2. . The type of foundation is selected by calculation. The calculation will require geology (geological engineering study of the soil). Be sure to have sheets with a reinforcement scheme, a foundation device. nodes and the amount of concrete and reinforcement or foundation blocks.
3. . The blind area is not an element of improvement, but a necessary structural element, its device is mandatory.
4. masonry plans. This is a plan of masonry walls with dimensions. Performed for each floor - how many floors, so many plans.
5. facades. 4 sheets with facades.
6. . At least two cuts: longitudinal and transverse. In houses of a complex configuration, cuts are usually performed more in order to show all the level differences and difficult places.
7. For piece materials, we do ordering so that we do not have to cut blocks, we select a convenient structural height of the floor, windows and other openings and elements.
8. Wall drills. On the scans, you can clearly see all the marks to which it is necessary to lay the masonry. A scan for each wall is performed. There are many walls, respectively, and many sheets.
9.Cover plan. How many overlaps there will be so many plans. Overlappings are monolithic reinforced concrete, from prefabricated hollow-core reinforced concrete slabs, wooden, prefabricated from blocks. For each drawing, the number of materials is indicated.
10. Plans for monolithic belts under floors or brick belts, if such are required.
11. This is a plan with the location of the jumpers above the windows and doors.
12. . Plan with the designation of windows, doors, types of floors. Together with these plans, lists of windows and doors, floor explication are carried out.
14. If the roof is pitched. Along with this drawing, plans for load-bearing roof elements, roof units, roof sections and, of course, the calculation of the number of roof elements are also carried out. If flat, then other drawings are performed.
The composition of the roof or the "pie" of the roof
15. Knots and details. These drawings are different for every project.
16. Stairs and porches.
17. Ventilation channels. Ventilation in a private house is provided by natural channel, respectively, ventilation ducts are laid in the structure of the house during construction. Therefore, this section is not included in the engineering section (OV - heating and ventilation), but in working drawings.
18. . The amount of materials on the walls of the house is indicated (how many and what blocks, bricks, insulation, etc.).
20. Other drawings. There may be drawings of beams, support pads. embedded parts, pools, vegetable pits, etc. A set of additional drawings depends on the chosen design of the house.
Why do we need working documentation (section AC)?
2. The presence of drawings significantly speeds up the construction of a house and simplifies communication with builders.
3. Construction of a house with a working draft is a guarantee that the house will not collapse and it will be possible to live in it, since during the design, structural calculations are carried out.
General information about the development of the AP project section
"Design of buildings and structures" - an organization that has been on the market for design services for more than 10 years. Employees of our company develop all sections of the working and project documentation all stages, including the AR section - Architectural solutions.
AP project - a section of working and project documentation, which contains solutions that take into account social, economic, functional, engineering, technical, fire, sanitary, environmental, architectural and artistic and other requirements for the object in the amount necessary for the development of documentation for construction object. The AP project section presents the architect's vision of the object, based on the Customer's assignment: the external and internal appearance of the building, functional, spatial organization.
Composition of the AP brand project
As a rule, the composition of the project documentation for the AR project is standard, established by the Decree of the Government of the Russian Federation dated February 16, 2008 No. No. 87 and consists of the following parts:
The title page is the title page of the AP project. The design can be standard, according to GOST 21.501-93, or according to a sample agreed with the Customer.
The text part, in which information about the object is written point by point, in accordance with Decree No. 87:
a) description and justification of the external and internal appearance of the capital construction object, its spatial, planning and functional organization;
b) justification of the adopted volumetric and architectural and artistic decisions, including in terms of compliance with the limiting parameters of the permitted construction of a capital construction object;
c) description and justification of the compositional techniques used in the design of facades and interiors of the capital construction object;
d) description of solutions for finishing the premises of the main, auxiliary, service and technical purposes;
e) a description of architectural solutions that provide natural lighting for premises with a permanent stay of people;
f) description of architectural and construction measures that ensure the protection of premises from noise, vibration and other impacts;
g) description of solutions for light protection of the object, ensuring the safety of aircraft flight (if necessary);
h) description of solutions for decorative, artistic and color finishing of interiors - for non-industrial facilities.
Graphic part, with drawings:
a) display of facades;
b) color scheme of facades (if necessary);
c) floor plans of buildings and structures with explication of premises - for non-industrial facilities;
d) other graphic and exposition materials, performed if the need for this is indicated in the design assignment.
AR design cost
The cost of developing each AR project is individual and is calculated based on the following input data:
The draft design is the main source document. This section is the concept of the future object. It can be ordered both in our organization and in other architectural bureaus. Many architectural companies are engaged only in preliminary design and do not commit themselves to further development of project and working documentation of objects, unlike our organization;
The area of the object;
Terms of development of design and working documentation.
Estimation of the cost of design work of the section of the AP project is made only after the provision of the preliminary design by the Customer. If the Customer does not have a draft design, then it is necessary to order it from us or in any other design office.
Deadlines for the development of AR documentation
The timing of the development of the AR project directly depends on the complexity of the design object and its volume, on the functional purpose of the building. In order to accurately determine and agree on the deadlines for the execution of the design documentation for the section of the AP project, it is necessary to study in detail the Customer's terms of reference, the Draft Design or other documentation. The speed of production of project documentation for the AP section may be affected by changes made by the Customer, errors found in the Draft Design, the desire to change the general concept or part of it. In general, thanks to the serious experience of our architects, their technical skills, Designing Buildings and Structures LLC quickly develops design documentation for transfer to the Customer and makes changes immediately after their approval.
