:
P-3M.
Construction regions:

Moscow: Novo-Peredelkino, Zhulebino, Lublin, Maryinsky Park, Northern and South Butovo, Ramenki, Mitino, Cherryomushki, Zyuzino, Belyaevo, Konkovo, Yasenevo, Sviblovo, Marfino, Kuntsevo, North Tushino, Hovrino, Degunino et al.;

Moscow region: Khimki, Mytishchi, Lyubertsy, Krasnogorsk, Podolsk, Odintsovo

Construction technology:
panel
Under the construction period: modern
Year of construction: from 1996 to the present
Movement Perspective: Demolition is not provided
Number of sections / entrances: from 1.
Number of floors: 8-17
Ceiling height:
2.64 M.
Balconies / Loggia:
Loggias, Balconies and Erkers in 2-, 3- and 4-room apartments
Bathrooms:
Separate; Baths - enlarged, 180 cm long. In 4-room apartments Two bathrooms
Stairs:
Unlucky, without a common balcony
Garbage chute:
Loading valve garbage chute on each floor
Elevators:
Passenger - 350 kg, cargo-passenger - 500 kg
Number of apartments on the floor:
4
Apartment Square:
Total / residential / kitchen
1-room apartment 35-38/14-18/9-10
2-bedroom apartment 53-54/32-34/9-10
3-room apartment 74-85/43-50/10,2
4-room apartment 91-105/63-66/10,2
Ventilation:
Natural exhaust with blocks in the kitchen and bathroom.
Walls and cladding:
Exterior walls - three-layer zb-panels (30 cm)
Transverse ZBS - Emerquartered walls (18 cm)
Longitudinal intercorporation and interroom walls - ZHB panels (14 cm)
Inter-storey overlap - large-sized mining zb-slabs (14 cm)
Facades shuffled until 2010, after that we were faced with tiles
Roof type:
Flat, with warm attic
Manufacturer:
DSC-3.
Designers:
MNIITEP
Advantages:
The presence of erkers, built-in cabinets, as well as an automatic smoke removal system
Disadvantages:
Limited redevelopment capabilities; In the corner sections there are dark rooms

2021.
Mamipizza.ru - Banks. Deposits and deposits. Money transfers. Loans and taxes. Money and state