Development technology and design of AR projects
The technology is based on the use of the most modern software systems.
AR projects are made by experienced architects, in parallel, coordination with related sections of engineering and the designer is carried out.
Design is used both on a plane (plans, facades, sections) and three-dimensional design (models of buildings in 3D).
The AR project is drawn up in accordance with the requirements of regulatory documents, at the request of the Customer, it is possible to make changes to the design of the project.
The specialists of our company perform work in such programs as Archicad, Autocad, 3ds max, etc.
Our advantages in designing an AP project section
Order projects of modern houses in the style of a chalet or buy ready-made house designs. Entrust the design to an experienced architect.
Designing a house takes place in comfortable conditions, at a convenient time for everyone.
Prices and terms
The development of a project for an individual residential building lasts 2-3 months. The cost of all design stages is $22/m2.
We accompany the construction progress with consultations, and according to the sent photographs - architectural supervision.
Remote design of houses - high-quality services of an architect in comfortable conditions.
Modern houses can significantly reduce the cost of heating or air conditioning houses, the design of a modern house includes new materials. Order the development of AR and CR sets of construction drawings for a modern house, this will help to avoid mistakes in the construction of your chalet house, it is the architects who will suggest a comfortable layout projects and beat the location of the chalet house on your site. Private architect will collect the initial data, compare it with the climate of the site of the future home and create a balanced and modern home, while the finished projects houses unable to complete all tasks.
First of all, it is necessary to determine the architectural style of the future home. It can be modern, classic or a chalet project, a private architect will help you in choosing a design at home in the style of a chalet or order a project of a modern country mansion and enjoy the evenings in a comfortable and thoughtful home. Nowadays, energy-efficient or so-called "smart" houses are gaining popularity, which cannot be typed and sold as finished projects, because each individual customer is demanding on special details, so it is important to order a set of AP drawings from an experienced architect. Surely you had to visit houses that were built without projects and therefore, perhaps, experienced layout flaws or cracks in the walls. These and many other problems occur due to deviations from modern building codes, often because construction is going on without projects and architectural supervision.
- List of sheets
- General information. Premises area
- prospects
- Plot map
- Marking plan of the 1st floor
- Marking plan of the 2nd floor
- Attic marking plan
- Roofing design
- facades
- Decorative facade elements
- cuts
- Specification of elements for filling external openings. Sketches
- Principal knots for sections and facades
- Ventilation ducts and chimneys
- Schematic diagram of the construction of a foundation pit for the foundation of a house
- Schematic diagram of the construction of a pit for the foundation of the porch
- Schematic diagrams of input and output of engineering networks
- Plan and 3D view of preparation for foundation ribs and slab at el. -0.850
- Plan and 3D view of foundation ribs
- Plan of the foundation slab at elev. -0.850. 3D view of the foundation without insulation.
- Plan of additional reinforcement of the foundation slab at el. -0.850
- Plan of the foundation slab at elev. -0.200
- Plan of additional reinforcement of the foundation slab at el. -0.200
- Foundation sections
- Fundamental reinforcement schemes
- Reinforcement of the outer stairs
- Layout plans for horizontal and vertical insulation
- Schematic diagrams of hydro and thermal insulation of the foundation
- 3D view of the foundation
- The staircase is internal. 3d view of reinforcement
- Principal section along the wall. Technical instructions for stone structures
- Schematic diagrams of the jumper device
- Masonry plan of the 1st floor. 3d view of the walls of the 1st floor
- Masonry plan of the facing layer of the 1st floor
- Niche plan of the 1st floor
- Plan and 3D view of the cofferdams at el. +3.150
- Principal schemes of floor reinforcement at elevation +3.150 and +6.650
- Scheme of docking of floor reinforcement
- Plan and 3D view of the floor at el. +3.150
- Plan for additional reinforcement of the floor at elevation 3.150
- Masonry plan of the 2nd floor. 3D view of the walls of the 2nd floor
- Masonry plan of the facing layer of the 2nd floor
- Niche plan of the 2nd floor
- Plan and 3D view of the cofferdams at el. +6.450
- Plan and 3D view of the cofferdams at el. +6.660
- Plan for additional reinforcement of the floor at elevation +6.660
- Attic floor plan
- Plan and 3D view of a monolithic belt under the Mauerlat
- Plan and 3D view of Mauerlats
- Plan and 3D view of racks, beds and girders
- Plan and 3D view of the truss system
- Sections on rafters
- Principal nodes on the truss system
- Terrace. Plans of metal racks and beams
- Terrace. Terrace column plan
- Terrace. The plan of the enclosing structures of the terrace. Plan of floor beams.
- Terrace. Cuts.
- Garage. Plan of the monolithic belt at el. +2.715
- Garage. Plan of floor beams
- Garage. Run plan for elev. +3.970. Plan of monolithic belts at el. +2.850 and +3.065
- Garage. cuts
- Garage. Section fragments
- Porch 2. Plan of metal racks. Plan of floor beams
- Porch 2. Plan of enclosing structures
- Porch 2. 3D views
- Roof at el. +5.181. Plan of monolithic belts under the rafters
- Roof at el. +5.181. Rafter Plan
- Roof at el. +5.181. Roofing design
- 3D views of the load-bearing structures of the garage, terrace and porch
- Porch 1
- stairs